A. AUTHORITY:
A1. This Airworthiness Notice has been issued under the authority vested in DG CAA in pursuance of
Rules 4, 5, 25 thru 30, 333(3), 333(5) and 360 together with all other enabling provisions of Civil
Aviation Rules, 1994 (CARs, 1994).

B. PURPOSE:
B1. The purpose of this Airworthiness Notice is to prescribe supplementary requirements related to
approval of a maintenance organisation in accordance with Subpart F of ANO-M-AWRG (Latest
Revision) (hereinafter referred as ANO-M).

C. SCOPE:
C1. This Airworthiness Notice shall be applicable to organisations holding or applying for issuance or
change of maintenance organisation approval as per ANO-M Subpart F.

D. DESCRIPTION:

D1. DEFINITIONS:

Any term used in this AWNOT shall have the same meaning as given in the CARs, 1994, ANO-M,
AWNOT-095-AWRG (latest revision), AWNOT-017-AWRG (latest revision) and relevant ICAO
Annexes.

D2. INTRODUCTION:

D2.1 ANO-M establishes the measures to be taken to ensure that continuing airworthiness of an
aircraft is maintained, including maintenance and it specifies the conditions to be met by the
persons or organisations involved in such continuing airworthiness management.

D2.2 ANO-M continuing airworthiness requirements include requirement for maintenance of an


aircraft, which is not classified as Large Aircraft and is not involved in ‘CAT Operation’ (i.e.
RPT, TPRI or Charter Operations), and components for installation thereon by an ANO-M
Subpart F Approved Maintenance Organisation (AMO), appropriately approved for the
aircraft and components for installation thereon.

D2.3 This AWNOT prescribes supplementary requirements / conditions / information related to


ANO-M Subpart F maintenance organisation approval, in addition to the already specified
Acceptable Means of Compliance (AMC) for the provisions of ANO-M Subpart F, to clarify
the specified requirements and to establish a system, which will ensure their effective
compliance.

D2.4 This AWNOT is addressing following topics related to ANO-M Subpart F maintenance
organisation approval and the requirements / conditions / information specified under their
particular headings shall be complied in conjunction with ANO-M Subpart F requirements:

D2.4.1 Issuance of ANO-M Subpart F approval.

D2.4.2 Continuation of ANO-M Subpart F approval.

D2.4.3 Changes to an ANO-M Subpart F AMO.

D2.4.4 Approval of Maintenance Organisation Manual (MOM) and its amendments.

D2.4.5 Requirements related to ANO-M Subpart F Nominated Personnel.

D2.4.6 Qualification Requirements for Personnel involved in Maintenance including


Specialised Tasks.

20/12/2020 Page 1 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D2.4.7 Competence Assessment of Personnel involved in Maintenance.

D2.4.8 Supersedure of Previous Requirements for Approval of Maintenance Organisation


and Implementation of ANO-M Subpart F Requirements.

D3. ISSUANCE OF ANO-M SUBPART F APPROVAL:

D3.1 APPLICATION:

An organisation shall apply for issuance of ANO-M Subpart F maintenance organisation


approval as per ANO-M Paras ANO.M.A.602 and AMC.M.A.602. The application package
shall be submitted to the Airworthiness Field Office having jurisdiction over the
organisation’s principal place of business (hereinafter referred as the Principal Airworthiness
Field Office for the organisation) and shall contain the following:

D3.1.1 Covering letter on official letterhead of the organisation, signed by the appointed
Accountable Manager or its appropriate representative, which shall include
following:

Note: The covering letter shall be copied, without enclosures, to Airworthiness


Directorate, HQCAA, JIAP Karachi and the Airworthiness Field Office(s) having
jurisdiction over the organisation’s any other address(es) than its principal place of
business for which the approval is being requested, as applicable, (hereinafter
referred as the concerned Airworthiness Field Office(s) other than the Principal
Airworthiness Field Office for the organisation).

D3.1.1.1 Brief information about the organisation’s anticipated maintenance


contract(s) for the aircraft type(s) included in its requested scope of
approval i.e. Customer (Operator / Owner) Name, Number of the aircraft
to be maintained, Level / Scope of Maintenance etc.

