Compounded activities
baseline design, detailed 97–98
in detail, level of 52 61 91
Computerized Project Control (Drigani) 108
Computer software configuration items (CSCIs) 119
Concurrent delay 271
Conduct planning reviews 263
Constraints 129 164–170 271
Constructability 263 271
Construction, schedule 243
Construction manager (CM) 32 218 223 233
237
Construction Specification Institutes Master Format System 33
Contiguous activity 271
Contingency fees 271
Contract 201 271
Contract closeout 271
Contractor-created float 271
Contractors 218
in baseline development, detailed 94–100
inadvertent schedule perspective of 69–70
perspective on early completion schedule 68
Coordination activities 137–138
Cost accounting 18 112 271
Cost at completion 271
Cost breakdown 112–117 271
“Cost Engineering Terminology” 154–155
Cost-loaded schedule 32 237 272
earned schedule 200
EVM in 199–200
updating cost in 199–200
Cost loading 18 22 81 131
237 245
Cost performance index (CPI) 205 248 272
Cost performance report (CPR) 245
Cost ratio 272 276
Cost/schedule control system criteria (C/SCSC) 272
Cost/schedule status report (C/SSR) 245
Jenzen 125
Management
See also Earned value management
baseline 213–214
baseline recording and documentation for 214–215
change 255–256 271
float 253–254
materials 276
project plan for 178 226–227 279
project team for 103 162 279
resource reports for 246
schedule 244
task reports for 245
Mandatory finish 166 168 276
Mandatory start 276
Man-hour ratio 276
Manual leveling 180
Master schedule 22 63 110 162
230 246 276
Materials management 276
Matrix, RAM as 3
Measurement forecasting 249
Mediation 269 276
Meetings, update/schedule 201–202
Methodology 250–251
Metrics reports 248
®
Microsoft Project 175–176
Milestones 89 235 244
critical path 228
EVM weighted 204
finish 274
guidelines, practices, and advisories for 126–127 132–133
purpose and defaults in 126–127
start 46 126–128 132–133 274
276 282
weighted 204
Monte Carlo simulation 20–21 101 143 181
185 188 277
Most critical 174–175
Most likely duration 270 277
Multiple schedules
advisories for 64
best and recommended practices for 63–64
default condition for 63
definition and purpose of 62–63
Projects (Cont.)
resource leveling and 178–179
simple low-risk 8
stakeholders 239–241 253 263
“Project Time Management” 157
Project tracking 279
Prospective time impact analysis
definitions for 258–259
delay events in 259–260
guidelines, practices, and advisories for 258–259
Punch list 209 221 228 279
Punitive damages 274 279
PV. See planned value
Schedules (Cont.)
detail 57–58 60 63–64 124
281
development philosophy and theory of 86–87
documentation of assumptions on 61–62
early completion 65–66
early completion–inadvertent 69–70
early completion–intentional 66–67
level 124–126
maintenance overview 195–196
maintenance process of 195
management 244
meeting updates in 201–202
model 212–213
OD completion of 70–71
owners perspective on 66–67 69
perspective on early completion 68
philosophy and theory of 191–192
preservation’s numbering system for 215–216
process document for 219
progress narrative report for 244–245
prohibitions on manipulation of 235
projects initial submission for 31 89 236
qualitative assessment of risk 184–186
report 246
reporting and response 238
resource-loaded 198–199
resources-driven 173 280
review report for 243–244
status report 244
submittal details for baseline design, detailed 98–99
submittal details for initial baseline 92–93
updated 221 236 284
update significance 200–201
usage process and development of 226–227
Schedule sponsorship (SS) 206 282
Schedule structure 109–110 282