APPENDICES

APPENDIX A
Survey Questionnaire
SURVEY QUESTIONNAIRE

Name:______________________________________ Age:________________

Questions:

1. Unsa kadugay naka nga mululupyo aning lugaraha? (How long have you been a resident

in this area?)

2. Kanus-a mubaha diring lugaraha? (When does flood occur in this area?)

3. Sa inyuhang panglantaw, unsa kaha ang mga rason ug epekto nganog mag baha sa

inyong lugar? In your own opinion, what are the causes and effects of flood in the area?

4. Unsa nga mga kalisud ang inyong mga nahiagoman diring lugaraha? (So far, what are

the challenges you had experienced with this flood?)

5. Sa inyuhang sitwasyon karon, makasigurado bamo sa inyung seguridad sa mga

umalabot pang baha? (In your current situation, can it guarantee your safety when

another flood may occur?)


APPENDIX B
Topographic Map
Sketched Map of the catchment area from NORSU Bayawan Arena
Delineated Watershed with Measurements
Delineated Watershed with Path of the Designed Drainage
Detailed Site Location with Boundaries
Detailed Site Location with Sub – catchment for effective runoff
LEGENDS:
Zone A
Zone B
Zone C
Zone D
Designed Drainage
Route
Most Remote
Point per Zone

Site Working Map


APPENDIX C
Topographic Data
(REAL TIME KINEMATIC POINTS DATA)
REAL TIME KINEMATICS POINTS DATA

POINT EASTING NORTHING POINT EASTING NORTHING

P1 1145.752 -3341.8128 P26 1145.7521 -2641.8128


P2 1145.752 -3291.8128 P27 1095.7521 -2641.8128
P3 1145.752 -3241.8128 P28 1145.7521 -2641.8128
P4 1145.752 -3191.8128 P29 1095.7521 -2591.8128
P5 1145.752 -3141.8128 P30 1145.7521 -2591.8128
P6 1145.752 -3091.8128 P31 1095.7521 -2591.8128
P7 1145.752 -3041.8128 P32 1145.7521 -2591.8128
P8 1095.752 -3041.8128 P33 1095.7521 -2591.8128
P9 1145.752 -2991.8128 P34 1195.7521 -2641.8128
P10 1095.752 -2991.8128 P35 1195.7521 -2691.8128
P11 1145.752 -2941.8128 P36 1195.7521 -2741.8128
P12 1095.752 -2941.8128 P37 1195.7521 -2791.8128
P13 1145.752 -2891.8128 P38 1195.7521 -2841.8128
P14 1095.752 -2891.8128 P39 1195.7521 -2891.8128
P15 1145.752 -2841.8128 P40 1195.7521 -2941.8128
P16 1095.752 -2841.8128 P41 1195.7521 -2991.8128
P17 1145.752 -2791.8128 P42 1195.7521 -3041.8128
P18 1095.752 -2791.8128 P43 1245.7521 -3041.8128
P19 1145.752 -2791.8128 P44 1245.7521 -2891.8128
P20 1095.752 -2741.8128 P45 1245.7521 -2841.8128
P21 1145.752 -2741.8128 P46 1245.7521 -2791.8128
P22 1095.752 -2741.8128 P47 1245.7521 -2741.8128
P23 1145.752 -2691.8128 P48 1245.7521 -2791.8128
P24 1095.752 -2691.8128 P49 1295.7521 -2841.8128

P25 1145.752 -2691.8128 P50 1345.7521 -2791.8128


APPENDIX D
Rainfall – Intensity – Duration – Frequency Data (RIDF)
(CDRRMO-BAYAWAN)
COMPUTED EXTREME VALUES (in mm) OF PRECIPITATION
RECURRENCE
INTERVAL 2 5 10 15 20 25 50 100
(YEARS)
RAINFALL
98.65 154.33 191.19 211.98 226.55 237.76 272.31 306.61
DEPTH IN (mm)
TIME
CEV (mm)
DURATION
5 14.72 23.03 28.54 31.64 33.81 35.49 40.64 45.76
10 17.01 26.61 32.96 36.55 39.06 40.99 46.95 52.86
15 21.45 33.55 41.56 46.08 49.25 51.69 59.20 66.65
20 30.83 48.23 59.75 66.25 70.80 74.30 85.10 95.82
30 39.46 61.73 76.47 84.79 90.62 95.10 108.93 122.64
1H 49.33 77.16 95.59 105.99 113.27 118.88 136.16 153.31
2H 61.66 96.45 119.49 132.49 141.59 148.60 170.20 191.63
4H 59.07 92.41 114.48 126.94 135.66 142.37 163.06 183.60
6H 68.04 106.43 131.85 146.20 156.24 163.97 187.80 211.46
12H 93.33 146.00 180.88 200.55 214.33 224.94 257.63 290.08
24H 98.65 154.33 191.19 211.98 226.55 237.76 272.31 306.61