D3.1.1.2 Name & Designation of the Nominated Personnel, for which PCAA Form
4s are being submitted as per Para D3.1.4 below.

D3.1.2 PCAA Form 2 (Latest revision of CAAF-602-AWRG), duly filled and signed by the
organisation’s appointed Accountable Manager.

D3.1.3 Draft “Maintenance Organisation Manual (MOM)” prepared in accordance with


ANO-M Paras ANO.M.A.604(a) and AMC.M.A.604 and ANO-M ‘AMC Appendices –
Appendix IV to AMC.M.A.604’.

D3.1.4 PCAA Form 4 (Latest revision of CAAF-604-AWRG), duly filled for each Nominated
Person, required as per ANO-M Paras ANO.M.A.606(b) and AMC.M.A.606(b) and
as specified in Part B of the submitted draft MOM, in compliance with requirements
of Para D7 below.

D3.1.5 Evidence of deposit of the applicable fees in accordance with the latest revision of
AWNOT-003 or Authorisation to deduct such fees from the organisation’s Advance
Deposit Account, if maintained.

D3.2 ASSESSMENT:

The applicant shall facilitate and grant access to PCAA in its assessment of the organisation
for grant of maintenance organisation approval in accordance with ANO-M Subpart F, which
shall include but not limited to following activities:

D3.2.1 Evaluation of the application package for its contents and correctness of the
provided information.

20/12/2020 Page 2 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D3.2.2 Scrutiny of the submitted MOM to establish compliance of ANO-M Subpart F


requirements in this regard and its approval.

D3.2.3 Review of the submitted PCAA Form 4s in accordance with ANO-M Subpart F and
this AWNOT requirements and their acceptance.

D3.2.4 Audit of the organisation to verify the organisation's compliance with ANO-M
Subpart F and this AWNOT requirements and satisfactory correction of any pointed
out findings.

D3.2.5 A meeting with the appointed Accountable Manager during assessment for the
approval to ensure that he/she fully understands the significance of the approval
and the reason for signing the commitment of the organisation in MOM to comply
with the procedures specified therein.

D3.3 APPROVAL ISSUANCE AND CONDITIONS:

Subject to compliance of all applicable requirements of ANO-M Subpart F and this AWNOT
and satisfactory recommendation of the Principal Airworthiness Field Office for the
organisation, which will take recommendations from the concerned Airworthiness Field
Office(s) as applicable, the applicant shall be issued maintenance organisation approval in
accordance with ANO-M Subpart F by Airworthiness Directorate, HQCAA with the
conditions specified therein including:

D3.3.1 The extent and validity of the approval shall be as indicated on the issued PCAA
Form 3-MF having the organisation’s Approval Reference.

D3.3.2 The scope of work deemed to constitute the approval shall be as specified in the
organisation’s approved MOM.

D3.3.3 The continued validity of the approval shall be subject to continued compliance of
ANO-M Subpart F and this AWNOT by the organisation including facilitating and
granting access to PCAA in determination of such continued compliance.

D4. CONTINUATION OF ANO-M SUBPART F APPROVAL:

D4.1 An ANO-M Subpart F AMO approval is valid for unlimited duration as per ANO-M Para
ANO.M.A.618(a) subject to the conditions specified therein and Para D3.3 above. However,
an approved ANO-M Subpart F AMO is required to be completely audited at a period not
exceeding 24 months.

D4.2 An ANO-M Subpart F AMO shall facilitate and grant access to PCAA in its assessment of
the organisation for continuation of maintenance organisation approval in accordance with
ANO-M Subpart F, which shall include but not limited to following activities:

D4.2.1 Audit(s) of the organisation covering all aspects of its approval in a period not
exceeding 24 months from the date of the issuance / last continuation of the
approval to verify the organisation's compliance with ANO-M Subpart F and this
AWNOT requirements and satisfactory correction of any pointed out findings.

D4.2.2 A meeting with the accepted Accountable Manager at least once every 24 months
continuation period to ensure that he/she remains informed of significant issues
arising during audits.

