APPENDIX A
Survey Questionnaire
SURVEY QUESTIONNAIRE
Name:______________________________________ Age:________________
Questions:
1. Unsa kadugay naka nga mululupyo aning lugaraha? (How long have you been a resident
in this area?)
2. Kanus-a mubaha diring lugaraha? (When does flood occur in this area?)
3. Sa inyuhang panglantaw, unsa kaha ang mga rason ug epekto nganog mag baha sa
inyong lugar? In your own opinion, what are the causes and effects of flood in the area?
4. Unsa nga mga kalisud ang inyong mga nahiagoman diring lugaraha? (So far, what are
umalabot pang baha? (In your current situation, can it guarantee your safety when
DATE DEPTH
MONTH YEAR (mm)
OCT 1980 80.3
SEPT 1981 101.2
OCT 1982 70.8
SEPT 1983 150
OCT 1984 201.2
APR 1985 210
AUG 1986 88.9
AUG 1987 120.3
OCT 1988 68.1
MAY 1989 67.6
JUN 1990 47.5
NOV 1991 132.5
NOV 1992 67.2
DEC 1993 126.3
AUG 1994 53.2
MAY 1995 80.2
JUN 1996 75.3
JUN 1997 85.2
OCT 1998 87.5
NOV 1999 134.7
DEC 2000 87.1
NOV 2001 122.5
FEB 2002 95.2
OCT 2003 97.4
JUN 2005 77
MAY 2006 111.5
MAY 2007 121.3
MAY 2008 96.3
FEB 2009 289.3
JAN 2010 52.2
DEC 2011 215.1
DEC 2012 315.2
OCT 2013 68.2
MAR 2014 183.2
AUG 2015 52.6
NOV 2016 103.5
DEC 2017 105.2
JAN 2018 68.2
AUG 2019 42.6
DEC 2020 168.1
∑X = 4351.6
APPENDIX H
Soil Texture Classification
(Using USDA)
MAP DETAIL ON AREA TYPE SURFACES
ZONE A ZONE B
ZONE C ZONE D
ZONE A
Sand 97 77.6
A Silt 23 18.4 100 LOAMY SAND
Clay 5 4
ZONE B
Sand 40 45.5
B Silt 20 22.7 100 SANDY CLAY LOAM
Clay 28 31.8
ZONE C
Sand 47 47.9
C Silt 38 38.8 100 LOAM
Clay 13 13.3
ZONE D
Sand 94 75.2
D Silt 23 18.4 100 SANDY LOAM
Clay 8 6.4
APPENDIX I
Summary of Results
DESIGN CANAL ELEMENTS TABULATIONS
Actual New
Width, Depth,
LINE Q (m3/s) n S Velocity R Velocity
b(m) y(m)
(m/s) (m/s)
1 0.55 0.013 0.002 1 0.7 1.340733 NG 1.714637
2 0.8010054 0.013 0.002 1 0.75 1.472857 NG 1.751237
3 0.9386318 0.013 0.002 1 0.8 1.532412 NG 1.784629
4 1.220506 0.013 0.002 1 1 1.636389 NG 1.89329
INLETS
ZONE A 0.5496351 0.013 0.002 1 0.7 1.340733 NG 1.714637
ZONE B 0.2513703 0.013 0.002 0.5 0.5 1.102377 NG 1.166257
ZONE C 0.1376264 0.013 0.002 0.5 0.5 0.948259 NG 1.166257
ZONE D 0.2818741 0.013 0.002 0.5 0.5 1.134398 NG 1.166257
Variable, Y (y +
LINE b(m) B(m) y(m) A(m2) Freeboard(m)
freeboard) (m)
Time of Concentrations
Elevation @ Elevation @
ZONE L (m) Peak Discharge Q, m3/s
1 2
Inlet 0.5 - - 0.55
A
Line 1 118.6 7.3 7.06 0.55
Inlet 0.5 - - 0.251
B
Line 2 157.5 6.96 6.65 0.801
Inlet 0.5 - - 0.138
C
Line 3 75.9 6.65 6.5 0.939
Inlet 0.5 - - 0.282
D Line 4 215.5 6.3 5.9 1.221
Outlet 0.5 - - 1.221
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 7881
= 0.23139 m3/s
A2: A= 9734 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 9734
= 0.28545 m3/s
A3: A= 510 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 510
= 0.01495 m3/s
A4: A= 618 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 618
= 0.01811 m3/s
SUB - CATCHMENT B
Channel:
��ℎ = 0.0078�0.770 �−0.385
Time of Concentration
Tc = Tov + Tch = 4.1986 + 21.985 + 0.626
= 26.81 say 30 min ; i= 4.1mm/min
C = 0.27282
Channel:
��ℎ = 0.0078�0.770�−0.385
Time of Concentration
Tc = Tov + Tch
= 27.11 say 30 min ; i= 4.1 mm/min
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 6595
= 0.1295 m3/s
C2: A= 191 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 191
= 0.0037 m3/s
C3: A= 220 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 220
= 0.0043 m3/s
Channel:
��ℎ = 0.0078�0.770�−0.385
Time of Concentration
Tc = Tov + Tch