RECURRENCE INTERVAL (YEARS)


TIME
DURATION 2 5 10 15 20 25 50 100
IN min
5 2.94 4.60 5.70 6.32 6.76 7.09 8.12 9.15
10 1.70 2.66 3.29 3.65 3.90 4.09 4.69 5.28
15 1.43 2.23 2.77 3.07 3.28 3.44 3.94 4.44
20 1.54 2.41 2.98 3.31 3.54 3.71 4.25 4.91
30 1.31 2.05 2.54 2.82 3.02 3.17 3.63 4.08
60 0.82 1.28 1.59 1.76 1.88 1.98 2.26 2.55
120 0.51 0.80 0.99 1.10 1.18 1.23 1.41 1.59
240 0.24 0.38 0.47 0.52 0.56 0.59 0.67 0.76
360 0.18 0.29 0.36 0.40 0.43 0.45 0.52 0.58
720 0.13 0.20 0.25 0.27 0.29 0.31 0.35 0.40
1440 0.06 0.10 0.13 0.14 0.15 0.16 0.18 0.21

Rainfall – Intensity – Duration – Frequency – Data for Bayawan City


BASED ON 40 YEARS RECORD FROM CDRRMO MAIN OFFICE
APPENDIX E
Rainfall – Intensity – Duration – Frequency Curve (RIDF)
(40 YEARS OF RECORD)
.

Rainfall – Intensity – Duration - Frequency Curve for 40 years.


APPENDIX F
Monthly Rainfall Data from CDRRMO-Bayawan
(1980 - 2020)
CITY DISASTER RISK REDUCTION AND MANAGEMENT OFFICE
STATION: BAYAWAN CITY LATITUDE: 9.367848
PROVINCE: NEGROS ORIENTAL LONGITUDE: 122.8083
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