D4.2.3 Deposit of the applicable fees in accordance with the latest revision of AWNOT-003
by the organisation or Authorisation to deduct such fees from the organisation’s
Advance Deposit Account, if maintained. Intimation in this regard shall be submitted
by the organisation at least 02 months prior to the completion of every 24 months
continuation period to its Principal Airworthiness Field Office.

20/12/2020 Page 3 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D4.3 Subject to compliance of all applicable requirements of ANO-M Subpart F and this AWNOT
and satisfactory recommendation of the Principal Airworthiness Field Office for the
organisation, which will take recommendations from the concerned Airworthiness Field
Office(s) as applicable, the maintenance organisation approval of the organisation shall
continue to remain valid in accordance with ANO-M Subpart F subject to the conditions
specified therein including conditions of the Para D3.3 above.

D5. CHANGES TO AN ANO-M SUBPART F AMO:

D5.1 NOTIFICATION OF CHANGES OTHER THAN THE REQUEST FOR ENHANCEMENT OR


REDUCTION IN ‘SCOPE OF APPROVAL’ AND THEIR EFFECT ON THE APPROVAL:

D5.1.1 As per ANO-M Para ANO.M.A.617, an ANO-M Subpart F AMO shall notify any
proposal for change in the organisation to its Principal Airworthiness Field Office,
which shall include following changes not related to enhancement or reduction in its
scope of approval:

D5.1.1.1 Change in Name, Approved Locations or Facilities on the Approved


Locations of the organisation.

D5.1.1.2 Change in Management Personnel including accepted Accountable


Manager and Nominated Personnel.

D5.1.1.3 Change in the approved procedures of the organisation including


procedures in the organisation’s approved MOM, which shall require
approval of the MOM’s amendment as per Para D6.2 below.

D5.1.1.4 Change in equipment, tools, material and certifying staff that could affect
the approval.

D5.1.2 These changes shall be notified adequate time before they take place in the
organisation except any unplanned change in personnel due to any unavoidable
circumstances, which shall be notified at the earliest opportunity.

D5.1.3 The ANO-M Subpart F AMO shall comply with any conditions prescribed by PCAA
under which the organisation may operate during these notified changes unless its
approval has been suspended by PCAA due to the nature or the extent of the
changes.

D5.1.4 Notwithstanding Para D5.1.3 above, following conditions shall apply in all the
relevant cases for any notified or un-notified changes in an ANO-M Subpart F AMO,
for which PCAA has not prescribed any particular condition to the organisation or
suspended its approval:

D5.1.4.1 In case of proposal for change in Name, Approved Locations or its


Facilities, the organisation shall apply for amendments in relevant
approved documents and facilitate PCAA in assessing the effects of the
changes on the granted approval.

D5.1.4.2 In case of proposal for planned changes in Management Personnel, the


organisation shall appoint the new person for the post before it becomes
vacant along with completion of the applicable PCAA requirements in that
regard such as submission of MOM revision containing Accountable
Manager’s Statement with new signatures in case of new Accountable
Manager and submission of PCAA Form 4 in case of change in
Nominated Personnel etc.

D5.1.4.3 In case of unplanned changes in Management Personnel, the


organisation shall appoint the new person for the vacant post and initiate
compliance of the applicable PCAA requirements in that regard at the

20/12/2020 Page 4 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

earliest but not exceeding 30 days from the day of vacancy of the post
unless otherwise is accepted by PCAA in writing.

D5.1.4.4 In case of changes in approved procedures, the organisation shall ensure


that any changes in the procedures shall not contradict with any PCAA
requirements or conditions in that regard and shall apply for approval of
amendment in the approved MOM as per Para D6.2 below as applicable.

D5.1.5 In case of non-compliance of any condition prescribed by PCAA as per D5.1.3


above or conditions as specified in D5.1.4 above for any notified or un-notified
change in an ANO-M Subpart F AMO, the approval of the organisation or part of the
approval, if the change is only affecting that part, shall be considered as suspended
with effect from expiry of the stipulated period for compliance of the condition until
its compliance unless otherwise is specified by PCAA.

