You are on page 1of 1

NOTES:

MATCH LINE PART-A


MATCH LINE PART-B
1- READ THIS DRAWING IN CONJUNCTION
WITH ALL OTHER RELEVANT DRAWINGS.
2- FOR PART-A,B,C,D & E REFER
365.00 J-21 J-2 DRAWING NO. NR II-ED-05-PH-04a,04b,04c.
J-1 FL=359.70' FL=359.70' FL=360.00' 3- CONCRETE THRUST BLOCKS SHALL BE
FL=359.70' IL=354.70' FL=359.40' FL=358.20'
IL=354.70' J-3 IL=355.00' J-24 FL=358.97' FL=358.48' FL=358.43' FL=358.35' FL=358.30' FL=358.24' ADDED AT PIPELINE BENDS AND TEES
IL=354.70' FL=359.70' FL=360.31' J-23 FL=359.55' IL=354.40' IL=353.20'
FL=359.24' IL=353.97' IL=353.48' IL=353.43' IL=353.35' IL=353.30' IL=353.24' REFER DRAWING NO.NR II-ED-05-PH-22.
IL=354.70' IL=355.31' IL=354.55' J-4 FL=358.73' J-7
J-22 IL=354.24' J-26 J-28 FL=358.50' J-5 FL=358.38' J-30 FL=358.33' J-32 FL=358.25' J-34 FL=358.23' FL=358.18' FL=358.15'4- FOR AIR VALVE INSATALLATION REFER
360.00 J-25 IL=353.73' IL=353.50' IL=353.38' IL=353.33' IL=353.23' IL=353.18' IL=353.15' PUBLIC HEALTH B.O.Q SECTION 1.1,
IL=353.25'
Elevation (ft)

J-27 J-29 J-35 J-36 J-8 SCHEDULED ITEMS,ITEM #8 & NON SCHEDULED
J-6 J-31 J-33
ITEMS,ITEM #2.
A.R.V 5- FORCE-MAIN LOCATION CAN BE ADJUSTED AS
PER SITE CONDITIONS AFTER THE APPROVAL
18.0 in OF ENGINEER INCHARGE
18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in
355.00 18.0 in 18.0 in
L=54.9' 18.0 in 18.0 in
L=49.0' L=34.0' L=26.7' L=50.9' L=51.2' 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in
L=50.5' L=48.5' L=41.4' L=37.9' L=54.8'
LEGEND:
L=53.3' L=49.3' L=36.5' L=52.3' L=53.3' L=50.9' L=54.1' L=55.2' L=37.8' L=30.5' L=50.7' L=48.1' L=52.1' INVERT LEVEL IL
FINISHED LEVEL FL
350.00 LENGTH L=200'
Station -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 FORCE-MAIN DIA Ø=18 in
(ft) FORCE-MAIN

AIR RELEASE VALVE A.R.V


PROFILE-A
CLIENT:

MATCH LINE PART-B


MATCH LINE PART-A

MATCH LINE PART-C


MATCH LINE PART-B

ROAD CROSSING (SHC&MED) SPECIALIZED


LENGTH = 71.4' HEALTH CARE & MEDICAL
EDUCATION DEPARTMENT,
FL=358.61' FL=358.61'
FL=358.13' FL=358.08'
GOVT. OF PUNJAB
FL=358.03' FL=357.98' FL=358.00' FL=359.69' IL=353.61' IL=353.61' J-52 FL=359.57' FL=359.57' FL=359.57' FL=359.57' FL=359.49'
IL=353.13' IL=353.08' J-48 FL=358.61' J-50 FL=358.72'
IL=353.03' IL=352.98' J-44 IL=353.00' IL=354.69' FL=358.72' FL=358.72' IL=354.57' IL=354.57' IL=354.57' IL=354.57' IL=354.49'
FL=358.18' FL=358.15' J-37 FL=358.10' FL=358.05' IL=353.72'
J-39 J-41 FL=358.00' J-43 FL=357.98' J-45 J-10 IL=353.61' IL=353.72' IL=353.72' J-53 J-54 J-55 J-56 J-57
IL=353.18' IL=353.15' IL=353.10' IL=353.05' J-11
J-8
IL=353.00' IL=352.98' J-49 J-51 KEY PLAN
J-36 J-38 J-40 J-42
FL=359.17'
FL=358.00' IL=351.00' A.R.V HT/METERING ROOM
TRANSFORMER PADS

24' Wide Road


FIRE BRIGADE
TUBE
WELL

IL=351.00' J-47 GENERATOR

PAD

TRAUMA/EMERGENCY
PUBLIC
PARKING

(NO-24)
24' Wide Road

TRAUMA

18.0 in 18.0 in 18.0 in 18.0 in 18.0 in


MAIN
ENTRANCE

J-9 18.0 in
18.0 in

(NO-80)
PARKING
POLICE

EMERGENCY
ENTRANCE

PARKING
NO-7
MAIN

PARKING

OPD
PUBLIC
PARKING
CYCLE

(NO-400)
MOTOR

PARKING
PUBLIC
(NO-80)
TRAUMA/EMERGENCY

PARKING

PARKING
18.0 in 18.0 in

PUBLIC

AMBULANCE
18.0 in 18.0 in 18.0 in
18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in in L=53.7' L=54.5' L=52.3' L=50.5' L=54.0'
HOSPITAL BUILDING
500 BEDS

18.0 in 18.0 in
(PHASE - I)

18.0 in L=50.2
MEDICAL UNIVERSITY /
NURSING COLLEGE
(PHASE - III)

.0 L=54.2'

(NO-80)
PARKING
PUBLIC
OPD
(NO-80)
TRAUMA/EMERGENCY

PARKING
18

PUBLIC
18 '
MOTOR
PUBLIC
CYCLE
PARKING
PARKING
(NO-170)

