Project:  
TAMBAK LOROK COMBINED CYCLE 
POWER PLANT BLOCK 3 PROJECT 
WITH NET DEPENDABLE CAPACITY OF 600 – 850 MW. 
SEMARANG – CENTRAL JAVA
Subject:  P&ID DEMIN. WATER SUPPLY SYSTEM

Issue Purpose:  Responsible Dept.:
RFC M
Originator: 

Originator Document no:  Document Status: Originator Rev:  0


1GP013162 Released
Project Document No.: Rev:  Sheet.:

TBL/31/E/GHC-----EN/FD/001 0 0/2

Issue date:  2020-05-15

Information Class, if applicable, on pg. 1 et sqq


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

A A

31GDK52
BR001 DN50-TE01-N-

A01
DN50 -TE01-N- 31GDK52BR001
1GP013162.002
TBL/31/E/GHC-----EN/FD/001
DN 50
TP-GB-DW-003 SORF
CL150
A182 F316

M B
B B
NOTE 2

DN50 -TE01-N-
31GHC70
BR001
31GHC70
BR201

31GHC70

31GHC70
DN25 -TE01-N-

AA252

AA201
(NOTE 3)
31GHC70
C C
BR252 31GHC70
DN25 -TE01-N- BR202
FROM WTP
DN25 -TE01-N-

31GHC70
AA202
DN 50
SORF
CL150
A182F316

TP-BM-DW-023 N7
TP-BM-DW-016 DEMINERALIZED WATER DISTRIBUTION
N8
FOR DETAILS REFER
DN 100 TBL/30/E/GHC----BV44/FD/001
SORF
CL150
A 182 F316
D D

31GHC10BB001

DEMINERALIZED WATER STORAGE


TP-MB-DW-015

A 182 F316
DN 300

CL150
SORF

DN25 -TE01-N- 31GHC40


AA252
N5c

DN25 -TE01-N- 31GDK40


LCP

AA251
31GHC50 M DEMIN WATER
BR202 DN 50 POST-TREATMENT SYSTEM
DN25 -TE01-N- REFER NOTE : 2 SORF TP-BG-DW-001 ULTRA PURE WATER PRODUCTION
E CL150 E

31GHC40
31GDK01

31GDK40
FOR DETAILS REFER:

BR252
A182 F316

BR251
M B GH001A. TBL/31/E/LCP----ED11/EA/001
31GHC50

TBL/31/E/GHC-----EN/FD/001
AA228

31GHC60

31GHC40 TP-GO-UPW-001 31GDK40 1GP013162.002


AA001
31GHC60

HG

BR001 TP-GO-UPW-005 BR001 31GDK40BR001


AA251

31GDK01

D01
T1
M DN50 -TE01-N- DN 50 T5 DN50 -TE01-N- DN50-TE01-N-
WNRF

DN25 -TE01-N-

31GHC40 DN25 -TE01-N-

31GDK40 DN25 -TE01-N-


DN 50 TO ULTRAPURE WATER

TP-GO-UPW-008
DN300-TE01-N-

31GHC40

31GHC40
SS 316

31GDK40
WNRF

BR201

BR202

BR201
STORAGE AND DISTRIBUTION
DN25-TE01-N-

31GHC60

CL150
BR001
31GHC60

LV-MCC
BR251

SS 316
NOTES:

SS 316
WNRF
CL150
DN 50
AA202

AA201
31GHC40
1. REQUIRED MINIMUM STRAIGHT RUN OF PIPE OF 20 DIAMETER UPSTREAM AND 10 DIAMETER

AA201

T8
31GDK01
NOTE 3 DOWNSTREAM OF FLOWMETER
GH001B

F 2. PIPE SUPPORT WELDING ONLY CAN BE PERFORMED BY TANK'S SUPPLIER. F


DN25 -TE01-N- 31GHC50
DN50 -TE01-N-

AA251
31GHC60

DN50-TE01-N-
BR201

3. EQUIPMENT AND PIPING ARE LOCATED ON MC's AREA. ALL EQUIPMENT,

31GDK30
BR201
PIPING ,PIPE SUPPORTS, VALVES AND MISCELLANEOUS DEVICES
ARE PURCHASED AND PROVIDED BY GE. PIPE
31GHC50

ROUTING AND CIVIL DESIGN ARE UNDER B&V's SCOPE.