D5.2 REQUEST FOR ENHANCEMENT OR REDUCTION IN ‘SCOPE OF APPROVAL’ OF AN


ANO-M SUBPART F AMO:

D5.2.1 Application:

An ANO-M Subpart F AMO shall apply for change of its approval to enhance or
reduce its granted privilege and scope of work as per ANO-M Paras ANO.M.A.602
and AMC.M.A.602. The application package shall be submitted to the Principal
Airworthiness Field Office for the organisation, which shall contain the documents
required in application package for issuance of the approval as per Para D3.1
above, as applicable.

D5.2.2 Assessment:

For enhancement in ‘Scope of Approval’, the organisation shall comply with the
applicable requirements for issuance of maintenance organisation approval as per
ANO-M Subpart F and this AWNOT in regards to the requested additional privilege.
The organisation shall facilitate and grant access to PCAA in its assessment of the
organisation for change of maintenance organisation approval in accordance with
ANO-M Subpart F, which shall include but not limited to the activities as specified in
Para D3.2 above.

D5.2.3 Change of Approval and Conditions:

Subject to compliance of all applicable requirements of ANO-M Subpart F and this


AWNOT and satisfactory recommendation of the Principal Airworthiness Field
Office for the organisation, which will take recommendations from the concerned
Airworthiness Field Office(s) as applicable, the change of the maintenance
organisation approval in accordance with ANO-M Subpart F shall be issued by
Airworthiness Directorate, HQCAA with the conditions specified therein including
conditions of the Para D3.3 above.

D6. APPROVAL OF MAINTENANCE ORGANISATION MANUAL (MOM) AND ITS


AMENDMENTS:

D6.1 A draft MOM shall be submitted by an organisation with its application for ANO-M Subpart F
maintenance organisation approval as per Para D3.1 above and it will be scrutinised as per
ANO-M Subpart F requirements during the maintenance organisation approval issuance
process. After correction of any pointed out deficiencies / discrepancies during the approval
process and as per PCAA instructions, the organisation shall submit fair copies of the MOM,
one (01) each for Airworthiness Directorate, HQCAA, Principal and concerned (if any)
Airworthiness Field Office(s) and the organisation itself, to its Principal Airworthiness Field
Office, which will forward them to Airworthiness Directorate, HQCAA for approval.

20/12/2020 Page 5 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D6.2 Any proposed amendment in the approved MOM, which can include its complete revision,
shall be submitted by the organisation to its Principal Airworthiness Field Office for scrutiny
as per ANO-M Subpart F requirements, which can involve consultation with any concerned
Airworthiness Field Office(s) as required. After correction of any pointed out deficiencies /
discrepancies during the scrutiny process and as per PCAA instructions, the organisation
shall submit fair copies of the amendment for each approved copy of the MOM to its
Principal Airworthiness Field Office for approval.

D6.3 Notwithstanding Para D6.2 above, eligible minor amendments as specified in any particular
organisation’s indirect approval procedure, approved by PCAA as part of its MOM, may be
indirectly approved in accordance with ANO-M Para ANO.M.A.604(c). Nevertheless, the
indirect approval of the eligible minor amendment shall be subject to compliance of the
approved indirect approval procedure and the organisation shall submit copies of the
amendment for each approved copy of the MOM to its Principal Airworthiness Field Office,
Airworthiness Directorate, HQCAA and the concerned Airworthiness Field Office(s), if any,
for incorporation in their approved copies.

D6.4 Evidence of deposit of the applicable fees in accordance with the latest revision of AWNOT-
003 or Authorisation to deduct such fees from the organisation’s Advance Deposit Account,
if maintained, shall be required for processing of the MOM and its amendments approval.

