0% found this document useful (0 votes)
88 views21 pages

Load Data Calculation for Electrical Systems

This document contains a load data calculation for an unnamed project and premises. It lists descriptions of points and equipment for distribution boards 1 through 6, including the load per point, connected load, diversity factor, and maximum demand. However, most of the fields are blank or show errors, indicating the load calculation has not been completed.

Uploaded by

Ikha Zu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views21 pages

Load Data Calculation for Electrical Systems

This document contains a load data calculation for an unnamed project and premises. It lists descriptions of points and equipment for distribution boards 1 through 6, including the load per point, connected load, diversity factor, and maximum demand. However, most of the fields are blank or show errors, indicating the load calculation has not been completed.

Uploaded by

Ikha Zu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

DETAIL LOAD DATA CALCULATION

Project

Function of premises

A.1

1.0 DB1
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00
8 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

2.0 DB2
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

1 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

3.0 DB3
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

4.0 DB4
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

2 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

5.0 DB5
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00
8 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A) 32 SPN
f Cable size, (mm2) Cable length, (m)

6.0 DB6
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

3 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

7.0 DB7
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00
8 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

8.0 DB8
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

4 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

9.0 MAIN FIRE ALARM


Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

10.0 HOSE REEL PUMP PANEL


Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

11.0 SUCTION PUMP PANEL


Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

5 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

12.0 PNEUMATIC PUMP PANEL


Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00

a Total operating power, P (kW) for 1 Unit 0.00 0.00


b Total operating power, P (kW) for overall Unit 1 0.00 0.00
c Operating Voltage, Ue (V)
d Operating current, In (A) #DIV/0! #DIV/0!
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

6 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

SUMMARY OF LOAD
SSB/ Located at Bilik Suis
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 0.00 0.00
2 0.00 0.00
3 0.00 0.00
4 0.00 0.00
5 0.00 0.00
6 0.00 0.00
7 0.00 0.00
8 0.00 0.00
9 0.00 0.00
10 0.00 0.00
11 0.00 0.00
12 0.00 0.00
13
14
15

a Total operating power, P (kW) for 1 Unit 1 0.00 0.00


b Operating Voltage, Ue (V)
c Operating current, In (A) #DIV/0! #DIV/0!
d Circuit Breaker, MCB - In (A)
e Cable size, (mm2) Length, (m)

7 of 21
Blok - Gnd Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

A.2

1.0 DB1
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

2.0 DB2 0
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

8 of 21
Blok - First Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

3.0 DB3 0
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

4.0 DB4
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

9 of 21
Blok - First Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

5.0 DB5
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

6.0 DB6
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

10 of 21
Blok - First Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

7.0 DB7
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

8.0 DB8
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8
9

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

11 of 21
Blok - First Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises
SUMMARY OF LOAD
SSB Located at Riser A/1
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 DB1
2
3
4
5
6
7
8

a Total operating power, P (kW) for 1 Unit 1


b Operating Voltage, Ue (V)
c Operating current, In (A)
d Circuit Breaker, MCB - In (A)
e Cable size, (mm2) Length, (m)

12 of 21
Blok - First Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

A.3

1.0 DB1
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

2.0 DB2
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

13 of 21
Blok - Second Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

3.0 DB3
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8
9
9

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

4.0 DB4
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

14 of 21
Blok - Second Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

5.0 DB5
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

6.0 DB6
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8
9

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

15 of 21
Blok - Second Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises

7.0 DB7
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5
6
7
8
9
10
11

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

16 of 21
Blok - Second Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises
SUMMARY OF LOAD
SSB
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1 DB1
2 DB2
3 DB3
4 DB4
5 DB5
6 DB6
7 DB7

a Total operating power, P (kW) for 1 Unit 1


b Operating Voltage, Ue (V)
c Operating current, In (A)
d Circuit Breaker, MCB - In (A)
e Cable size, (mm2) Length, (m)

17 of 21
Blok - Second Floor
DETAIL LOAD DATA CALCULATION
Project

Function of premises SEKOLAH

SEWAGE TREATMENT PLANT


F DB - STP
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4

a Total operating power, P (kW) for 1 Unit 1


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Length, (m)

18 of 21
STP
DETAIL LOAD DATA CALCULATION
Project

Function of premises

1.0 TNB SUB-STATION


A DB-TNB
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4
5

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

B DB-MSB
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) Cable length, (m)

19 of 21
Sub-Station
DETAIL LOAD DATA CALCULATION

Project

Function of premises

1.0 MSB
Load Connected Diversity Maximum
No. Description No. of point per point Load factor Demand
kW kW % kW
1
2
3
4

a Total operating power, P (kW) for 1 Unit


b Total operating power, P (kW) for overall Unit 1
c Operating Voltage, Ue (V)
d Operating current, In (A)
e Circuit Breaker, MCB - In (A)
f Cable size, (mm2) From TNB Cable length, (m)

A LOAD INFORMATION for MAIN SWITCH BOARD


Description Load (CL) Load (MD) Standby Load
a Operating load (kW) - kW - kW kW
b Operating load (kVA) - kVA - kVA 0.00 kVA
c Operating Voltage, Ue (V) 415.00 V 415.00 V 415.00 V
d Operating current , In (A) - A - A 0.00 A

B POWER FACTOR CORRECTION INFORMATION


Description Load information (MD) Proposed correction
a Before correction - kW 0.00 kW
b K factor 0.73 φ 0.73 φ
c After correction - kVAR 0.00 kVAR

C TARIFF INFORMATION
Description Load information (Maximum demand)
a Tariff B
b Daily hours of operating 8.00 hour/day
c Monthly hours of operating 240.00 hour/month
d Estimation energy - monthly hours - kWHr/Month

20 of 21
MSB
DETAIL LOAD DATA CALCULATION

Project

Function of premises

D CALIBRATION/SETTING
Description Load information (Maximum demand)
a Operating load (kW) 0.00 kW
b Operating current , In (A) 0.00 A
c Current Transformer size (CT) 600.00 /5A
c Over Current Relay (OCR) TMS = 0.1 0.00 %
d Earth Fault Relay (EFR) TMS = 0.1 10.00 %