BR251
31GHC60
AA201

31GDK30
AA201
NOTE 3
REFERENCE DOCUMENTS:
LEGEND TBL/31/E/GHC-----EN/FD/002
DN100-TE01-N-

GRAPHICAL SYMBOLS FOR P&ID TBL/31/E/003b---001/RT/001


31GHC50

PIPE CLASS SELECTION LIST TBL/31/E/011b---001/GS/001


BR001

PIPE CLASS MANUAL TBL/31/E/011b---001/GS/141


GEN. SPEC. FOR THERMAL INSULATION TBL/31/E/011b---001/GS/110
G FOR EQUIPMENT & PIPING G
A 182 F316

SYSTEM DESCRIPTION TBL/31/E/GHC-----EN/DM/001


DN 100

CL150

PLANT SET POINT LIST TO BE CONFIRMED LATER


N4

FL

BY CONTROL TEAM
ED70 WSC EMERGENCY MAKEUP DESIGN OF PIPING TBL/31/E/GHC-----EN/LP/001
WATER PUMP SKID 31GHC50 OVERALL PIPING LIST TBL/31/E/011b---001/LP/001
2 x 50%
-TE01-N-

FOR DETAILS REFER :


31GHC08 DN25 -TE01-N-
PI

PI

31GHC08

TBL/31/E/GHC----ED70/FD/001
31GHC08

LIMIT OF SUPPLY:
BR252
BR251

RATED FLOW RATE: 150 + 30 m3/hr


DN25

RATED DISCHARGE PRESSURE: 3.7 barg TP-BG-DW-002 B = GE BALANCE OF PLANT


DN 200 B C C = CLIENT
SORF M B G = GE GAS TURBINE
M
31GHC08

DN 200
31GHC50 CL150
AA252

~ H = GE HEAT RECOVERY STEAM GENERATOR


AA251

FL A182 F316
AP001 CL150
TBL/31/E/GHC-----EN/FD/001
M = MARUBENI
A 182 F316 31GHC08 31GHC10 1GP013162.002 S = GE STEAM TURBINE
H N2
BR001 BR001 31GHC10BR001 H
L02

DN200-TE01-N- DN200 -TE01-N- DN200-TE01-N-


DN50 -TE01-N- 31GHC08

DN50 -TE01-N- 31GHC08

NOTE 3 TO CONDENSATE EMERGENCY


AA201

AA202

Revision History
MAKEUP
G
{RL4} 22
{RD4}
Jul 2019 C.Vikas
{CB4} U.
{CK4}
Stahl P.
{AP4}
MADASSERI 3.
{DS4}
Issue

F
{RL3} 17
{RD3}
May 2019 C.Vikas
{CB3} L.
{CK3}
Sachs P.
{AP3}
MADASSERI 3.
{DS3}
Issue
31GHC08

31GHC08
BR201

BR202

E
{RL2} 09
{RD2}
Apr 2019 B.
{CB2}
DUTTA U.
{CK2}
Stahl P.
{AP2}
MADASSERI 3.
{DS2}
Issue

D
{RL1} 04
{RD1}
Jan 2019 A.
{CB1}
PATNAIK U.
{CK1}
Stahl R.
{AP1}
Prasad 2.
{DS1}
Issue

A
{RL0} 09
{RD0}
Jul 2018 A.
{CB0}
PATNAIK U.
{CK0}
Stahl I.
{AP0}
Abdillah Revision
PI

