Case study: The Netherlands

100% electric P&A unit key to onshore


rigless well abandonment, reduced
emissions, smell, noise contour
NAM, an operator in The Netherlands, became apparent after detailed well Challenges
needed to select the most economical screening, engineering, and modeling. • Determine the most economical way
method to abandon more than 60 to abandon 60+ onshore wells, most
Baker Hughes collaborated with
wells on 23 different onshore locations of which were classified as H2S wells
WellGear and Mammoet to create a
drilled over a 60-year period. with LSA, benzene, and condensate
unique, low-impact, fully integrated
The first batch of ten wells included well abandonment project solution for • Design detailed engineering and
those with a complex scope of work, onshore P&A in The Netherlands bespoke solutions including rigless
requiring annular remediation. including well P&A services, hydraulic P&A; section milling; perf wash and
Because of the complexity of the wells, workover (HWO), logistics, and site cement; perforate, circulate
engineered and bespoke solutions preparation. Project management and and cement; and specific gas tight
such as section milling (SM), perf wash detailed engineering ensured efficient cement slurries
and cement (PWC), and perforate, planning, and close collaboration and
• Reduce emission, smell, and noise
circulate, and cement (PCC) were interface with the operator project
to account for close proximity
required to complete the work. team drove efficiencies in executing
to housing
Additionally, well abandonment the work. Outstanding project
barriers required a specific cement management ensured close cross-
slurry design. Most of the wells were product line and third-party Results
classified as hydrogen sulfide (H2S) collaboration and continuous • Incurred zero lost time incidents (LTI)
and had radioactive material with Low interaction with the operator. over 130,000 man-hours
Specific Activity (LSA), benzene,
and condensate. Strategizing the solution • Completed rigless well
abandonment scope within planned
A fit-for-purpose, modular 600,000-lb
Complicating the entire process was schedule and budget
hydraulic workover P&A unit with a
the proximity of the wells to housing
high performance rotary table • Reduced CO2 emissions, smell, and
and multiple non-technical risks (NTR),
complemented Baker Hughes’s noise contour by using a 100 %
so the solution required a reduction in
downhole technologies and enabled electric P&A unit, incurring zero NTR
emission, smell, and noise. The
full P&A of complex wells without the
operator required no health, safety • Experienced no HSE issues or
need for a drilling rig. The bespoke
and environmental (HSE) incidents, nonproductive time (NPT)
rigless P&A unit was 100% electric,
lower total abandonment costs, no
enabling low noise, smell, and • “I am very pleased that we are on the
residual liabilities, and to maintain the
emissions during the on-site right track.” — Operator CEO
overall plug and abandonment (P&A)
operations, mitigating NTR. This was
schedule. The solution must sustain
the first electrified P&A unit in the
the operator’s license to operate in the
operator’s history, and ran on
country and serve as a blueprint for
grid power.
future P&A projects.
Executing predictable
Coordinating the well plan performance
The scope of work required significant The first 20 wells were completed
engineering and planning of multiple within the schedule, planned budget,
contingencies. Selection of the optimal and in compliance with local mining
solution and downhole equipment (SM, and environmental regulations with no
PWC, PCC, fluids and cement slurries) remaining liabilities while limiting the

bakerhughes.com
total project costs. The supply chain of mud was delivered and 12,580 bbl “The P&A unit places several cement
stepped up providing a cost-effective (2000 m3) was recycled to the mud plugs at various depths in a well,”
solution through collaboration, multi- plant. There was a total of 1,900 reported NAM’s CEO in Nexstep’s Re-
skilling, technology innovation, and truckloads for these 20 wells which use and Decommissioning Report. “The
logistical solutions, despite operating included moving the HWO unit, tanks, well is safely and permanently closed
during the COVID-19 pandemic. pumps, cement bulk, fluids, waste, this way.”
pipe, tools, and offices from site to site.
The P&A work was successfully He went on to add, “I am very pleased
All logistical movements were
executed, and a total of 14,655 bbl that we are on the right track. At the
conducted safely without affecting the
(2330 m3) of cement was pumped to moment, we have already
nearby neighborhoods.
place 26 cement plugs. The annular decommissioned 22 wells. Our
integrity was re-established in multiple Because the operation used the all- ambition is indeed to decommission
complex wells which included 4 PCC, electric P&A HWO unit, 160 t of carbon those 70 wells, and I expect that we will
4 PWC, and 4 SM jobs. In the process, dioxide (CO2) was saved. The entire achieve this within the agreed term.
35 casing cuts were made and a total operation incurred zero LTI and the NTR So, we had a very good start.”
of 200 miles (320 km) of pipe was was carefully managed.
tripped. A total of 40,883 bbl (6500 m3)

This is the first fully integrated well abandonment approach which included a 100% electric P&A unit
that significantly reduced CO2 emissions, smell, and noise contour.

Copyright 2021 Baker Hughes Company. All rights reserved. 83404 bakerhughes.com