INSULATION (t=100 mm)
A DETAIL DESIGN FOR ALL SUPPORTS AND STRUCTURE BY OTHERS A
-
WELDING PERFORMED AT SITE
A
DN600
1x COMPENSATOR DN600
WITH INNER SLEEVE, COUNTERFLANGE,
GASKETS, SCREWS AND NUTS
* -
-
-
ALL HOLES DRILLED AT SITE
ADDITIONAL SUPPORTS REQUIRED DURING ERECTION
- LENGTH OF PIPES AND MATERIAL ADAPTED AT SITE
(3583)
(1083)
0
613 **
7061 **
6617 **
D D
AL
O P OS
E P R E
ENGINE CRANKSHAFT AXIS
2183
F F
1207
G G
- APPROV. 14.05.2020 J. Schulze PROJECT-NO. 272 009
WELD DESIGN WELDING SEAM CONSTRUCTION
- CHECK. 14.05.2020 H. Peters
a = 4 mm
- DRAWN 13.05.2020 T. BOSS
NIMAC GOLD MINE
Welding process DIN EN ISO 4063 / 135 PIPE
s
FLANGE
a PIPE
- DATE NAME 1 x 8CM25C / NICARAGUA
Quality assessment of welded joints DIN EN ISO 25817 / C -
COPYRIGHT BY:
SCALE 1:50 A2
a