1980 31 36 27.1 15.5 15 62 60.2 32 30.8 80.3 42.7 21.2


1981 60 27 5.2 5 22.5 72.3 49 43 101.2 79.2 25.1 50
1982 16 31 10 26.6 40 37.5 35.2 46 17.2 70.8 31.8 27
1983 23 11 0 0 0.2 20.2 32 18 150 69.5 96.2 18
1984 51 31 15 32.1 31.4 60.3 51.2 16 80.6 201.2 45 20
1985 63 10 5 210 13 18.3 37.2 27 52.8 86.7 26.3 46
1986 52 48 20.2 10 10 37.3 28.1 89 10 65.3 19.1 20
1987 15 10 25 0 0 2.3 32.5 120 86.2 31.1 20 65.2
1988 0.0 7 9 15.2 7.1 58.8 47 53 57.1 68.1 27.9 17.3
1989 30 0 0 5.3 67.6 35.6 34.6 32 10.5 15.5 56.3 15
1990 11 17 15.2 15.2 20.1 47.5 34.6 35 32.3 15.5 42.6 15
1991 12 23 15 52.5 10 14.4 25.7 21 20 32.5 132.5 10
1992 20 5 0 2.5 3 36.2 37.1 48 40.9 40.9 67.2 20
1993 31 42 25 22.6 1.2 15 44.5 11 35.6 16.2 35.2 126.3
1994 19 23 16.2 26.5 33.5 35.3 20.5 53 32.8 30 12.5 15.2
1995 4 0 42.9 0 80.2 20.6 21.1 68 69.3 16.9 34 39.5
1996 11 20 25 12.2 60 75.3 57.1 23 18.2 55.3 0 15
1997 11 16 37.1 21 60.2 85.2 55.6 27 30.7 57.9 10.2 26.1
1998 10 0.2 1 0 42.7 36.1 62.7 20 21.2 81.9 87.5 27.1
1999 53 10 86.3 63.7 30.1 26.2 14.2 98 57.5 108.3 134.7 23.3
2000 12 10 27.3 17.6 35.2 36 20 35 38.3 69.7 60.2 87.1
2001 15 6 6.1 12.5 26.1 30 23.6 43 23 55.6 122.5 30.5
2002 37 95 15.2 3.8 19.1 59.2 87.2 44 14.1 43.1 31.6 10.1
2003 21 12 3 9 10 31 63 25 26 97 23 38
2005 5 9 33 5 46.3 77 26.3 52 16.3 16.3 19.6 63.3
2006 3 0 0 15.1 111.5 46.3 23.8 10 36.2 25.3 58.6 23.6
2007 62 11 14.6 7.2 121.3 76.1 23.2 10 21.6 34.3 67.9 20.3
2008 62 22 72.6 93.2 96.3 75.7 23.9 17 61.8 58.1 87.6 66.4
89.3 89 289 12 67 33 47 97 62 51 26 12 57
2010 52 3 9 8 32 31 23 41 24 33 20 28
2011 67 62 48 7 87 72 75 27 36 27 83 215
2012 35 20 44 59 13 29 35 58 37 21 30 315
2013 42 41 27 20 21 25 35 26 22 68 66 20
2014 79 32 183 23 165 47 38 23 86 87 65 98
2015 32 28 0 2 24 50 48 53 34 21 25 36
2016 16 2 0 0 27 76 19 38 41 52 104 26
2017 102 28 33 29 39 32 43 57 68 30 38 105
2018 68 61 22 54 22 46 15 38 43 41 26 18
2019 32 1 27 3 14 22 38 43 32 35 20 32
2020 13 21 53 0 59 42 70 31 41 91 38 168
APPENDIX G

Maximum Values of Rainfall


MAXIMUM VALUES OF RAINFALL

DATE DEPTH
MONTH YEAR (mm)
OCT 1980 80.3
SEPT 1981 101.2
OCT 1982 70.8
SEPT 1983 150
OCT 1984 201.2
APR 1985 210
AUG 1986 88.9
AUG 1987 120.3
OCT 1988 68.1
MAY 1989 67.6
JUN 1990 47.5
NOV 1991 132.5
NOV 1992 67.2
DEC 1993 126.3
AUG 1994 53.2
MAY 1995 80.2
JUN 1996 75.3
JUN 1997 85.2
OCT 1998 87.5
NOV 1999 134.7
DEC 2000 87.1
NOV 2001 122.5
FEB 2002 95.2
OCT 2003 97.4
JUN 2005 77
MAY 2006 111.5
MAY 2007 121.3
MAY 2008 96.3
FEB 2009 289.3
JAN 2010 52.2
DEC 2011 215.1
DEC 2012 315.2
OCT 2013 68.2
MAR 2014 183.2
AUG 2015 52.6
NOV 2016 103.5
DEC 2017 105.2
JAN 2018 68.2
AUG 2019 42.6
DEC 2020 168.1
∑X = 4351.6
APPENDIX H
Soil Texture Classification
(Using USDA)
MAP DETAIL ON AREA TYPE SURFACES

ZONE A ZONE B

ZONE C ZONE D
ZONE A

Soil Soil Soil Height Percent Total


Soil Classification
Sample Type (mm) (%) (%)

Sand 97 77.6
A Silt 23 18.4 100 LOAMY SAND
Clay 5 4
ZONE B

Soil Soil Soil Height Percent Total


Soil Classification
Sample Type (mm) (%) (%)

Sand 40 45.5
B Silt 20 22.7 100 SANDY CLAY LOAM
Clay 28 31.8
ZONE C

Soil Soil Soil Height Percent Total


Soil Classification
Sample Type (mm) (%) (%)

Sand 47 47.9
C Silt 38 38.8 100 LOAM
Clay 13 13.3
ZONE D

Soil Soil Soil Height Percent Total


Soil Classification
Sample Type (mm) (%) (%)

