Schedule of Requirements
Contents
3. Drawings ..................................................................................................................... 7
1
1. List of Service and Delivery Schedule
Schedule of Requirements for Supply, Installation and Implementation of Integrated Financial and
Operational Management System
Final (Project Site) Destination as specified in BDS: CAAN offices, Nepal
Latest Delivery of Service Date: Seven year from the first Service Module live date
Bidder’s offered Delivery date [to be provided by the bidder]:
N
1. Financial Automation package (core applications)
a. Financial Management and Reporting Module
b. Procurement, Inventory & Fixed Assets Management
Module
c. Human Resource & Payroll Management Module
d. Engineering Service Module
e. Internal Audit Module
1.1 Solution which covers the mandatory requirements at Section V 1 Lot Service
(centralized management for all airports and offices)
1.2 Implementation, Commissioning, Testing, Migration, Change 1 Lot Service
Management, roll out all offices and live the system
2. Airport Operation Automation Package
a. Revenue Management (Billing) Module
b. Airport Operational Database Module
c. Resource Management System (RMS) Module
d. Integration System (IS) Module
e. Flight Operation Management Module
2.1 Solution which covers the mandatory requirements at Section V 1 Lot Service
(centralized management for all airports)
2.2 Implementation, Commissioning, Testing, Migration, Change 1 Lot Service
Management, roll out all airports and live the system
3 RDBMS Databases and Other Applications
3.1 Solution which covers the mandatory requirements at Section V 1 Lot Service
(centralized management for all airports)
2
3.2 Implementation, Commissioning, Testing, Migration, Change 1 Lot Service
Management, roll out all airports and live the system
4 Software upgradation, maintenance and support
4.1 Warranty of applications, maintenance and support, license of 1 Lot Service
applications. The grand total of 5 years (beyond the initial
implement period of 2 years from contract date) period as per
the scope.
5 Training and Development
5.1 Training and development as per the requirement in Section V 1 Lot Service
Grand Total
3
2. Technical Specifications
4
1. Contents
1. Introduction 7
2. Objectives 10
4. Scope of Service 12
5. Implementation Team 13
6. Methodology 13
7. Reporting Requirement 14
6
1. Introduction
Civil Aviation Authority of Nepal (CAAN), hereinafter referred to as CAAN is an organization
established on 31 December 1998 under Civil Aviation Act, 1996. The primary role of the
organization is to ensure Safe, Secured, Efficient, Standard, and Quality Service in Civil Aviation
and Airport Operations.
CAAN is the regulator of civil aviation as well as the service provider in the areas of Air Navigation
Services and Aerodrome Operations. CAAN is the statutory body responsible for managing airports
in Nepal as well as airspace regulation and regulation of air transport. The organization is currently
operating 1 International Airport, 2 under construction international airports, 4 domestic hub airports,
and 26 other regular operated airports in Nepal. An overall organizational structure of CAAN is given
in Exhibit 1.
7
EXHIBIT -1 (Organization Hierarchy)
8
It is carrying out its operation from multiple locations across Nepal with IT infrastructure managed from
its central office located at Babarmahal, Kathmandu, and Tribhuvan International Airport. On the
Aviation / aeronautical side it is using international level software and system and is in the process of
upgrading the system to the latest and state of the art system. Different departments are using different
systems that do not communicate with each other for their operations resulting in operational
inefficiency, data duplication, inefficient reporting, higher maintenance costs, scalability issues, etc.
During the past few years, CAAN management has done a considerable job towards centralizing and
digitalizing the Accounting and Financial Management of the organization through the Central Billing
System, Central Payroll, Central Accounting System, and Document Management System.
Owing to its offices in disperse geographic locations, its immense responsibility, organization size, and
huge financial transactions; now, there is a need to channelize the effort toward standardizing and moving
toward a robust and unified system that communicates with peripheral systems, reduces redundancy of
data entry, minimizes error, increases efficiency, provides analytics and aids in audit and informed
management decision making.
Further, due to the rapid rise in digitization and adoption of technology as well as the need to comply
with national and international standards like IFRS/NFRS, there is an acute need for a Unified and Robust
Financial Management System.
The effort of management has been overshadowed by the fragmented and unplanned system being used
in CAAN. Systems have been implemented in almost every sector related to financial management but:
• Systems are designed to solve immediate need rather than the organization vision
• They do not properly address user requirement
• They do not standardize operations
• They do not increase efficiency or free manpower
• They do not aid management in informed decision making
• They do not talk to each other. Same data entered in multiple systems.
CAAN invites proposals from interested suppliers for the design, supply, installation, testing and
commissioning as well as maintenance support of Integrated Financial and Operational management System
at multiple airports and office in Nepal with Centralized management model. CAAN will make capital
investment, i.e., pay for all software/implementation work
The purpose of this document is to provide the Service and technical requirements specific to Civil Aviation
Authority of Nepal to identify and select an industry standard high-quality solution which could provide
dynamic and optimal process and functionalities to maximize the benefits for all airports and offices, airlines
etc.
The CAAN data center at TIA (Kathmandu) shall serve as the main core room hosting the necessary systems
(servers, network switches, firewalls etc.) serving the Integrated facilities at all airports.
9
The summary of relevant facts and proposed data are in Annexes.
2. Objectives
Through this bidding process, CAAN is willing to identify an eligible bidder for the Supply, Delivery,
Installation, and Commissioning of ERP systems and Platforms at the organization.