D7. REQUIREMENTS RELATED TO ANO-M SUBPART F NOMINATED PERSONNEL:

D7.1 REQUIRED NOMINATED PERSONNEL:

Person or Group of Persons i.e. “Maintenance Manager(s)” responsible for ensuring


compliance with ANO-M Subpart F requirements shall be nominated by an organisation as
per ANO-M Paras ANO.M.A.606(b) and AMC.M.A.606(b) to hold or apply for ANO-M
Subpart F maintenance organisation approval. These person(s) shall represent the
maintenance management structure of the organisation and be responsible for all functions
specified in ANO-M Subpart F including ‘Organisational Reviews’.

Note: In the context of ANO-M Subpart F and this AWNOT, the Accountable Manager is not
considered as Nominated Personnel and does not require acceptance on PCAA Form 4.
Approval of the organisation’s MOM containing the Accountable Manager’s signed
commitment statement shall constitute his/her formal acceptance, when PCAA is satisfied
that he/she fully understands the significance of the approval and the reason for signing the
commitment of the organisation in MOM to comply with the procedures specified therein.

D7.2 KNOWLEDGE, BACKGROUND AND EXPERIENCE REQUIREMENTS FOR NOMINATED


PERSONNEL:

All Nominated Personnel of an organisation holding or applying for ANO-M Subpart F


maintenance organisation approval shall be required to provide evidence and/or
demonstrate compliance of relevant knowledge, background and experience requirements
as per ANO-M Paras ANO.M.A.606(c) and AMC.M.A.606(c), which shall include:

D7.2.1 Practical experience and expertise in the application of aviation safety standards
and safe maintenance practices.

D7.2.2 Knowledge of following, which shall be assessed by PCAA in an interview of the


nominated person as per Para D7.3.4 below:

D7.2.2.1 Relevant PCAA Regulations including ANO-M;

D7.2.2.2 The organisation’s MOM;

D7.2.2.3 Maintenance standards.

20/12/2020 Page 6 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D7.2.3 Five (05) years’ aviation experience, out of which at least three (03) years shall be
practical maintenance experience.

D7.2.4 Knowledge of the relevant type(s) of aircraft and components included in the
organisation’s scope of approval, which shall be demonstrated through any of the
following:

D7.2.4.1 ANO-066 Aircraft Maintenance Engineer License (AML) endorsed with


the relevant type rating(s) in category ‘B1’ & ‘B2’ for aircraft maintenance
or the relevant AWNOT-025 Shop Approvals for component maintenance
or;

D7.2.4.2 Training Courses for relevant aircraft at a level equivalent to at least


ANO-066 Appendix III Level 1 General Familiarisation, conducted by an
ANO-147 organisation, the aircraft manufacturer or any other organisation
acceptable to PCAA or;

D7.2.4.3 Through assessment of this knowledge in the interview as required by


Para D7.3.4 below.

D7.2.5 Satisfactory performance in the past, up to the satisfaction of PCAA, in fulfilling


his/her duties and responsibilities as a Nominated Personnel or an appropriate
position holder in a PCAA approved organisation as applicable.

D7.3 ACCEPTANCE OF THE NOMINATED PERSONNEL:

D7.3.1 For acceptance of the required Nominated Personnel, PCAA Form 4 (Latest
revision of CAAF-604-AWRG) along with the necessary evidences to demonstrate
compliance of the applicable requirements of Para D7.2 above shall be submitted to
the Principal Airworthiness Field Office for the organisation as follows:

D7.3.1.1 With the application for ANO-M Subpart F approval as per Para D3.1
above in case of the initial nominations.

D7.3.1.2 With a covering letter on official letterhead of the organisation, signed by


the accepted Accountable Manager or its appropriate representative, and
the draft MOM amendment in case of a revised nomination for any
change in the accepted Nominated Personnel.

D7.3.2 The submitted application for acceptance of the Nominated Personnel will be
reviewed for availability of all the required information and necessary evidences in
accordance with the requirements of ANO-M Subpart F and this AWNOT and the
organisation shall be required to rectify any pointed out deficiencies / discrepancies
and submit any further evidence as required to satisfy PCAA in regards to the
compliance of the applicable requirements.

D7.3.3 In case of non-submission of the required information or evidence or satisfactory


reply as requested during the review, the application will not be further processed
and the Nominated Personnel will be declared as ‘Not Accepted’ by the Principal
Airworthiness Field Office for the organisation.

