You are on page 1of 16

Interpolation

% of steel concrete shear strength


0.15 0.28 0.343553299
0.25 0.36 not in 0.25-0.5
0.5 0.48 not in 0.5-0.75
0.75 0.56 not in 0.75-1
1 0.62 not in 1-1.25
1.25 0.67

S.N. % of steel
1 0.23

Interpolation

% of steel concrete shear strength


0.15 0.28 #REF!
0.25 0.36 #REF!
0.5 0.48 #REF!
0.75 0.56 #REF!
1 0.62 #REF!
1.25 0.67

S.N. % of steel
1 #REF!

Interpolation

% of steel concrete shear strength


0.15 0.28 0.343553299
0.25 0.36 not in 0.25-0.5
0.5 0.48 not in 0.5-0.75
0.75 0.56 not in 0.75-1
1 0.62 not in 1-1.25
1.25 0.67

S.N. % of steel
1 0.23
0.34355329949
-----
-----
-----
-----

shear strength
0.344

#REF!
#REF!
#REF!
#REF!
#REF!

shear strength
#REF!

0.34355329949
-----
-----
-----
-----

shear strength
0.344
Design of isolated foundation
Pleft(X)(unfactored) 704.00 KN Area req 5.16
KN Width prov 2.30
Soil bearing 150 KN/m2 Total Length 2.24
Cent Col Size 0.35 m provided length 2.30
Cornor Col Size 0.35 m Left Projection
Dist betw. Col. Center to center m Right Projection

CG/from Left of
Max P 1056 m
Net upward soil pressure = 199.62 KN/m2 Check Value
m
BENDING MOMENT about x-x passing through the face of the colu 218.23 KN/m

d calculated from moments = 185.41 mm

Check for two way shear ok

D= 450 Ast mim.=


d= 394 mm

4.728 Ast2 171390 Ast 218230434.78

Ast at bottom 1321.47 mm2 1321.47 mm2

12 dia spacing = 196.67 provide spacing 125

Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 266.75 kN
Nominal shear stress(Tv)= 0.29 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok
Check for two way shear

concreate capacity = 1310944.05 N


From load = 945502.08 N
check ok

Development length
Ld= 679.69 mm
Ld available 1015 > 679.69
Ok
0

0.35

maxim projection
0.000

1087.44
mm2

=0

mm

for 12 dia.
Design of isolated foundation
Pleft(X)(unfactored) 450.00 KN Area req 3.96
KN Width prov 1.99
Soil bearing 125 KN/mm2 Total Length 1.99
Cent Col Size 0.3 m provided length 2
Cornor Col Size 0.3 m Left Projection
Dist betw. Col. Center to center m Right Projection

CG/from Left of
Max P 675 m
Net upward soil pressure = 168.75 KN/m2 Check Value
m
BENDING MOMENT about x-x passing through the face of the colu 121.92 KN/m

d calculated from moments = 148.62 mm

Check for two way shear ok

D= 450 Ast mim.=


d= 394 mm

5.438 Ast2 171390 Ast 121921875.00

Ast at bottom 728.19 mm2 945.60 mm2

12 dia spacing = 237.80 provide spacing 125

Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 153.90 kN
Nominal shear stress(Tv)= 0.20 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok
Check for two way shear

concreate capacity = 1222842.97 N


From load = 593723.93 N
check ok

Development length
Ld= 566.41 mm
Ld available 890 > 566.41
Ok
0

0.3

maxim projection
0.000

945.6
mm2

=0

mm

for 12 dia.
Design of isolated foundation
Pleft(X)(unfactored) 520.00 KN Area req 4.58
KN Width prov 2.14
Soil bearing 125 KN/mm2 Total Length 2.14
Cent Col Size 0.3 m provided length 2.2
Cornor Col Size 0.3 m Left Projection
Dist betw. Col. Center to center m Right Projection

CG/from Left of
Max P 780 m
Net upward soil pressure = 161.16 KN/m2 Check Value
m
BENDING MOMENT about x-x passing through the face of the colu 159.99 KN/m

d calculated from moments = 162.32 mm

Check for two way shear ok

D= 450 Ast mim.=


d= 394 mm

4.943 Ast2 171390 Ast 159988636.36

Ast at bottom 960.06 mm2 1040.16 mm2

12 dia spacing = 232.39 provide spacing 125

Grade of concrete M 20
Check for one way shear
at d distance (Vu)= 197.13 kN
Nominal shear stress(Tv)= 0.23 N/mm2
% of tension steel p = 12 dia 0.23
shear strength of M20 concrete for above % steel = 0.34 Ok
Check for two way shear

concreate capacity = 1222842.97 N


From load = 702380.98 N
check ok

Development length
Ld= 566.41 mm
Ld available 990 > 566.41
Ok
0

0.3

maxim projection
0.000
8.528

1040.16
mm2

=0

mm

for 12 dia.

You might also like