The major objective of this assignment is to enhance the operational efficiency and effectiveness of
CAAN through the implementation of an enterprise-wide system. CAAN has envisioned to establish an
integrated computerized system to:
• Efficiently manage its daily operations and resources
• Ensure the Effectiveness in Control
• Ensure timely and accurate MIS reports
• Ensure employees’ efficiency through task automation and elimination of repetitive tasks
• Enhance Accountability at all levels
• Ensure Convenience to stakeholders and
• Ensure Seamless Integration of all the department-specific activities and information.
The objective of the Project is to replace the current standalone system and implement the Centralized
Integrated ERP System to handle back office operation and airport operations & airline requirements in
compliance with ICAO and IATA recommended Practice.
10
3. Acronyms used in Technical Requirements
A-CDM Airport Collaborative Decision-Making
ADS-B Automatic Dependent Surveillance-Broadcast
AFTN Aeronautical Fixed Telecommunications Network
AMHS Aeronautical Message Handling System
BHS Baggage Handling System
BRS Baggage reconciliation solution
BRS Baggage Reconciliation System
CAAN Civil Aviation Authority of Nepal
COTS Commercial-off-the-shelf ERP Application
CPMD Corporate Planning & Monitoring Department
CUPPS Terminal equipment for common use
DW Data Warehouse
FDPS Flight Data Processing System
IFRS International Financial Reporting Standards
LDAP Lightweight Directory Access Protocol
LDM Load Message
MVT Aircraft Movement Message
NFRS Nepal Financial Reporting Standards
NTP Network Time Protocol
ODA Organization Designation Authorization
PMR Passenger with Reduced Mobility
RMS Resource Management System
SCR Slot Clearance Request/Reply
SSIM Standard Schedules Information
TIA Tribhuvan International Airport
WSG World Slot Guidelines
11
4. Scope of Service
The scope of services has been defined in two phases i.e., Phase I and Phase II. Phase I will be of 24
months whereas Phase II will be of 60 months. The detail plans for either of the phases are as following:
Phase I - The proposed solution shall be implemented as per the overall functional requirements
mentioned in the bidding document. The key components of the implementation include:
Component 1: Analyze and Revise the SRS to meet end the end user requirement based on the functional
module requirement in the bidding document.
• Trainings
• Change Management Strategy
• Change Management Workshops
Phase II - The key component of implementation schedule in this phase will include:
Annual Maintenance Contract (AMC) for Software license renewal and On-going
support
12
5. Implementation Team
The project will be implemented by the implementation team that shall comprises of
• Project Managers from CAAN,
• Project Managers, Functional Members and Technical Members for each module from Supplier
Key Activities
6. Methodology
The supplier shall adopt the standard project implementation methodologies to install and commission
the proposed ERP solution. The implementation plan is depicted as following and is of illustrative nature.
The supplier is expected to strictly adhere to the standard methodologies for Assessment, Design,
Documentation, Development, Customization, Testing, UAT, Piloting, Rollout, Operation &
Maintenance, Backup & Restoration, Quality Management, Risk Management, Capacity Building and
Change Management.
13
The supplier is advisable to follow the agile methodology of system development and
Implementation to meet the end-user requirements in multiple stage where end-user could not
provide the overall requirements at once.
7. Reporting Requirement
The general reports to be submitted by the supplier are as listed below:
i) Project Plan
To Be Report
14
The supplier submit a To Be document after proper study of this document, As-Is process, and
conference room piloting. The document shall be the base for system implementation.
15
The supplier is advisable to follow the agile methodology of system development and
Implementation to meet the end-user requirements in multiple stage where end-user could not
provide the overall requirements at once.
7. Reporting Requirement
The general reports to be submitted by the supplier are as listed below:
i) Project Plan
To Be Report
14
The supplier submit a To Be document after proper study of this document, As-Is process, and
conference room piloting. The document shall be the base for system implementation.
15
8. Detail Technical & Functional Requirements:
16
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
backup site is proposed for Gautam Buddha
International Airport, Bhairahawa around 300 km
apart from TIA.
17
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
AC-15 The system should support store and access records
in Nepali Unicode font.
AC-18 The system shoud have end user web protal as per
requirement of CAAN at least but not limited for the
following
CAAN employee
Airlines
Ground Handlers Agencis
Government agiencies
Other agencies idenfied at implimentations
AC-19 The system must provide a centralized record for the
definition and configuration of all data/information
parameters flight and airport resources.
18
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
AC-23 The system must support IATA and ICAO codes.
Both coding systems can be used interchangeably and
simultaneously in displays, configurations, rules, etc.
19
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
AC-33 The system must have a place to define the work date
range for each user. The date must be the current date
for all users except for few administrative users.
AC-34 The system must have the ability to export and import
data to and from excel files easily by all users in the
front end without any support from IT Department.
20
II. Financial Management and Reporting
a. General Ledger & Budget:
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
The finance module should consist of the following:
General Ledger
Cost and Revenue Centers
Budgets
Account Receivable
Account Payable
Cash and Bank Book
Bank Reconciliation
FM-1 Project Accounting
Fixed Assets
Inventory
Payroll
Multicurrency
Month End/Year End Procedures
Investment portfolio
Audit module
21
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
Chart of Accounts must be easily configurable into
groups and subgroups to show totals and subtotal to
FM-4
multiple levels.
22
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
year. At beginning of the each fiscal year system need
to capture budget data from CAAN-BMIS.
23
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
Approval can be given for one voucher at a time as
well as for a group of vouchers in a batch. Both
FM-22
processes should be allowed in the system.
24
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
25
Requirement Compliance Supplier
No
(Full/Part/Non) Remarks
FM-51 The summary cash and bank book should have the
following fields with period-wise filtering options.