D7.3.4 After satisfactory review of the application, the Nominated Personnel shall be
required to appear in an interview in the Principal Airworthiness Field Office for the
organisation for their assessment in regards to knowledge, background and
experience requirements as per Para D7.2 above.

D7.3.5 If compliance of the applicable requirements of ANO-M Subpart F and this AWNOT
is established and recommended by the Principal Airworthiness Field Office for the
organisation, formal acceptance of the Nominated Personnel will be notified to the
organisation by Airworthiness Directorate, HQCAA along with the submitted PCAA

20/12/2020 Page 7 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

Form 4, duly signed by Director Airworthiness, PCAA. Otherwise, the Nominated


Personnel will be declared as ‘Not Accepted’ and the organisation shall nominate
any other suitable candidate in place of the not accepted nominated person.

D7.3.6 Notwithstanding Para D7.3.5 and the requirements of Para D7.2 above, Director
Airworthiness, PCAA may accept any Nominated Personnel with certain conditions
of acceptance in terms of limited or provisional validity, performance monitoring,
undergo further training and/or gain further experience etc., based upon his/her
current status of compliance of the applicable requirements and his/her ability to
reach status of their satisfactory compliance. In addition, the nominated personnel
approved under previous PCAA regulations for maintenance organisation approval
may be initially accepted without ensuring compliance of all the applicable
requirements subject to the condition that they shall comply with the applicable
requirements in the time period specified in conditions of their initial acceptance.

D7.3.7 Evidence of deposit of the applicable fees in accordance with the latest revision of
AWNOT-003 or Authorisation to deduct such fees from the organisation’s Advance
Deposit Account, if maintained, shall be required for processing of the applications
for acceptance of the nominated personnel.

D7.4 CONDITIONS FOR ACCEPTANCE OF THE NOMINATED PERSONNEL:

D7.4.1 Initial acceptance of all nominated personnel shall be subject to six (06) months
probationary period, during which, performance of the nominated personnel will be
closely monitored by PCAA.

D7.4.2 Acceptance of all nominated personnel shall be subject to the condition that they
shall satisfactorily fulfil their responsibility to ensure continued compliance with
ANO-M and this AWNOT by their organisation.

D7.4.3 In case of unsatisfactory performance during the probationary period or failure to


fulfil their responsibility, their acceptance may be withdrawn by PCAA.

D8. QUALIFICATION REQUIREMENTS FOR PERSONNEL INVOLVED IN MAINTENANCE


INCLUDING SPECIALISED TASKS:

D8.1 In accordance with the requirements of ANO-M Paras ANO.M.A.606 and ANO.M.A.607, an
organisation holding or applying for ANO-M Subpart F approval shall have qualified
personnel as required by its scope of approval for performance and certification of aircraft
and/or component maintenance including any specialised tasks, if performed as per the
approved procedures in its MOM.

D8.2 The organisation shall ensure that its personnel involved in maintenance are qualified as per
the following requirements and are assessed for their competence as per requirements of
Para D9 below:

D8.2.1 For issuance of Aircraft Certificate of Release to Service (CRS) as per ANO-M Para
ANO.M.A.612, the certifying staff shall be qualified as per the latest revision of
ANO-066-AWRG.

D8.2.2 For issuance of Component CRS i.e. PCAA Form 1 as per ANO-M Para
ANO.M.A.613, the certifying staff shall be qualified as per the latest revision of
AWNOT-025-AWEG.

D8.2.3 For carrying out and certifying Non-Destructive Testing (NDT) specialised tasks
during aircraft or component maintenance, the NDT personnel shall be qualified as
per the latest revision of AWNOT-025-AWEG.

D8.2.4 For carrying out and certifying any other specialised tasks such as non-destructive
inspections, welding and structural repairs etc. during aircraft or component

20/12/2020 Page 8 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

maintenance, the personnel shall be qualified as per the approved procedures


specified in the MOM, which shall include their qualification, training and
competence assessment requirements.