PI

Rev. Revision Date Created by Checked by Approved by Description


Description Latest Revision :
{ODF}
0 RELEASED FOR CONSTRUCTION
{OL} {OD}
{ODL}

J J
N1 31GHC50 M
DN 300
AP002 ~
FL
CL150
A 182 F316
N3
DN 25

CL150
FL

A 182 F316
31GHC50 DN25-TE01-N-
31GHC50
BR201

NOTE 3
AA201

K K

L L
Cross checked
Department Name Date Signature
{CCD1} {CCN1} {CCDA1} {CCS1}

{CCD2} {CCN2} {CCDA2} {CCS2}

Main Contractor

Replaces Scale Document Code


TBL/31/E/GHC-----EN/FD/001
Responsible Dept. Created by Checked by Approved by Format
10 May 2020 C.Vikas {ODF1} {ODF2} A0
Originator Document Type Document Status
M M
Non-Public Piping and instrument diagram {ODF3}
© COPYRIGHT 2020 General Electric Company Document Title Identification Number
All rights reserved. The information herein is Proprietary and Technically Exclusive content that is solely owned by General Electric Company and/or its affiliates. Thus, it is being
provided with the explicit expectation of restricted and privileged use. All recipients of this information shall be deemed to have agreed not to make duplications, reproductions of P&ID DEMIN. WATER SUPPLY SYSTEM 1GP013162
any nature by any means, modifications, disclosures, or use any portion of this material; except as is expressly authorized in writing by the General Electric Company, and/or its Rev. Date Lang. Sheet
legitimate affiliates.
GE POWER 0 EN 1 /2
Please consider the environment before printing this document
PRINTED 2020-05-10 21:08:59
1 2 3 4 5 6 7 8 0 9 100 10 11 12 13 14 15 16 17
Released for Construction - set by V. Chandra on 13-Jul-20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
TP-GB-DW-001

B M
31GDK72 31GDK72
AA252 BR252

31GDK52
AUXILIARY

AA252
DN25 -TE01-N-
A 31GDK52 BOILER A
BR251 DN 50
DN25 -TE01-N- RF
CL150
A 182 F316L
TBL/31/E/GHC-----EN/FD/001
1GP013162.001 31GDK52
31GDK52BR001 BR001 31GDK79 TBL/00/E/BB---EP31/PD/001

B13
DN50-TE01-N- DN 40/DN 15
DN50 -TE01-N- BR001 31GDK79BR001
TO DEMIN WATER TANK DN15-TE01-N-
31GDK79 TO VFD FWP COOLER
BR201 31GDK78
31GDK79 DN15 -TE01-N- BR251
AA201 DN25 -TE01-N-

31GDK41
31GDK78 TBL/31/E/QUL-----EN/FD/001

AA252
31GDK78 AA251 1GP011705.001
BR001 31GDK78BR001

J02
DN25-TE01-N- DN25-TE01-N-
B TO WSC SAMPLING
B
31GDK78

DN25 -TE01-N-
BR202 SYSTEM

31GDK41
BR251
31GDK78 DN25 -TE01-N-
TBL/31/E/LFN-----EN/FD/001
31GDK76 AA202 1GP009308
BR001 31GDK76BR001

B01
N1
DN25 -TE01-N- DN25-TE01-N-
31GDK41 NOTE 2 DN 50 TO AMMONIA/OXYGEN
SORF 31GDK76
AA001 DOSING SYSTEM
CL150 BR201

31GDK72 DN25 -TE01-N-


SS 304

31GDK72
DN25 -TE01-N-

BR201
31GDK76
M B
AA201 TBL/31/E/LFN-----EN/FD/001
31GDK76 1GP009308
BR002 31GDK76BR002

D01
DN25 -TE01-N- DN25-TE01-N-

AA201
TO CAUSTIC SODA DOSING
31GDK76
C SYSTEM (PIPE THREAD) C
BR202
DN50 -TE01-N-

31GDK76 DN25 -TE01-N-


31GDK41

TBL/31/E/MAJ-----EN/FD/001
BR001

31LCP33 AA202 1GP009242


TI
BR002 31LCP33BR002

E01
31GDK10CT001
DN25 -TE01-N- DN25-TE01-N-
31GDK77 TO COND. EVACUATION

31GDK12
TBL/31/E/GHC-----EN/FD/001

AA252
31GDK10 BR251 SYSTEM 31GDK77
1GP013162.001
31GDK40BR001 31GDK10 DN15 -TE01-N- BR252
E13

ED75 STANDBY CONDENSATE


DN50-TE01-N- LT-1 BR301 LISA DN15 -TE01-N-
STORAGE TANK

DN25 -TE01-N-
FROM DEMIN WATER FOR DETAILS REFER: DN50 -TE01-N- 31GDK10CL001A

31GDK12

31GDK77

31GDK77
DN 80 31GDK10

BR251

AA251

AA252
DISTRIBUTION TBL-31-E-LCP---ED75-GA-001 31GDK10 AA301 TBL/31/E/MKF-----EN/FD/001
SORF 31GDK77
CL150 LT-2 BR302 LISA 1GP011968
NET CAPACITY 175 M3 BR002 31GDK77BR002
SS 304