26
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Also, detail cash and bank book should be available
in the system for transaction wise detail view.
27
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-60 A system should be able to handle the daily
operations at the cashier. Cash or bank vouchers
collected for miscellaneous payments (membership
registration, document purchases, examination fees,
etc.) should be properly accounted in the system.
c. Receivables Management:
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Customer Registration should be done with fields as
mentioned below:
a) Customer Code
b) Customer Name
c) Airline Registration No.
d) Customer Address (Municipality, District,
FM-63
State, Country in the drop-down list)
(Multiple Address for same customer should
be maintained)
e) VAT/PAN Registration Number
f) Customer Type (Internal/External,
Local/Foreign, Private/Government etc.)
28
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
g) Customer Group (As per revenue heads)
h) VAT Applicability field
i) Phone number
j) Email address
k) Website address
l) Contact Person (at least 2 contact persons
with phone numbers and designation fields)
m) Credit Days
n) Credit limit
o) Security Type (Advance, Letter of Credit,
Bank Guarantee, Security Cheque)
p) Credit Terms (Payment Discounts, Interest
Charges, Penalty)
q) Payment Methods (Cash, Cheque, IPS,
others)
r) Transaction Currency
s) Customer Bank Account Details (Name,
Number, Address, Branch, SWIFT Code)
t) Ability to attach Agreement Documents (at
least 2)
u) Place to add notes in the customer card.
v) Ability to block transaction with the customer
(options: invoice only, cash receipt only or
both)
w) Sales Representative responsible for the
customer
x) Default revenue Account, Default Receivable
Account
y) Interaction logs recording with the customers.
29
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
30
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
have the ability to calculate such interest in a
customer on ad-hoc basis.
31
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
for each branch, division and type or receipt. User
should be able to find the entries in future with
reference to the same number.
32
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
33
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
should make automatic cash receipt entries upon
successful payments. These entries should be
numbered separately and must have separate
identification for source for reconciliation purpose.
Logs should be maintained for all such attempts to
pay with transaction id, date, time, and
success/failure status.
34
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Facility should be available to view all transactions of
FM-107 customers since the system is used by the company.
35
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Receipts history by Customer or Payment type or
Invoice
Standard report for tracking unapplied receipts
Aged customer statement of account
(Summary/Detail). The system should have the
ability to generate ageing report for the past dates as
well.
d. Payables Management:
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-113 Payables arise as a procurement of goods, work
or services, advance payments to such suppliers,
employee payments, withheld taxes to
government, etc. System should have the ability
to record accruals and payments of such
transactions.
36
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
r) Place to add notes in the vendor card
s) Ability to block transaction with the vendor
(options: purchase only, payment only or
both)
37
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
38
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
39
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-139 Provide the ability for the user to create and maintain
templates, set up for a specific vendor for goods
and/or services that are commonly purchased. The
user can retrieve the template, make the necessary
updates and release.
40
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-144 Enable payments to one-time vendors who are not
defined in the payable system.
41
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Print Bank transfer letters with Vendor bank
Account details.
Provide for inputting debit/credit memos and apply
them to the invoice.
42
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Age the payable reports (Summary and detail)
by Due date, by Invoice date with facility to
input time bucket for age classification
Historical vendor invoices (settled fully)
Purchase back-order reports
Material Receipts for which invoice is not yet
received
Vendor Statement of Account in foreign/local
currency
Overdue invoices by vendor
Vendor purchases/purchase-
returns/payments/voided-payments
Invoices on hold
Email to suppliers (Vendor ledger, Balance
Confirmation, Remittance advice etc.)
Outstanding analysis by Department or Cost
Centre
Accounts payable sub ledger in summary and
in detail
Payment due alert
Payment due date management
Check Register
User friendly report writer for ad hoc
inquiries/reports
e. Project Accounting:
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-159 Small and large construction projects are always
going on at CAAN. It needs to track the project-wise
expenses and payments.
43
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-162 The system should generate a unique identification
number for each project. It should include details of
contractor and job description.
44
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-173 Account codes /Sub codes –The number of digits in
the account codes/sub codes should be decided at
implementation level and there should be a Flexible
Chart of Accounts which provides user friendly
interface when dealing with other sub modules in the
Finance division as well as other main modules.
46
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
FM-192 Ability to attach documents including CAD designs,
maps for networks etc. to a project, sub project, Work
Order or Work Order task.
47
III.Revenue Management (Billing)
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Major Source of revenue for CAAN are:
Landing & Parking Fees
Cargo Handling Fees
Passenger service charge (PSC)
Communication & Navigation Charges
Ground Handling Charges
Security Charges
Fire Safety Charges
Airlines Fuel Charges
Inflight Catering Charges
Executive Lounge Charges
Airlines Registration/Renewal Charges
Royalty charges
Advertisement charges
Flight registration Charges
BI-1 Flight Permission Charges
Flight Repairs/repairs Permission Charges
Crew Registration Charges
Vehicle Entry/Parking Charges
Security Pass Charges
Rental Income
Land lease Income
Telephone/Internet Service Charges
Academic/Training fees
Time extended hour charge
Metrology Charge
Overfly charges
Other Miscellaneous sources as prescribed in
the related regulations, directives or policy of
CAAN.
48
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
ledger, ageing reports and process payment using
Interbank Payment Services (connect IPS for
example). This feature can be provided using other
external systems as well.
49
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
50
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Payment terms must be defined for each customer in
the customer master and same should be reflected in
BI-19
invoices as well.
51
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
The system should maintain the master records for
such rents including fields such as Alpha-numeric
asset tag no., building, room, cost center, asset type,
BI-27 asset class, stock no. serial no. manufacturer, model
no. book type, etc. whatever property is managed by
this division.