L=51.4' L=53.4'

(NO-34)
TRAUMA/EMERGENCY
.0 L=40.8'

PARKING
PUBLIC

ENTRANCE
L=50.6' L=44.6'

OPD
PARKING(NO-76)

.0'
ADMINISTRATION
STAFF
ENTRANCE
/

L=48.1' L=52.1' L=54.0' L=53.3' L=53.7' L=55.5' L=54.4' L=54.8' L=54.1' L=42.4' in PARKING

PARKING

NO-4
DOCTORS
PARKING
& STAFF

MAIN
70

GATE
L=
24' Wide Road

38 18.0 in L=
PUMP

STATION

CAFETERIA

PARKING (NO-18)
24' Wide Road

.1'
C

FUTURE
EXPANSION

L=71.4'

PARKING (NO-27)
HOSTELS PARKING

(NO-30)

A B

24' Wide Road

24' Wide Road

10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 D D

PROJECT:
PROFILE-A
ESTABLISHMENT OF TERTIARY

MATCH LINE PART-D


MATCH LINE PART-B
MATCH LINE PART-C

MATCH LINE PART-C


CARE HOSPITAL,
NISHTER - II, MULTAN
J-82 PROJECT STATUS:
FL=359.90' FL=361.29' FL=361.29' FL=361.29' FL=361.29' J-80 FL=361.16' FL=361.16'
FL=359.49' J-64 FL=360.98' FL=360.98' FL=360.98' FL=360.98' FL=361.16'
IL=354.90' IL=356.29' IL=356.29' IL=356.29' IL=356.29' FL=360.59' FL=360.59' FL=360.59' FL=360.59' FL=360.59'
FL=359.90' FL=359.90' IL=356.16' IL=356.16' IL=356.16'
FL=359.57' FL=359.49' IL=354.49' FL=359.49' FL=359.49' J-63 FL=359.90' FL=359.90' IL=355.98'
J-65
IL=355.98'
J-66
IL=355.98'
J-67
IL=355.98'
J-68 J-69 J-70 J-71 J-13 IL=355.59' IL=355.59' IL=355.59' IL=355.59' IL=355.59' J-81 J-14 CONSTRUCTION DRAWINGS
IL=354.57' IL=354.49' J-58 IL=354.49' IL=354.90' IL=354.90' IL=354.90' IL=354.90' J-72 J-73 J-77 J-79
IL=354.49'
J-57 J-61 J-62 J-12 J-83
J-56 J-59 J-60
FL=361.16'
DRAWING TITLE:
A.R.V IL=356.16'

18.0 in 18.0 in 18.0 in


STORM WATER FORCE-MAIN
18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in
18.0 in 18.0 in 18.0 in 18.0 in
18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in PROFILE
18.0 in 18.0 in 18.0 in L=50.3' L=54.5' L=47.2' L=48.6' L=56.0' L=54.4' L=31.9' L=29.8' L=45.3'
18.0 in 18.0 in ' L=51.3' L=50.6' L=53.2'
L=53.2' L=54.5' L=50.2' L=50.5' L=54.7'
L=48.3' L=39.8' L=29.4' L=54.6' L=52.8 REV. DATE DESCRIPTION
L=50.5' L=54.0' L=54.1' L=52.0' L=54.2'

22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50

PROFILE-A
MATCH LINE PART-D
MATCH LINE PART-C

FL=362.58' DATE: SCALE:


J-82 FL=360.36' FL=360.15' FL=360.24'
FL=361.16' FL=361.16' FL=361.16' FL=361.39' FL=361.39' FL=361.39' FL=361.39' IL=355.36' IL=357.58' MAY-2023 NTS
IL=355.15' IL=355.24'
IL=356.16' IL=356.16' IL=356.16' IL=356.39' IL=356.39' IL=356.39' IL=356.39' FL=360.36' FL=360.36' J-91 FL=360.36' FL=360.07' FL=360.07' FL=360.07' FL=360.15' FL=360.15' FL=360.15' J-102 J-104 J-20
FL=360.07' FL=360.07' FL=359.94' FL=359.94' FL=359.94' FL=359.94' FL=360.15' DRAWN BY: DESIGN BY:
J-14 J-84 J-85 J-86 J-87 J-88 IL=355.36' IL=355.36' IL=355.36' IL=355.07' IL=355.07' IL=355.07' IL=355.07' IL=355.07' IL=354.94' IL=354.94' IL=354.94' IL=354.94' IL=355.15' IL=355.15' IL=355.15' IL=355.15' NAZAR UL HASSAN ZAHEER ABBAS
J-89 J-90 J-15 J-92 J-93 J-94 J-95 J-96 J-97 J-98 J-16 J-99 J-100 J-101 J-17 J-103
J-83 CHECKED BY: APPROVED BY:
FL=361.16'
AZAM MINHAS DR.FAWAD MUZAFFAR
IL=356.16' A.R.V

in DRAWING NO. REVISION:


18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in .0
18
18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in 18.0 in .8' NR II-ED-05-PH- 04f 00
L=31.9' L=29.8' L=45.3' L=53.6' L=50.1' L=56.0' L=50.9' L=54.0 18.0 in 18.0 in 18.0 in 34
' L=
L=53.6' L=33.7' L=35.2' L=48.0' L=50.7' L=50.4' L=49.3' L=41.7' L=55.0' L=51.1' L=45.2' L=45.5' L=37.8' L=35.3' L=39.6' L=35.3'
L=41.7' L=41.2' L=51.5'
FL=360.24'
IL=355.24'
J-105

35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00

PROFILE-A

You might also like