D8.3 The organisation shall provide initial and recurrent trainings to its personnel involved in
maintenance to:

D8.3.1 Assist them in complying with the requirements for issuance of the required
qualification;

D8.3.2 Develop non-certifying personnel into certifying staff and;

D8.3.3 Ensure their continued competence.

D9. COMPETENCE ASSESSMENT OF PERSONNEL INVOLVED IN MAINTENANCE:

D9.1 As required by ANO-M Paras ANO.M.A.606(e) and ANO.M.A.607(a), an organisation


holding or applying for ANO-M Subpart F approval shall demonstrate and record the
qualification of all personnel involved in maintenance including certifying staff by assessing
their competence, qualification and capability, which shall be accomplished as follows:

D9.1.1 For non-certifying personnel assisting certifying staff or working under his/her
supervision, the supervising certifying staff shall ensure that the non-certifying
personnel are adequately trained and competent to carry out the work being
performed under his/her supervision and he/she shall be responsible for the
performed work. The organisation shall keep qualification, experience and training
records for non-certifying personnel.

D9.1.2 For certifying staff issuing CRS following aircraft maintenance or issuing PCAA
Form 1 following component maintenance, the organisation shall ensure through a
procedure in its MOM that a certifying staff shall not exercise his/her privileges
unless he/she can demonstrate compliance of ANO-066 Para 66.A.20(b) and has
an adequate understanding of the relevant aircraft and/or aircraft component(s) to
be maintained together with the associated organisation procedures.

D9.2 The MOM procedure for assessment of competence, qualification and capability of a
prospective certifying staff for certification privileges on a particular aircraft and/or aircraft
component to be maintained by the organisation shall include:

D9.2.1 Ensuring that he/she has the required qualification such as ANO-066 AML endorsed
with the relevant type rating in the required category for aircraft maintenance and/or
appropriate AWNOT-025 Shop Approval for component maintenance.

D9.2.2 Ensuring that he/she can demonstrate and/or provide evidence for compliance of
ANO-066 Para 66.A.20(b) requirements, which include:

D9.2.2.1 Six months relevant certification or maintenance experience on the


aircraft or similar aircraft in the preceding 2 years period;

D9.2.2.2 Adequate competency to certify maintenance on the particular aircraft or


component and;

D9.2.2.3 Ability to read, write and communicate to an understandable level in the


language(s) in which the technical documentation and procedures
necessary to support the issue of CRS are written.

D9.2.3 Ensuring that he/she has received training and/or has relevant maintenance
experience on the product type such that he/she understands how the product
functions, what are the more common defects with associated consequences.

20/12/2020 Page 9 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

D9.2.4 Ensuring that he/she adequately understands the associated organisation


procedures.

D9.2.5 Keeping records of all evidences, documents and information that support his/her
competence, qualification and capability related to the certification privilege
authorised to him/her.

D9.2.6 Adding his/her name in the organisation’s current list of certifying staff maintained
as per ANO-M Para ANO.M.A.607(c) only after ensuring compliance of the
procedure’s requirements.

D9.2.7 Intimating him/her about addition of his/her name in the current list of certifying staff
and only then he/she can exercise the authorised certification privileges.

D9.3 For compliance of Paras D9.2.2.2 and D9.2.3 above, the organisation may ensure
competence of the prospective certifying staff to certify maintenance on the particular
aircraft and/or component in any combination of following ways:

D9.3.1 Adequate previous experience in certification of the product type and providing
information on major differences of the particular aircraft or component to be
maintained, if required, and/or;

D9.3.2 Working under the supervision of an authorised certifying staff for sufficient time to
assess his/her competence, where sufficient time could be as little as a few weeks if
he/she is fully exposed to relevant work, and he/she need not be assessed against
the complete spectrum of intended duties and/or;

D9.3.3 Written confirmation from his/her previous employer about his/her authorised
certification privileges, if he/she was previously employed as certifying staff in an
AMO.