52
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
should be maintained the system and same should be
linked to the customers’ credit facility.
53
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Income account, VAT account should be maintained
in local currency. Receivable account for foreign
BI-42 currency transaction should be maintained in both
currencies.
54
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
The system should be able prevent duplicate
BI-50 invoicing for same transaction.
Reports (non-exclusive):
55
IV. Procurement, Inventory & Fixed Assets Management
a. Procurement:
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
The system shall be capable of maintaining a supplier
GM-1 registry with renewal in every financial year option.
On this registry, it shall be possible to maintain details
about items and services which they can supply, the
related cost, the credit limit and period which they
allow and the status of the supplier (Active, Inactive,
blacklisted).
56
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
GM-7 Purchase process can be done by different
departments, divisions and sections with amount
limitation. The purchase process requires approval
from higher authority before it moves forward.
Approving authority is determined based on
department and amount limit.
57
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
performance bond. Therefore, the system shall have
the capability to add details of such bond in the
system.
58
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
transactions should immediately effect GL accounts
and party ledgers.
59
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
GM-29 Some part of VAT amount is paid to the vendor and
remaining is paid directly to IRD as per IRD clauses.
Such amount of vendor-wise VAT withheld and paid
information should be tracked in the system.
60
No. Requirement Compliance Supplier
(Full/Part/Non) Remarks
GM-39 Reports for Purchases (nonexclusive):
Purchase Orders
Open Purchase orders list
Open Purchase requisitions
Top Vendors based on purchase
value/outstanding balance
Location wise Purchase analysis
Item wise vendor purchase report
Open Purchase invoices
Purchase VAT Books
Purchase TDS Report
Purchase GRN report
Purchase Return Report
Purchase Order Ageing
Vendor wise Purchase Items quantity and
Value
Fixed Asset Acquisition report
User alert reports
b. Inventory Management:
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
GM-40 CAAN maintains inventory of various items such as
stationary items for consumption and spare parts for
equipment and machinery maintenance. Movement
of such inventory from procurement to consumption
should be recorded in the system.
61
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
be used in the system. Where item is supplied without
any code, system should generate alphanumeric
codes for such items based on pre-assigned number
series.
63
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Periodic Stock Ledger (Quantity and Value)
Items Group wise stock report
Stock Movement Reports
Stock Consumption Report
Supplier wise, Periodic Item purchase report
Stock Transfer Report
Location wise Stock Report
Expired Items Report
Disposed Item Report (Auction, waive etc.)
Physical Variance Report
Inventory Adjustment Report
Inventory Requirement Report
Bin wise Inventory report
Stock Ageing Reports (based on Purchase
GRN date)
64
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Asset transfers.
Scan copy legal ownership document
65
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
GM-69 Assets that need maintenance and not in working
condition should be marked as under maintenance.
Such flag should be removed after maintenance is
completed.
66
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
g) Maintenance register showing list of assets
that went through repair and maintenance
with maintenance cost for a given time
interval.
h) Asset under maintenance reports.
i) Insurance Expiry reports.
j) Service Reminder reports.
k) Individual asset wise history report
67
V. Human Resource & Payroll Management
68
No Requirement Compliance Suppliers
(Full/Part/Non) Remarks
HR-5 The system shall have the ability to communicate
automatically with administration and HR
departments.
69
No Requirement Compliance Suppliers
(Full/Part/Non) Remarks
HR-16 The user shall be able to create and modify
benefit/deduction plans based on employee status
change.
HR-21 The user shall be able to drill into benefit groups and
plans to check specific enrolment information such
as a list of employees whose enrolments are
completed, in progress, or not yet started.
70
No Requirement Compliance Suppliers
(Full/Part/Non) Remarks
HR-25 The system shall provide a facility for the employees
to request for update their benefit coverage based on
life event changes like marital status, life insurance
purchase, full or part disability, with supporting
document attachment etc.
71
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
have the ability to identify absence, late attendance,
half days, etc.
72
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
employees, apply for leave as per CAAN policies,
see leave approval status, see attendance data, leave
availed and accumulated leave data.
73
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-50 Paid and unpaid Leave should be separately
maintained and reported.
74
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
75
iv. Training and Education:
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-67 System should have a module to manage employee
training, education and License management with
education, training and license details, history,
request and approvals.
HR-70 The user shall have the ability to search for the
following data.
Skill Code
Skill Description/ License Ratings
Experience Level
Proficiency Level
76
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
trainings and needs assessment), trainee name, venue,
etc.
77
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR can process his request or reject the request with
reasons.
79
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Employee on Trainings Details
Employee Training Commitment and
Fulfilments
Employee and course completed
Course wise trainees
80
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-112 For each division and position, HR (Admin) can
manage employee requirement through temporary
(Kamkaj) and permanent (darbandi) transfer
processes as defined in CAAN employee transfer
policies and practices. System should have option for
both types of transfer approvals process.
81
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
with reasons in the system. The approval or rejection
should be notified to the employee.
HR-124 Reports:
Employee Transfer (Permanent/Temporary)
History
Transfer Request Status
Rejected Transfers
Relocation and Outstation Allowances
Details
82
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
83
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-140 The best employee awarded record should be updated
in employee information every year.