Sand 94 75.2
D Silt 23 18.4 100 SANDY LOAM
Clay 8 6.4
APPENDIX I

Summary of Results
DESIGN CANAL ELEMENTS TABULATIONS

Actual New
Width, Depth,
LINE Q (m3/s) n S Velocity R Velocity
b(m) y(m)
(m/s) (m/s)
1 0.55 0.013 0.002 1 0.7 1.340733 NG 1.714637
2 0.8010054 0.013 0.002 1 0.75 1.472857 NG 1.751237
3 0.9386318 0.013 0.002 1 0.8 1.532412 NG 1.784629
4 1.220506 0.013 0.002 1 1 1.636389 NG 1.89329
INLETS
ZONE A 0.5496351 0.013 0.002 1 0.7 1.340733 NG 1.714637
ZONE B 0.2513703 0.013 0.002 0.5 0.5 1.102377 NG 1.166257
ZONE C 0.1376264 0.013 0.002 0.5 0.5 0.948259 NG 1.166257
ZONE D 0.2818741 0.013 0.002 0.5 0.5 1.134398 NG 1.166257

OUTFALL 1.220506 0.013 0.002 1 1 1.636389 NG 1.89329

CROSS - SECTIONAL AREAS TABULATION

Variable, Y (y +
LINE b(m) B(m) y(m) A(m2) Freeboard(m)
freeboard) (m)

1 1 1.5 0.7 0.875 0.3 1


2 1 1.5 0.75 0.9375 0.3 1.1
3 1 1.5 0.8 1 0.3 1.1
4 1 1.5 1 1.25 0.3 1.3
INLETS
ZONE A 1 1.5 0.7 0.875 0.3 1
ZONE B 0.5 0.7 0.5 0.3 0.3 0.8
ZONE C 0.5 0.7 0.5 0.3 0.3 0.8
ZONE D 0.5 0.7 0.5 0.3 0.3 0.8
OUTFALL
OUTLET 1 1.5 1 1.25 0.3 1.3
APPENDIX J

Runoff Coefficient Computations and Tabulations


Sub – Catchments Runoff Coefficient Tabulations
Runoff Composite
Type of Area Ci x �� � ��
Zone Location Classifications Coef A �= �
Surfaces (m^2)
(Ci)
Sandy soil with
1 With Crop 0.25 7881
Crop 1970
Sandy soil with
A 2 No Crops 0.4 9734
no Crop 3893
with 0.367
Road Drives and
18741.8 3 0.85 510
Shoulder walks 433
sq.m
Asphalt and
4 concrete road 0.95 618
Concrete 587
Total 6884
Sandy soil with
1 With Crop 0.25 13050
Crop 3262
B
Road Drives and
with 2 0.85 221 0.273
Shoulder walks 188
13522.5
sq.m Asphalt and
3 concrete road 0.95 251
Concrete 239
Total 3689
Pasture-Sandy
1 With Grasses 0.25 6595
Soil 1649
C
Road Drives and
with 2 0.85 191 0.288
Shoulder walks 162
7006.09
sq.m Asphalt and
3 concrete road 0.95 220
Concrete 209
Total 2020
Pasture-Sandy
1 With Grasses 0.25 9158
D Soil 2290
with Road Drives and
2 0.85 648 0.335
10532.4 Shoulder walks 551
sq.m Asphalt and
3 concrete road 0.95 726
Concrete 690
Total 3530

Note: Location details shown in Appendix H.


APPENDIX K

Time of Concentration Tabulations


Overland Flow (Kerby Equations)

Sub- Most Remote


Elev. 1 Elev. 2 H S N Tov
Catchments Point L

Zone A 185.2 9.5 8.5 1 0.0054 0.2 15.258


4.7 - - - 0.03 0.02 0.626
TOTAL 15.884
Zone B 196.5 8 7 1 0.00509 0.4 21.985
4.7 - - - 0.03 0.02 0.626
TOTAL 22.611
Zone C 140.7 8.25 8 0.25 0.00178 0.4 24.087
4.7 - - - 0.03 0.02 0.626
TOTAL 24.712
Zone D 145 8.25 7.4 1.1 0.00759 0.25 13.945
4.7 - - - 0.03 0.02 0.626
TOTAL 14.571