D10. SUPERSEDURE OF PREVIOUS REQUIREMENTS FOR APPROVAL OF


MAINTENANCE ORGANISATION AND IMPLEMENTATION OF ANO-M SUBPART F
REQUIREMENTS:

D10.1 As per ANO-M Para ANO.M.A.103(b), the maintenance organisations, currently approved
under the ANO-001-AWRG and are not required to obtain ANO-145 approval, shall continue
to comply with the ANO-001-AWRG until the implementation of Section A Subpart F of
ANO-M as per ANO-M Para ANO.M.A.103(a) i.e. as per the latest directives of Director
Airworthiness, PCAA.

D10.2 Therefore, through this AWNOT, these latest directives for implementation of ANO-M
Subpart F are being issued i.e. the maintenance organisations, currently approved under
the ANO-001-AWRG and are not required to obtain ANO-145 approval, shall acquire ANO-
st
M Subpart F or ANO-145 maintenance organisation approval until 31 December, 2021
and after which their ANO-001 approval will no longer remain valid. However, time period for
submission of application for ANO-M Subpart F approval by an ANO-001 AMO to acquire
the approval within the prescribed date shall be as per the instructions of the Airworthiness
Field Office having jurisdiction over the ANO-001 AMO’s principal place of business.

D10.3 Moreover, in accordance with ANO-M Para ANO.M.A.103(a), the implementation of ANO-M
requirements for any new maintenance organisation requiring ANO-M Subpart F approval
shall be from the effectivity date of ANO-M.

E. EVIDENCES (ACRONYMS / RECORDS / REFERENCES):

E1. ACRONYMS:

E1.1 AMC Acceptable Means of Compliance


E1.2 AML Aircraft Maintenance Engineer License

20/12/2020 Page 10 of 11 AWNOT-097-AWRG-1.2


SUPPLEMENTARY REQUIREMENTS RELATED TO ANO-M SUBPART F
MAINTENANCE ORGANISATION APPROVAL

E1.3 AMO Approved Maintenance Organisation


E1.4 ANO Air Navigation Order
E1.5 AWNOT Airworthiness Notice
E1.6 CAT Commercial Air Transport
E1.7 CARs Civil Aviation Rules
E1.8 CRS Certificate of Release to Service
E1.9 HQCAA Headquarters Civil Aviation Authority
E1.10 ICAO International Civil Aviation Organisation
E1.11 MOM Maintenance Organisation Manual
E1.12 PCAA Pakistan Civil Aviation Authority
E1.13 RPT Regular Public Transport

E2. RECORDS:

E2.1 Authorised Release Certificate (PCAA Form 1) (CAAF-601-AWRG)


E2.2 Application for Initial Grant / Continuation / Change of ANO-145, ANO-M Subpart F and
ANO-M Subpart G Approval (PCAA Form 2) (CAAF-602-AWRG)
E2.3 Application for Acceptance of Management Personnel (PCAA Form 4) (CAAF-604-
AWRG)
E2.4 Maintenance Organisation Approval Certificate (PCAA Form 3-MF) (CAAF-663-AWRG)

E3. REFERENCES:
E3.1 Civil Aviation Rules, 1994
E3.2 Continuing Airworthiness Requirements (ANO-M-AWRG)
E3.3 Approval of Maintenance Organizations (ANO-001-AWRG)
E3.4 Aircraft Maintenance Engineer License (ANO-066-AWRG)
E3.5 Approved Maintenance Organizations (ANO-145-AWRG)
E3.6 Charges for the Services of Airworthiness Directorate (AWNOT-003-AWXX)
E3.7 Definition and Interpretation of Terms (AWNOT-017-AWRG)
E3.8 Requirements for Issue/Extension/Renewal of Shop Approvals (AWNOT-025-AWEG)
E3.9 Supplementary Continuing Airworthiness Management Requirements related to ANO-M
(AWNOT-095-AWRG)

IMPLEMENTATION:
This Airworthiness Notice supersedes its previous versions and shall be effective from 20-12-2020
however it shall be implemented with ANO-M continuing airworthiness requirements as per Para
D10 above.

20/12/2020 Page 11 of 11 AWNOT-097-AWRG-1.2

You might also like