HR-146 Reports:
Appraisal History
Division-wise, Department-wise, Level-wise,
Employee-wise Scores
Appraisal Letters
Promotion Letters
Top performing employees
Appraisal Forms
Prize and charge action list
84
viii. Retirement & Benefits:
85
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-162 Reports:
Retirement History
Settlement receivable and payable
Final settlement reports
Gratuity Reports
Retirement Fund Release Reports
Retired Employees List
Probable retired employee report (time
range)
86
ix. Payroll and Pension Management
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-163 The finance module shall integrate with the HRM,
payroll module to process information /documents
such as,
Recruitment details, promotion details,
employee leave/absence, demographic
analysis of employees such as age wise,
gender wise, Department wise analysis etc.
analysis etc.
Salary revisions (Basic/Grade)
Overtime /no pay
Employee License rating grade
Bonus
Payments for trainees
Welfare payments
Travel Expenses
Pension
87
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
88
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-178 The calculated payroll should show each head-wise
calculated data for an employee on the screen.
HR-187 The system shall provide the facility to work out and
deduct advances at different times of the year. The
request for the advances shall be made from the
individual department.
89
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
HR-188 Facility shall be provided to compute Gratuity as per
laid down procedures.
90
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
91
VI. Airport Operational Database:
AD-1 The system must allow, based on the data, to manage
programming of the airlines and the planning of the
airport resources associated with the operations to be
carried out with following information:
Airport information enroute, selectable by
ICAO/IATA code airport.
Obtain information from aircraft
operators, selectable by the ICAO/IATA
code of the airline.
Obtain data from the aircraft operated at
the airport, selectable by the ICAO/IATA
code of the aircraft.
Details of specific configurations
selectable by number registration of the
aircraft.
92
unplanned airline flights, military flights, aero-
ambulances, corporate flights, trainings, etc.
94
AODB – FDPS/AMHS: flight information,
planning, changes etc.
FDPS/AMHS – AODB: landing clearance,
aircraft number, hours landing and take-off
etc.
The exchange of information between AODB
and ATC System.
Corresponding website: flight related
information
Mobile app: flight related information
95
Domestic flight contact position
First 30 minutes or half-hour or fraction of an
hour additional
Related services
Water, internet, and electrical services
Remote position of air conditioning
Land transport of vehicles
Disembarkation of land vehicles
International flights
Contact position
Use of track lights (markup)
96
dashboards general, without multi-database
queries being required.
The multi-airport configuration must be able
to be fully managed at distance, and
dynamically. For example, adding rules
operations, or new resources at an airport
should not impact other airports, and must be
able to operate without having need to reboot
the system.
AD-27 AODB should capture and store relevant data for its
functioning from internal and external systems. The
sources of data can be:
Manual update by airlines, ground support
companies or airport authorities directly from
limited portal accessible to them.
Automatic update by airlines, airlines ground
handling companies or airport authorities (to
be through processes such as Excel sheet
loading containing updates, etc. ...)
Updated through ICAO/IATA messages or
any other program such as SITATEXT/Type
B Message
Updated by airport staff.
99
AD-34 The system must provide an undo /redo function users
to test a feature and return to the state before if
necessary.
100
Destination - Channel 1, Channel 2 Channel
3 (IATA standard - upstream of three previous
cities)
Origin - 1.2 of 3 (IATA standard - up to three
cities downstream)
g. Aircraft Information
Aircraft type and series (ICAO/IATA)
Aircraft subtype (ICAO/IATA)
Other type of aircraft
Aircraft number
Maximum take-off weight (MTOW) of the
aircraft
h. Location and resources of the flight
Terminal identification
Terminal name
Gate assigned.
Previous gate assigned.
Closing time of the door
Door opening time.
i. Information on ground assistance
Handling Identification / Ground Service
Company
Other identification of service providers
Food Delivery (Yes / No) (Catering)
Flight season start date.
Flight season end date
Other areas (airline, aircraft type, etc.)
101
scheduled flights in the base for rest of the season,
etc.).
102
AD-46 Of those aircraft that comply with the ADS-B
standard, the identification of the flight number
and/or Call Sign must be tracked.
AD-51 Reporting:
The system should provide the standard
reports list that include all reports required in
general year cycle and for general auditing
propose.
103
The system should allow the editing of reports
by hour, daily, weekly, monthly, and yearly.
The system must enable the recording,
traceability and generation of summaries
associated with performance data such as:
number of messages per interface (sending
and receiving), number of messages for a
period of (sending and receiving), number of
errors, number of connections.
All reports must be accessible in text and / or
in the form of graphics.
All reports must be exportable into text,
Excel, XML or pdf files.
These reports must be able to be automatically
generated at intervals regular configurable by
standard tool, with file server backup.
The reporting solution must work in real time
and KPI (aircraft punctuality, etc.).
The system shall be display synchronized
Gantt charts and dashboards on up to 4
separate screens with the ability to display
separately defined resources on separate
screens.
The schema of the Data Warehouse database
must be published and extensible.
The system must be able to maintain an Audit
trail of all changes to system data.
Able to generate various reports. Example:
OTP report; Delayed flight report for both
arrivals & departures on daily or weekly or
any other definable intervals on need basis.
Able to select the output of the reports (table,
chart type, colors, etc.)
Able to generate customizable reports.
Heavy usage of the reporting solution should
have no impact on the operational systems
(AODB etc.)
104
The system must be able to provide
dashboards and analytics for use on a mobile
device.
System shall contain a dashboard view of the
current resource plan, current KPI
performance, all upcoming tows, all rule
violations, all warnings, notifications, and
cancelled flights on one screen.
The system shall provide dashboard with user
customizable widgets to monitor operational
KPIs and widgets, maintaining full situational
awareness with respect to KPI performance.
Users with sufficient access credentials can
setup the multiple Dashboards to track
various pre-defined KPIs.
