Engineering & Maintenance Department

SCOPE OF WORK
PR / PO NUMBER

NAME OF WORK Replacement Pipe R.O (Stainless Steel)

1. ITEM OF WORK
Replacement R.O pipe pvc existing with pipe stainless steel

Commisioning Test
2. MATERIAL BY USER

3. MATERIAL BY CONTRACTOR
Flange 3 in ( Stainless Steel ) 2 pcs

Pipe 3 in ( Stainless Steel ) 1 pcs

Tee 3 in ( Stainless Steel ) 2 pcs

Reducer 3 x 2 in ( Stainless Steel ) 4 pcs

Ball Valve 2 in ( Stainless Steel ) 4 pcs

Tee 2 in ( Stainless Steel ) 2 pcs

Pipe 2 in ( Stainless Steel ) 4 pcs

Elbow 2 in ( Stainless Steel ) 10 pcs

Flange 2 in ( Stainless Steel ) 10 pcs

Flange 2 in ( PVC ) 10 pcs

Water Mur Flow Meter 2 ½ in ( Stainless Steel ) 4 pcs

Water Mur Flow Meter 2 in ( Stainless Steel ) 8 pcs

Water Mur Flow Meter 1 ¼ in ( Stainless Steel ) 4 pcs

Elbow 1 ¼ in ( Stainless Steel ) 6 pcs

Pipe 1 ¼ in ( Stainless Steel ) 2 pcs

Tee Reducer 2 x 1 ¼ in ( Stainless Steel ) 2 pcs

Shock Napple Drat Outside Inside 1 ¼ x 3/4 ( SS ) 2 pcs

4. CONSUMABLE MATERIAL
All consumable material must be provide by contractor

Prepared By Checked By Aproved By

Ariij Kafurriza Muhamad Renaldy Agung Widodo