Channel Flow (Kirpich Equations)

Sub-Catchments Line L S Tch

1 118.6 0.002 3.37476289


2 157.5 0.002 4.19859597
3 75.9 0.002 2.39322881
4 215.5 0.002 5.34505841

Time of Concentrations

Sub - Catchments Tov Tch Tc (min)

Zone A 15.883607 3.3747629 20.0


Zone B 22.611011 4.198596 30.0
Zone C 24.712477 2.3932288 30.0
Zone D 14.571 5.3450584 20.0
APPENDIX L

Peak Flow Tabulations


Maximum Discharge Tabulations

Effective Run- Rainfall Peak


Watershed
ZONE off Coefficient Intensity (i), Discharge ∑Q(m3/s)
Area (A),m2
(C) mm/min Q, m3/s
A1 4.8 7880.9 0.231
0.367
A2 4.8 9733.6 0.285
0.55
A3 4.8 509.6 0.015
A4 4.8 617.7 0.018
B1 0.273 4.1 13049.9 0.243
B2 4.1 221.4 0.004 0.251
B3 4.1 251.1 0.005
C1 0.288 4.1 6595.4 0.130
C2 4.1 190.9 0.004 0.138
C3 4.1 219.8 0.004
D1 0.335 4.8 9158.2 0.245
D2 4.8 648.0 0.017 0.282
D3 4.8 726.1 0.019

Design Flow Tabulations

Elevation @ Elevation @
ZONE L (m) Peak Discharge Q, m3/s
1 2
Inlet 0.5 - - 0.55
A
Line 1 118.6 7.3 7.06 0.55
Inlet 0.5 - - 0.251
B
Line 2 157.5 6.96 6.65 0.801
Inlet 0.5 - - 0.138
C
Line 3 75.9 6.65 6.5 0.939
Inlet 0.5 - - 0.282
D Line 4 215.5 6.3 5.9 1.221
Outlet 0.5 - - 1.221

Design Flow in Drainage System


APPENDIX M
Designed Discharge Computations
SUB - CATCHMENT A
Channel:
��ℎ = 0.0078�0.770�−0.385

Tch = 0.0078 X 118.60.770 X 0.002-0.385


= 3.3748 min
Land:
��� = 0.828(��)0.467 �−0.235

Tch = 0.828 X (185.2 x 0.2 )0.467 X 0.0054-0.235


= 15.258 min
Road:
Tch = 0.828 X (4.7 x 0.02 )0.467 X 0.03-0.235
= 0.626 min
Time of Concentration
Tc = Tov + Tch = 3.375 + 15.26+ 0.626
= 19.26 say 20 min ; i= 4.8 mm/min
Computing Maximum Discharge ; C= 0.367
A1: A= 7881 m 2

Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 7881
= 0.23139 m3/s
A2: A= 9734 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 9734
= 0.28545 m3/s
A3: A= 510 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 510
= 0.01495 m3/s
A4: A= 618 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 618
= 0.01811 m3/s

Therefore: Q inletA = 0.2314 + 0.2855 + 0.0149 + 0.0181


= 0.55 m3/s
Q LINE 1 = Q inletA 0.55 m3/s
=

SUB - CATCHMENT B

Channel:
��ℎ = 0.0078�0.770 �−0.385

Tch = 0.0078 X 157.50.770 X 0.002-0.385


= 4.1986 min
Land:
��� = 0.828(��)0.467�−0.235

Tch = 0.828 X (196.2 x 0.4 )0.467 X 0.0051-0.235


= 21.985 min
Road:
Tch = 0.828 X (4.7 x 0.02 )0.467 X 0.03-0.235
= 0.626 min

Time of Concentration
Tc = Tov + Tch = 4.1986 + 21.985 + 0.626
= 26.81 say 30 min ; i= 4.1mm/min
C = 0.27282

Computing Maximum Discharge;


A= 13050 m2
B1:
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 13050
= 0.24259 m3/s
B2: A= 221 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 221
= 0.00412 m3/s
B3: A= 251 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 510
= 0.00467 m3/s
SUB - CATCHMENT C