Users shall be able to create new Dashboard
as and when required.
105
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
RM-3 The RMS must allow to manage airport resources in
a comfortable manner with a graphical environment
that includes the possibility of allocating resources
through a simple "drag and drop".
106
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
RM-10 By means of color coding, it should indicate whether
the resource is free or busy and should give
information about the assigned operation, as well as
the next planned operation.
RM-11 The RMS system must operate fully in real time with
the AODB.
107
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
RM-20 The solution must allow to filter the Gantt charts for
display only resources with certain characteristics as
well as certain types of flight assignments. E.g., cargo
planes and posts cargo, or international aircraft and
movements International.
108
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
The RMS system must be able to generate scenarios
to allow the optimal choice to the operator.
The RMS system coupled with the AODB must be
ready to operate in an A-CDM environment
109
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
RMS should allow users to identify and create
their own restrictions and define the rules.
RMS should provide automatic conflict alerts
stations. Including conflict resolution
functions.
RM-37 Stands/Bays:
The user shall be able to maintain stand/bay
rules that specify which aircraft are allowed
for each resource.
The user shall be able to specify any
constraints for using stands/bays. E.g., certain
aircraft types cannot be parked together or
must be allocated to a specific location.
The user shall be able to maintain preferences
for using stands/bays. E.g., airlines specific
agreements for stand/bay usage and buffer
times.
The user shall be able to create overlapping
stands. E.g., where a bay can take different
configurations depending on the type of
aircraft.
RM-38 Gates:
The user shall be able to define which gates
(arrival and departure) are allocated to a
stand/bay. Note: Gates and bays can have
different numbers.
110
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
The user shall be able to maintain preferences
for using gates. E.g., airlines specific
agreements for gate usage.
The user shall be able to allocate a gate to a
bus departure point.
The system must allow both arrival and
departure gates.
The user shall be able to control the activation
or deactivation of gate display screens.
Airlines shall be able to manage the control
and content of gate displays allocated to them.
111
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
The user shall be able to specify the duration
that the counters are allocated by airline.
The user shall be able to override counter
allocation to suit operational requirements.
The user shall be able to control the activation
or deactivation of check-in display screens.
Airlines shall be able to manage the control
and content of counter displays allocated to
them.
The system should be able to smart allocate
counters based on number of passengers.
112
Maintenance Engineers etc.), their license,
certificates, heath fitness records, flight hours etc. as
per CAAN policies. The system must be able to
manage such operation and approval process as per
CAAN business process.
SM-9 Flight Operation management module shall be
integrated with AODB, and Financial Management
Module.
SM-10 System should have computer based examination
and manual screening test records, fitness test
records options etc.
SM-11 Technical manpower List, License Expiration Report,
Renewal Alerts, Individual License Reports, etc.
113
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
114
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
a service engineer should also be assigned to that
work order.
115
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
EN-28 With the new system, the link between all relevant
documents shall be maintained. Therefore, it shall be
possible for users to move from one document to
another by clicking on the respective document. i.e.
116
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
work order, service order, inventory requisition,
purchase order.
EN-32 The store person should have the ability to see the
service order details from the requisition order.
117
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
EN-40 After the service is completed, service department
should ensure that NOTAM is closed for the services.
EN-45 Reports:
Pending Work Orders
Pending Service Orders
Upcoming Services for Scheduled
maintenance
Service Plan Report
Assets under maintenance
Service History
Service Efficiency based on work order date
to service completion date.
Inventory Consumption report
Inventory Issue Report
Inventory Availability Report
Inventory Requirement Plan
Inventory Movement reports
Assets Under Warranty
Insured Assets
Insurance Claims
Service Claims for assets under warranty
Service Calendar
Service Engineer Performance
Division wise service report
External Service Purchased
Quality Assurance Report
118
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Assets Replacement Requirement
Resources Calendar & Availability Report
119
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Date and time of actual operation
Date and time of availability of land
vehicles
Number of land vehicles
Parking hours
The use of the parking position, the
use of land vehicles, electric power
Remote parking positions to prepare
for departure or take-off
Boarded passenger information,
distance travelled and the type of
flight (national, international)
120
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
IS-9 Allow and control the synchronous or asynchronous
transfer of messages and information, allowing to
define the delivery times of the messages, the number
of delivery attempts, etc.
IS-11 Receive and send files via FTP / SFTP from and to
different systems.
121
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
IS-20 The system should provide possibilities for
notification of the general situation and system status
in real time through the graphical interface.
122
XIII.Detail License Requirement:
The bidder must provide with following licensing structure:
SN License Type Quantity Description
LR-1 Category 1 100 These types of users will have full access for
read, write, modify, delete across all cross
functional areas to all the modules. This user
will be working directly in the systems
interface.
123
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
NR-8 Web systems must be scalable, have quick response
times and suffer no penalty from the volume of
concurrent requests.
NR-9 The processing of large volumes of batch data e.g.
billing, shall not reduce the response time of the
system.
NR-10 The processing of system reports shall not reduce
the response time of the system.
Reliability
NR-11 Systems shall be available 24x7, 365 days a year.
NR-12 The system should support fault tolerant and highly
available.
NR-13 The system shall be auto backup and recovery
mechanism
NR-14 No single point of failure shall be allowed
NR-15 The system shall meet uptime reliability of
99.95%.
NR-16 The application shall support monitoring 24 x 7 for
availability. Bidder should provide details of the
incident response plan.
NR-17 The background tasks/services running shall not
interrupt user operation.
Identity and Authentication
NR-18 The application is capable of allowing user to
configure the following for local account security:
- Passwords length.