= 19.92 say 20 min ; i= 4.8 mm/min
C= 0.3351
8
Computing Maximum Discharge
D1: A= 9158 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 9158
= 0.2451 m3/s
D2: A= 648 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 648
= 0.0173 m3/s
4
D3: A= 726 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 726
= 0.0194 m3/s
3
APPENDIX M
Cross – Section of Trapezoidal Canal
Computations
ZONE A
Q
INLET @ ZONE
A:
Given:
Q= 0.550 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.4866157
b= 1.554y = 0.756201
A= 0.875 P= 2.486607
1 2/3 1/2
�= � �
� = 1.714637 V > Vactual OK
LINE 1
Given:
Q= 0.550 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y=
0.4866157
b= 1.554y = 0.756201
A= 0.875 P= 2.486607
1 2/3 1/2
�= � �
� = 1.714637 V > Vactual OK
ZONE B
Q Q
INLET @ ZONE
B
Given:
Q= 0.251 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.3628005
b= 1.554y = 0.563792
1 2/3 1/2
�= � � = 1.166257 V > Vactual OK
�
LINE 2
Given:
Q= 0.801 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.5602906
b= 1.554y = 0.870692
1 2/3 1/2
�= � � = 1.751237 V > Vactual OK
�
ZONE C
Q Q
INLET @ ZONE
C
Given:
Q= 0.138 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.2894431
b= 1.554y = 0.449795
1 2/3 1/2
�= � � = 1.166257 V > Vactual OK
�
LINE 3
Given:
Q= 0.939 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.5946149
b= 1.554y = 0.924032
1 2/3 1/2
�= � � = 1.784629 V > Vactual OK
�
ZONE D
Q Q Q
INLET @ ZONE D:
Given:
Q= 0.282 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.3787222
b= 1.554y = 0.588534
1 2/3 1/2
�= � � = 1.166257 V > Vactual OK
�
LINE 4
Given:
Q= 1.221 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.656149
b= 1.554y = 1.01966
1 2/3 1/2
�= � � = 1.89329 V > Vactual OK
�
OUTFALL
Given:
Q= 1.221 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2
y = 0.656149
b= 1.554y = 1.01966
Therefore: Based on road elevation detail, possible road bridge elevation is at 9m and stream
elevation is 3m.
APPENDIX O
Canal Profile
ZONE – A CANAL LAYOUT
ZONE – B CANAL LAYOUT
APPENDIX O
Documentations
(a) (b)
(c) (d)
(e) (f)
Conducted surveys through in-person interviews with the residents of Upper Napit-an,
Maninihon Bayawan City, Negros Oriental
(c) (d)
This is the portion of possible route of the designed drainage system; (a) Zone A, (b) Zone B,
(c) Zone C & D and (d) drainage outlet.
(a) (b)
(c) (d)
(e)
Filling samples inside the bottle (f), Shaking the bottle (g), and Storing the sampled soil and
wait for 24 hours to settle down the soil.
Measuring settled soil using ruler.
Soil total depth and particles are measured to get the percentage sand, sild and clay.
(a)
(b)
These are the letters that was address to CDRRMO for the request of (a) topographic map and (b)
proof of 40 years record - rainfall data in Bayawan City Negros Oriental.
Actual survey in the area of Upper Napit – an, Maninihon, Bayawan City using Real Time
Kinetics instrument (RTK).
APPENDIX P
RESEARCHERS’ VITAE
PERSONAL DATA
EDUCATIONAL BACKGROUND
AFFILIATION
Member
Philippine Institute of Civil Engineering (PICE) - NORSU Chapter
Engineering and Architecture Student Society (EASS)
American Concrete Institute (ACI) - NSC
TRAINAING/SEMINAR/WORKSHOP
PERSONAL DATA
EDUCATIONAL BACKGROUND
AFFILIATION
Member
Philippine Institute of Civil Engineering (PICE) - NORSU Chapter
Engineering and Architecture Student Society (EASS)
American Concrete Institute (ACI) - NSC
TRAINAING/SEMINAR/WORKSHOP
PERSONAL DATA
EDUCATIONAL BACKGROUND
AFFILIATION