0A15 Project's Risk Register
0A15 Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
1 Legal / Contractual
VH
Legal / Contractual
H X
Probability
Failure to study M
Parties accepted advanced scan copy as
Threat
Delay in contract and reach Time/ The
1.1 High High High L Mitigate an official document during preparation
signature contractual terms Cost Contractor
of hard copies awareness sessions
on time VL
VL L M H VH
Impact
VH
Legal / Contractual
H X
Probability
Misunderstand of M
Failure to carryout
Threat
contract terms and Time/ Assigning a Contract Administrator The
1.2 contractual High High High L Mitigate
conditions by the Cost supported by contract department Contractor
obligations
parties VL
VL L M H VH
Impact
2 Engineering
VH
H X
Probability
Engineering
M
Engineering team
Threat
VL L M H VH
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
VH
H X
Probability
Engineering
M
Delay in The long duration
Threat
Time/ Several meetings took places to secure The
2.2 Stakeholders’ of the Approval High High High L Mitigate
Cost the approval in a shorter time Contractor
Approvals Cycle VL
VL L M H VH
Impact
VH
H X
Probability
Engineering
M
Design doesn’t Shortage in Design
Threat
Time/ RFIs has been sent to secure the The
2.3 meet the Client’s provided High High High L Mitigate
Cost information by the owner Contractor
requirements Information VL
VL L M H VH
Impact
VH
H X
Probability
Engineering
M
Defects in the
Threat
Rush in design Time/ A third party has been hired as a design engineering
2.4 Design Final High High High L Mitigate
preparation Cost of record department
Quality VL
VL L M H VH
Impact
VH
H X
Probability
Engineering
Challaning design M
Failure in A third part designer already has been
Threat
VL L M H VH
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
3 Supply chain
VH
H X
Probability
Supply chain
Threat
Delay in project’s Delay in delivering Time/ Early Procurement shall take place to procurement
3.1 High High High L Mitigate
Procurement Cycle the long lead items Cost avoid any delays dep.
VL
VL L M H VH
Impact
VH
Probability
Supply chain
M X
Threat
Delay in project’s Purchase from Time/ Mitigate/ Alternative local suppliers with the same procurement
3.2 Medium High Medium L
Procurement Cycle overseas suppliers Cost Transfer quality to be submitted for approvals dep.
VL
VL L M H VH
Impact
VH
H X
Probability
Supply chain
M
Suppliers
Threat
VL L M H VH
Impact
VH
H
Delay in the
Probability
Supply chain
procurement M X
Threat
Delay in Material process and long Time/ Mitigate/ Creating a contingency reserve and early procurement
3.4 Medium High Medium L
Delivery duration of Cost Transfer procurement of the manufactured items dep.
supplier’s work VL
cycle VL L M H VH
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
VH
H X
Probability
Supply chain
Subcontracting M
Defining each subcontractors scope on
Threat
Rejected Concrete two different Time/
3.5 High High High L avoid site and monitoring the quality of the site team
Pouring Samples suppliers for Cost
supplied sample tests by the QC
concrete VL
VL L M H VH
Impact
VH
Waterproofing H
Probability
Supply chain
System in the
Failure in M X
Specs is Request to change it and submitting
Threat
Procuring the Time/ Mitigate/ project
3.6 Complicated, rare, Medium High Medium L alternatives to the Consultant for
Waterproofing Cost Transfer management
expensive and not Approval
System VL
available in Saudi
Arabia VL L M H VH
Impact
VH
Probability
Supply chain
Loss of Unqualified M X
Threat
productivity in subcontractors and Time/ Mitigate/ Avoid sole selection criteria and creating
3.7 Medium High Medium L site team
Subcontracted failure in the Cost Transfer a backup Procurement Strategy
Works selection criteria VL
VL L M H VH
Impact
4 Stakeholders
VH
H X
Probability
Stakeholders
Miscommunication
Engagement M
with Security
Threat
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
VH
H X
Client's difficulties
Probability
Stakeholders
elaborating the M
Failure in Hiring Eng. Abd El Aziz Rabia, to
Threat
Contractor’s The
4.2 Communicating Time High Medium High L Mitigate communicate with them and reach
Queries. Thus, Contractor
with MODON conclusions concerning the misconceptions
there were VL
misconceptions VL L M H VH
Impact
VH
Delay in the H X
Probability
Stakeholders
Approval cycle
M
Failure to obtain and change in the
Threat
Early Approach and finding alternative project
4.3 SFDA and CD requirements, Time High Medium High L Mitigate
communication channels management
approvals hard VL
communication
and reach VL L M H VH
Impact
5 Operation
VH
H X
Probability
Operation
Impact
VH
H X
Probability
Operation
VL L M H VH
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
VH
H X
Probability
The Client wasn’t
Operation
M
Work rejection at clear and precise Using Interactive Communication Tools
Threat
Time/ project
5.3 the End of the with their requests High High High L Mitigate and Updating the Client with work
Cost management
Process and demands VL
status using daily updated photos on site
from the beginning
VL L M H VH
Impact
VH
H X
Due to work load
Probability
Operation
Threat
Equipment Work maintenance and Time/ maintain the equipment periodically and logistic
5.4 High High High L Mitigate
Failure long duration to Cost coordinating with the logistics department
replace damaged VL department
equipment VL L M H VH
Impact
VH
H X
Probability
Operation
M
Unqualified
Threat
VL L M H VH
Impact
VH
H X
Technical issues
Probability
Operation
the drawings VL L M H VH
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
VH
H X
Probability
Operation
Threat
Due to specific or Time/ Using time contingency and buffer while
5.7 Work Suspension High High High L active acceptance site team
particular events Cost creating the baseline
VL
VL L M H VH
Impact
VH
H X
Probability
Operation
Threat
Time/ safety and contingency measures beside The
5.8 Work Suspension wave of Corona High High High L Mitigate
Cost Following Prevention, security and safety Contractor
Pandemic VL instructions
VL L M H VH
Impact
VH
H X
Probability
Filled atmosphere
Operation
M
with paint dust
Threat
Impact
VH
Delay in obtaining
H X
approvals,
Probability
Operation
coordination M
Threat
Delay in Work before concrete Time/ Early Approach for approvals and
5.10 High High High L Mitigate site team
Progress pouring and Cost coordination to avoid delays
coordination with VL
existing VL L M H VH
infrastructure
Impact
VH
workman sheet
Operation
M
might be poor, Hiring qualified labors and Setting out
Threat
Impact
Project
Name Project's Risk Register
Main Response
# Risk Category Risk Event Causes T/O Probability Impact Severity Risk Matrix Response Actions Owner
Impacts Strategy
6 Financial
VH
Probability
Financial
M
Delay in invoices Contractual Agreement , Accuracy in
Threat
6.1 Cash Flow Failure payments and Cost Low Medium Medium L X Mitigate creating a cost baseline and assigning control dep.
approval cycle VL
management reserve
VL L M H VH
Impact
After the Risk assessment and Study, The Contracts & Risk Department recommendation regarding the project Risk is to evaluate the Risk reserve to be % from the Net direct Cost.