- Passwords history.
- Password expiry.
- Number of login attempts before account
lockout and re-activation periods.
- Account retention (disable/delete) after a period
of inactivity.
NR-19 Users must validate their identity before being
allowed to reset their password.
NR-20 The solution shall be designed with industry standard
cyber security protection.
Compatibility
NR-21 The system must be capable of running in a
virtualized environment, specifically VMWare,
ESX etc.
NR-22 Current Supported Internet Browsers include: MS
Edge, Internet Explorer 11, Chrome, and Safari.
124
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Change Management
NR-23 The Bidder should provide a training program
tailored for each user role of the system.
NR-24 The Bidder should provide experienced training
consultants that can provide on- site tailored
training for staff and airlines/handlers.
NR-25 All changes made to production systems (from go-
live onwards) must be made in accordance with an
ITIL based change management process.
Supportability
NR-26 The Bidder shall provide an Account Manager or
representative that can be contacted for licensing,
product roadmap, feedback, enhancement requests
and other business opportunities.
NR-27 The Bidder must provide a helpdesk support
contact number which can be reached 24x7
NR-28 The helpdesk support number must provide access
to support personnel with technical skills to answer
product questions or provide problem resolution.
NR-29 The Bidder should provide an escalation point with
contact details should a problem arise with the
service being provided or to gain priority support
for a critical issue.
NR-30 The Bidder must provide on-site implementation
services for the duration of the project
implementation and go-live.
NR-31 The Bidder should be able to provide periodic
health checks of the system if instructed.
NR-32 The Bidder should be able to provide a regular
quarterly report of incidents recorded by the
helpdesk showing that SLA has been achieved/not
achieved.
Future Updates
NR-33 The Bidder should provide periodic updates to
the software to fix known issues, vulnerabilities
and provide requested enhancements.
NR-34 Throughout the term of the agreement, all major and
minor version upgrades of the software will be
provided to customer at no additional cost. Releases
should be provided at a minimum of bi-yearly.
Other Specific Requirements
125
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
NR-35 The software provided shall be in compliance with
industry ICAO, IATA and ACI Standards and
Recommended Practices & docs for Information
Technology and allow compatibility with new
systems to be incorporated in the future.
NR-36 The solution shall be designed using current IT
products and best practices.
NR-37 The solution framework should be centralized
system that acts as a data repository for multiple
airports to improve & optimize airport operations
considerably. This framework should provide the
system at a centralized location for multiple
airports through a common shared infrastructure or
solution should be managed centrally.
NR-38 Bidder shall have to specify the airports and other
office licenses (if applicable)
NR-39 All application modules (dummy
systems) shall have to be installed on developing
and testing server for the purpose of testing and
training.
NR-40 The licensing provision should be able to create
unlimited users and allow a minimum of above
listed concurrent users including all branch users.
Or, if the concurrent user license provision isn’t
appropriate, no. of active user should be at least
1000.
NR-41 All these applications shall share the database
infrastructure and software architecture thus
largely eliminating the need for interfaces.
NR-42 The solution framework should be fully web-based
system.
NR-43 Migration of existing system data, initial data entry
into the new system (data capturing from hardcopy
files), and records (files) digitization shall be the
bidder’s responsibilities.
Non-Disclosure Agreement (NDA)
NR-44 Successful bidder has to sign the Non- Disclosure
Agreement with CAAN
Online Help
NR-45 On-line help for the application facility shall be available on
the workstation.
126
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
NR-46 The supplier shall provide help desk incident logs and reports
for all incidents and problems.
127
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
Encryption of data in motion as well as at
rest
Multilevel access control based on
classification of data
Block privileged account access to
application data
Masks and subsets sensitive production
data before sharing on nonproduction
environments
Centralized encryption key management
platform
DM-8 Performance features:
Read from disaster recovery database while
in recovery mode
Performance benefit by compression
Partition tables, indexes and index
organized tables
Memory-optimized relational database on
application tier
Automatic performance diagnostics and
monitoring
Automated application and SQL tuning
Partitioning (Table/Index)
DM-9 Have autonomous backup tools that provide points
of consistency over time
DM-10 All software in the database, including their
licenses, necessary for the proper functioning of
the system must be supplied and configured with
software support.
DM-11 The database system should not limit any data
items or counts
DM-12 Perpetual license mode, for any databases or
application software.
Other Supporting Software Components
128
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
(supervision, antiviral protection, etc.) must be
supplied and configured
129
No Requirement Compliance Supplier
(Full/Part/Non) Remarks
session shall be at least 1-week full time that cover the
comprehensive targeted user requirements.
TN-6 English language is mandatory for the instruction and
training modules. The Supplier shall provide one
complete set of training documents to each trainee at
least one (1) month prior to the commencement of the
training course in electronic and paper form.
TN-7 The supplier shall deliver training services to ensure
Services are ready for deployment and implementation
within timelines agreed with CAAN.
TN-8 The Supplier shall employ qualified and experienced
trainers using the most effective and efficient training
techniques to conduct the user training
TN-9 The supplier shall enhance, update and maintain
appropriate Training courses and materials over the
entire Term of Contract at no additional cost to CAAN
TN-10 The system shall include an online training package to
expedite training for users.
Support Requirements
SM-1 24x7 global support center to be available for remote
monitoring and support with necessary expertise on the
propose product.
SM-2 The supplier shall have to arrange such support arrangement
for next 2+5 years from date of contract.