Channel:
��ℎ = 0.0078�0.770�−0.385

Tch = 0.0078 X 75.90.770 X 0.002-0.385


= 2.393 min
Land:
��� = 0.828(��)0.467 �−0.235

Tch = 0.828 X (140.7 x 0.4 )0.467 X 0.0018-0.235


= 24.087 min
Road:
Tch = 0.828 X (4.7 x 0.02 )0.467 X 0.03-0.235
= 0.626 min

Time of Concentration
Tc = Tov + Tch
= 27.11 say 30 min ; i= 4.1 mm/min

Computing Maximum Discharge C= 0.2883


C1: A= 6595 m 2

Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 6595
= 0.1295 m3/s
C2: A= 191 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 191
= 0.0037 m3/s
C3: A= 220 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 220
= 0.0043 m3/s

Therefore: Q inletC = 0.1296 + 0.0037 + 0.0043


= 0.14 m3/s
Q LINE 3 = Q LINE 2 + Q inletC = 0.939 m3/s
SUB - CATCHMENT D

Channel:
��ℎ = 0.0078�0.770�−0.385

Tch = 0.0078 X 215.50.770 X 0.002-0.385


= 5.345 min
Land:
��� = 0.828(��)0.467 �−0.235

Tch = 0.828 X (145x 0.4 )0.467 X 0.00759-0.235


= 13.945 min
Road:
Tch = 0.828 X (4.7 x 0.02 )0.467 X 0.03-0.235
= 0.626 min

Time of Concentration
Tc = Tov + Tch
= 19.92 say 20 min ; i= 4.8 mm/min
C= 0.3351
8
Computing Maximum Discharge
D1: A= 9158 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 9158
= 0.2451 m3/s
D2: A= 648 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 648
= 0.0173 m3/s
4
D3: A= 726 m2
Q = CxixA
= 0.367 x 4.8 (1/1000)(1/60) x 726
= 0.0194 m3/s
3

Therefore Q inletD = 0.2451+0.0173+0.0194


:
= 0.28 m3/s
Q LINE 4 = Q LINE 3 + QinletD = 1.221 m3/s
Q outlet = Q LINE 4 = 1.221 m3/s

APPENDIX M
Cross – Section of Trapezoidal Canal
Computations
ZONE A

Q
INLET @ ZONE
A:

Given:
Q= 0.550 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.4866157
b= 1.554y = 0.756201

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.410223

Solving for actual velocity:


Vactual = Q/A = 1.340733

Design Cross - sectional Area:


b= 1
B= 1.5
y= 0.7

Solving for new Velocity:


x= 0.25 m= 0.357143

A= 0.875 P= 2.486607
1 2/3 1/2
�= � �
� = 1.714637 V > Vactual OK

LINE 1

Given:
Q= 0.550 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y=
0.4866157
b= 1.554y = 0.756201

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.410223

Solving for actual velocity:


Vactual = Q/A = 1.340733

Design Cross - sectional Area:


b= 1
B= 1.5
y= 0.7

Solving for new Velocity:


x= 0.25 m= 0.357143

A= 0.875 P= 2.486607
1 2/3 1/2
�= � �
� = 1.714637 V > Vactual OK
ZONE B

Q Q

INLET @ ZONE
B

Given:
Q= 0.251 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.3628005
b= 1.554y = 0.563792

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.228026

Solving for actual velocity:


Vactual = Q/A = 1.102377

Design Cross - sectional Area:


b= 0.5
B= 0.7
y= 0.5

Solving for new Velocity:


x= 0.1 m= 0.2
A= 0.3 P= 1.519804

1 2/3 1/2
�= � � = 1.166257 V > Vactual OK

LINE 2

Given:
Q= 0.801 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.5602906

b= 1.554y = 0.870692

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.543845

Solving for actual velocity:


Vactual = Q/A = 1.472857

Design Cross - sectional Area:


b= 1
B= 1.5
y= 0.75

Solving for new Velocity:


x= 0.25 m= 0.333333
A= 0.9375 P= 2.581139

1 2/3 1/2
�= � � = 1.751237 V > Vactual OK

ZONE C

Q Q

INLET @ ZONE
C

Given:
Q= 0.138 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.2894431
b= 1.554y = 0.449795

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.145136

Solving for actual velocity:


