You are on page 1of 5

    +91‐77100 13322 ὘ sales@dreamsoftindia.

com

Zelenka Reporting Solutions

Introduction

Salient Features

Application

E‐Signature Process

Sample Reports

E‐Signature Process

As Shown in Image 1.0 User will have to Select and Fill the details in
the Report Viewing Section

 Date: From Date – To Date Will be selected by User.


From Which date till What date User wants to see the
Data.

 Area: Area will be Selected by the User. For Which Area


User want to see the Report.

 Equipment: All the Equipment Under that Particular Area


will Come in Drop down, User can Select the Equipment

 Report Name: User Can select the Report Name.

 Report Parameter: User can select the Report


Parameters.
 Batch No: User can Fill the Batch No.

 Product Name: User will have to fill the Product Name.

 Product Code: User can Fill the Product Code.

 Operation: User can fill the Operation details

 Type: User can Select the Type Blank, Maintenance,


Process.

 Step: User can Add the Step

 Log Interval: User can Select the Log Interval as Minutes


or Seconds and add the Value for the same.

As Shown in Image 2.0 Report will get generated.

 To Add E‐Signature in Report, User will have to Click on


E‐Signature Section.

 There are 2 Level of E‐Signature. One is Generator and


Other is Reviewer.

As Shown in Image 3.0 First Level will be Generator and Application
will  ask  for  User  Authentication  which  User  will  have  to  Fill  System
Login ID, Password and Add the Comments.
As  Shown  in  Image  4.0 After Adding  the  Generated  by  E­Signature
User Log can be Viewed in Reviewer E­Signature Log.

As Shown in the Image 5.0 User can see the Generator's E­Signature
Log.

As  Shown  in  Image  6.0  User  can  See  the  Report  Output  where  he
can  see  E­Signature  with  Generated  on  details.  Second  Level
Reviewer Can Click again on E­Signature After Reviewing the Data.

As  Shown  in  Image  7.0  Again  Reviewer  User  will  have  to  add  the
User Authentication  with  Comments.  Log  Report  will  be  Saved  in  E­
Signature Log Section.
As  Shown  in  the  Image  8.0  Reviewed  Log  Data  Reports  can  be
Viewed  in  E­Signature  Log  Section.  User  can  Click  on  the  E­
Signature Log and Generate the Report and Save the Report.

As Shown in the Image 9.0 User can see the Logged Data. User Can
Select and Generate Report.

As  Shown  in  the  Image  10.0  Report  can  be  Viewed  with  Reviewer
Log with Generated on details. User can also save this Reports and
Print this Reports. All the Reports can be Viewed in E­Signature Log.

὘ sales@dreamsoftindia.com

὏ +91­7208422044 / 7710032211 / 28672925 / 28693249

  
© ZELENKA ‐ ALL RIGHTS RESERVED.

You might also like