SM-3 The Annual Maintenance Contract of software including
third party application and software client license shall be
carried out if CAAN intends to continue the service beyond
130
the initial contract period of 7 years. (The separate contract
agreement shall be carried with required services)
The reference charges shall be taken as the previous years’
service charge with applicable increment (maximum 5%
annually). The bidder shall have to agree the increment plan
(maximum 5% annually) for proposes of the continuity of
system beyond the initial contract period.
SM-4 During the entire contract period, software shall be under
maintenance of the Supplier & shall fully comply with all
the regulatory compliance, industry best practices at all
times.
SM-5 All bug fixes, version upgrades, updates related to all
components of the solution to be performed by supplier free
of cost during entire contract period.
SM-6 The supplier shall be responsible for integrate of airline
application (if any) for automation of data source on request
without any cost to CAAN or airlines.
SM-7 Mandates issued during the contract period by regulatory
/compliance bodies such as ICAO, IATA, CAAN and
PCIDSS etc. to be implemented by supplier free of cost to
CAAN.
SM-8 The Supplier shall submit a Service-Call Report to be sent
to the CAAN on monthly basis, indicating the time of call,
cause, remedial action taken and the time that the service
was restored.
SM-9 The level one, level 2 support and admin management
work shall be done by CAAN. But supplier shall have to
provide the sufficient support guideline and tools to CAAN
team. Any issues and problem that cannot handled by IT
personal shall be escalated to level 3 support team. The
level 3 support shall be available 24x7 hrs. without any
conditions.
Service Level Agreement (SLA) Requirements
SM-10 24x7 global support team should be attended promptly for
the issues arises
SM-11 The Service Level Targets CAAN intends to achieve in its
SLA is as follows:
131
Reporti Respo Resoluti
ng nse on time
window time
Severity 1 24x7 10 30 min
Mins
(core system malfunction,
performance degrade)
Severity 2 24x7 30 min 2Hours
(core system partial failure)
Severity 3 24x7 1 hour 4 Hours
132
XVIII. Final Acceptance – User Acceptance Test (UAT)
Technical
FA-1 The Supplier shall design detailed test procedures in
coordination with CAAN IT to verify the full compliance
of the installed System with final SRS. The test
procedures shall be submitted to CAAN for approval one
(1) month before commencement of the UAT.
FA-2 These tests shall form part of the acceptance requirements
by which the Supplier shall demonstrate to the satisfaction
of CAAN that the System installed fulfils the CAAN
requirements.
FA-3 The UAT shall be performed on site at CAAN premises
on the operational platform. The UAT will be performed
by the Supplier in the presence of CAAN and its assigned
representatives. CAAN will reserve the right to perform
some of the tests during the UAT.
FA-4 The Supplier shall be responsible for incorporate and
testing any modification found necessary as a result of the
tests. CAAN reserves the right to require any completed
test to be re-performed to verify that no adverse effects
result from the change.
FA-5 The Supplier shall also be responsible for updating all
impacted documents, including the revised test
procedures. The Supplier shall propose a new schedule for
the respective tests. Nonetheless, the Supplier shall be
responsible to ensure that the project key dates are
respected.
FA-6 There shall not be any additional cost of any form for re-
performed the tests and making the required modifications
to the system and/or documents.
FA-7 All tests pertaining to the System will be conducted with
the minimum interruptions to the airport operations and
the operational functions of all existing systems. All tests
affecting the airport operations and the reliability and
133
availability of the existing computer systems will be
scheduled during low traffic period in accordance with the
CAAN. The Supplier shall be liable for all damages
caused to the reliability and availability of the existing
systems resulting from the testing of the System.
FA-8 The UAT will be conducted in accordance with the
approved test procedures and will be witnessed by CAAN.
All test results of the UAT will be properly recorded,
documented and made available to CAAN. The System
will be deemed to have satisfactorily fulfilled the UAT
when all the tests have been completed successfully.
FA-9 The Supplier shall furnish all the necessary tools and test
equipment required to run the UAT in accordance with
this section.
FA-10 Any software failure, restart or changeover during the
UAT will be logged, reported and investigated by the
Supplier. The Supplier shall be responsible to determine
the cause of any failure and make the necessary
modifications to rectify the problems.
FA-11 UAT can be conducted separately for centralized
management and airports. Bidder shall have to propose
the plan in coordination with CAAN.
134
TS-3 The Supplier shall be agreeing for Annual Maintenance
Contract for the extended support agreement and software
client license if CAAN wish to continue the support
arrangement.
TS-4 The warranty and Guarantee shall be applicable for contract
period of system and service.
4. Drawings
135
5. Inspection and Test
The criteria (where applicable) for the acceptance of the installation and configuration
1. The supplier is required to provide proof of functional tests before installing the Multiplatform
Airport Operations System in CAAN’s premises.
2. The supplier will be responsible for providing the test plan and scenarios for User Acceptance
(UAT) which will be executed in coordination with CAAN IT Team.
3. The tests will include all the procedures suggested by the supplier and approved by CAAN,
as well as other additional tests that CAAN IT will request, and all are considered as
contractual obligations of the provider.
4. The planned program of all testing and commissioning activities will be included in the project
plan. CAAN reserves the right to ask a third party to supervise.
5. Specifications must be consistent with industry recognized test
6. The supplier must ensure the on-site presence of his project manager and his design engineers
during the testing and implementation phases
7. Representatives of CAAN and the supplier will complete the Provisional Acceptance by a
signed Protocol (Provisional Acceptance Protocol).
8. All serious and significant deficiencies will be noted and the supplier will have to correct them
till the next working day. All medium and weak gaps will be noted and the supplier must
correct them within five (5) working days
9. Provisional acceptance will not be granted if critical and significant deficiencies are not
corrected.
136