Vactual = Q/A = 0.948259

Design Cross - sectionalArea:


b= 0.5
B= 0.7
y= 0.5

Solving for new Velocity:


x= 0.1 m= 0.2
A= 0.3 P= 1.519804

1 2/3 1/2
�= � � = 1.166257 V > Vactual OK

LINE 3

Given:
Q= 0.939 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.5946149

b= 1.554y = 0.924032

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.612519

Solving for actual velocity:


Vactual = Q/A = 1.532412
Design Cross - sectional Area:
b= 1
B= 1.5
y= 0.8
Solving for new Velocity:
x= 0.25 m= 0.3125
A= 1 P= 2.676305

1 2/3 1/2
�= � � = 1.784629 V > Vactual OK

ZONE D

Q Q Q

INLET @ ZONE D:

Given:
Q= 0.282 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.3787222
b= 1.554y = 0.588534

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.248479

Solving for actual velocity:


Vactual = Q/A = 1.134398

Design Cross - sectional Area:


b= 0.5
B= 0.7
y= 0.5
Solving for new Velocity:
x= 0.1 m= 0.2
A= 0.3 P= 1.519804

1 2/3 1/2
�= � � = 1.166257 V > Vactual OK

LINE 4
Given:
Q= 1.221 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.656149
b= 1.554y = 1.01966

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.74585

Solving for actual velocity:


Vactual = Q/A = 1.63639

Design Cross - sectional


Area:
b= 1
B= 1.5
y= 1

Solving for new Velocity:


x= 0.25 m= 0.25
A= 1.25 P= 3.06155

1 2/3 1/2
�= � � = 1.89329 V > Vactual OK

OUTFALL
Given:
Q= 1.221 m3/s
n= 0.013
S= 0.002
��
�8/3 = 2 1
1
1.7324 � ( )3 � �2
2

y = 0.656149

b= 1.554y = 1.01966

Solving for actual Area m2:


Aactual= 1.7324y2 = 0.74585

Solving for actual velocity (m3/s):


Vactual = Q/A = 1.63639

Design Cross - sectional Area (m)


b= 1
B= 1.5
y= 1

Solving for new Velocity (m3/s):


x= 0.25 m= 0.25
A= 1.25 P= 3.06155
1 2/3 1/2
�= � �

= 1.89329 OK
APPENDIX N
Land – Road Elevation Computations
Road – Land Elevation

Road Elev = Land Elevation + Measurements

Land Elevation – Topographic Map


Measurements – Results through land survey

DISTANCE Km Land Elevation Measurements(m) Road Elev(m)

0.5675 7.5 1.5 9.00


0.5475 7.4 1.2 8.60
0.5275 7.3 0.9 8.20
0.5075 7.2 0.5 7.70
0.4875 7.1 0.6 7.70
0.4675 7 0.9 7.90
0.4475 7 1 8.00
0.4275 7.2 0.8 8.00
0.4075 7.4 0.8 8.20
0.3875 7.6 0.7 8.30
0.3675 7.6 0.8 8.40
0.3475 7.7 0.8 8.50
0.3275 7.8 0.7 8.50
0.3075 7.9 0.6 8.50
0.2875 8 0.4 8.40
0.2675 8 0.2 8.20
0.2475 8 0 8.00
0.2275 7.9 -0.1 7.80
0.2075 7.9 -0.3 7.60
0.1875 7.9 -0.5 7.40
0.1675 7.7 -0.4 7.30
0.1475 7.5 -0.3 7.20
0.1275 7.3 -0.3 7.00
0.1075 7.4 -0.2 7.20
0.0875 7.6 -0.2 7.40
0.0675 7.4 0.2 7.60
0.0475 6.8 1.2 8.00
0.0275 6.4 2.06 8.46
0.0075 6.2 2.76 8.96
0.0000 At top road bridge to water surface of stream = 6m

Therefore: Based on road elevation detail, possible road bridge elevation is at 9m and stream
elevation is 3m.

APPENDIX O
Canal Profile
ZONE – A CANAL LAYOUT
ZONE – B CANAL LAYOUT

ZONE – C CANAL LAYOUT


ZONE – D CANAL LAYOUT

APPENDIX O
Documentations
(a) (b)
(c) (d)

(e) (f)

Conducted surveys through in-person interviews with the residents of Upper Napit-an,
Maninihon Bayawan City, Negros Oriental

(a) (b) (c)

Documented photo of existing drainage on the site.


(a) (b)

(c) (d)

This is the portion of possible route of the designed drainage system; (a) Zone A, (b) Zone B,
(c) Zone C & D and (d) drainage outlet.

Jar Method Process

(a) (b)
(c) (d)

Collecting of soil samples on Zone A, B, C and D.

(e)

Preparing sampled soil to place in Coca – cola bottle.

(f) (g) (h)

Filling samples inside the bottle (f), Shaking the bottle (g), and Storing the sampled soil and
wait for 24 hours to settle down the soil.
Measuring settled soil using ruler.
Soil total depth and particles are measured to get the percentage sand, sild and clay.
(a)
(b)

These are the letters that was address to CDRRMO for the request of (a) topographic map and (b)
proof of 40 years record - rainfall data in Bayawan City Negros Oriental.
Actual survey in the area of Upper Napit – an, Maninihon, Bayawan City using Real Time
Kinetics instrument (RTK).

APPENDIX P
RESEARCHERS’ VITAE
PERSONAL DATA

Name : Charlotte V. de La Torre


Date of Birth : June 7, 1999
Address : Poblacion, Bayawan
Contact Number : 0975-107-4841
Email Address : delatorrecharlotte0gmail.com

EDUCATIONAL BACKGROUND

Elementary : 2003 – 2009


Bayawan City East Central School
Bayawan, Negros Oriental
Secondary : 2009 – 2014
St. Augustine Academy of Bayawan Inc.
Bayawan, Negros Oriental
Tertiary : 2015 – 2022
Negros Oriental State University
Dumaguete City, Negros Oriental
Graduate of Bachelor of Science in Civil Engineering

AFFILIATION

Member
 Philippine Institute of Civil Engineering (PICE) - NORSU Chapter
 Engineering and Architecture Student Society (EASS)
 American Concrete Institute (ACI) - NSC

TRAINAING/SEMINAR/WORKSHOP

 On – the – Job – Training (2021)


 Engr. Celestina O. Favor
University Engineer
Negros Oriental State University

PERSONAL DATA

Name : Brizts Bryan Eranes


Date of Birth : August 4, 1998
Address : Mabinay, Negros Oriental
Contact Number : 0905-649-6286
Email Address : briztsbryan@gmail.com

EDUCATIONAL BACKGROUND

Elementary : 2003 – 2009


Mabinay Central School
Mabinay, Negros Oriental
Secondary : 2009 – 2014
Mabinay National High School
Mabinay, Negros Oriental
Tertiary : 2015 – 2022
Negros Oriental State University
Dumaguete City, Negros Oriental
Graduate of Bachelor of Science in Civil Engineering

AFFILIATION

Member
 Philippine Institute of Civil Engineering (PICE) - NORSU Chapter
 Engineering and Architecture Student Society (EASS)
 American Concrete Institute (ACI) - NSC

TRAINAING/SEMINAR/WORKSHOP

 On – the – Job – Training (2021)


 Engr. Celestina O. Favor
University Engineer
Negros Oriental State University

PERSONAL DATA

Name : Mark M. Pastor


Date of Birth : November 4, 1997
Address : Bacong, Negros Oriental
Contact Number : 0997-0894-713
Email Address : pastormarkm1@gmail.com

EDUCATIONAL BACKGROUND

Elementary : 2003 – 2009


San Miguel Elementary School
Bacong, Negros Oriental
Secondary : 2009 – 2014
San Miguel High School
Bacong, Negros Oriental
Tertiary : 2015 – 2022
Negros Oriental State University
Dumaguete City, Negros Oriental
Graduate of Bachelor of Science in Civil Engineering

AFFILIATION

Member
 Philippine Institute of Civil Engineering (PICE) - NORSU Chapter
 Engineering and Architecture Student Society (EASS)
 American Concrete Institute (ACI) - NSC

TRAINAING/SEMINAR/WORKSHOP

 On – the – Job – Training (2021)


PHCCI Dumaguete Branch
Dumaguete City, Negros Oriental

You might also like