A09
DN50 -TE01-N- 31GDK10 31GDK10CL001B
DN25 -TE01-N- DN25-TE01-N-
DN 200 N2a AA302
D DN 100
STATOR COOLING 31GDK77 D

DN 50/DN 25
DN 80 SORF WATER
SORF SORF CL150 HG 31GDK12 BR202
CL150 CL150 SS 304 N2b AA001 DN25 -TE01-N-
SS 304 SS 304 31GDK77

DN50 -TE01-N-
N3 31GDK77 AA202

31GDK72
31GDK11

BR001
N4 AA001 BR201
31GDK77 DN25 -TE01-N-
DN80-TE01-N-

N4 DN 25 AA201
31GDK11

31GDK72
ED11 WSC SERVICE MAKEUP
DN50 -TE01-N-

31GDK50
BR201

AA251
WATER PUMP SKID 31GDK50 RF
31GDK42

BR251
BR001

CL150 31GDK72
2 x 100%
SS 316L
31GDK10

PI

PI
BR251 DN15 -TE01-N-
FOR DETAILS REFER: TBL-31-E-LCP---ED11-FD-001
AA201

31GDK50
AA251
RATED FLOW RATE: 13.6 + 3.4 m3/hr DN25 -TE01-N- TBL/31/E/PA------EN/FD/001
RATED DISCHARGE PRESSURE: 5 barg 31GDK50 1GP008992.003
31GDK10 BR002 31GDK50BR002

H13
3|1|FD.054|002|228|O1[1] DN25-TE01-N-
BR201 DN25 -TE01-N-
DN100 -TE01-N- TO WB EVACUATION 31GDK50
E SYSTEM E
M BR201
31GDK50 DN25 -TE01-N-
TBL/31/E/PG------EN/FD/001
AA201 1GP009912.002
31PGF01BR001

B05
PIA
DN25-TE01-N-
31GDK70CP001 TO CCW SYSTEM
31GDK50 31GDK78
TBL/31/E/QUL-----EN/FD/001
1GP011705.002
AP001

31GDK70
DN20 -TE01-N- 31GDK70

31GDK70

AA252
BR002 31GDK78BR002

AA301

AA251

F02
DN15-TE01-N- DN15-TE01-N-
31GDK78
TO HOTWELL SAMPLING
BR201

DN25 -TE01-N-
DN25 -TE01-N-
31GDK70
DN15 -TE01-N-

DN80 -TE01-N-

31GDK70
31GDK78

BR301

31GDK70
FIC

BR252
31GDK12

BR251
BR001
31GDK71CF001 AA201

DN 80/DN 50
DN 50
RF TBL/31/E/LC------EN/FD/001
F CL150
31GDK71 1GP008659.001 F
31GDK11 31GDK30 31GDK70 BR001 31LCP31BR004

G01
N1 SS 316L
BR202 BR001 BR302 DN80 -TE01-N- DN50-TE01-N-
DN 80/DN 50

PI

PI
DN50 -TE01-N- DN80-TE01-N- DN 80 DN80 -TE01-N- 31GDK71 TO CONDENSATE MAKE UP
N2 DN 80/DN 50
RF

-TE01-N-

DN25 -TE01-N-
CF001

31GDK30

31GDK70
CL150
NOTE 1

BR202

BR201
SS 316L

DN25
31GDK11
AA202

31GDK30
AA252

31GDK70
AA201
G DN 25 31GDK60 G
RF
AP001
DN80 -TE01-N-

CL150
DN200 -TE01-N-

31GDK22
BR001

SS 316L N3
31GDK11
BR001

DN25-TE01-N-
31GDK32
BR201
31GDK42
BR201
DN25 -TE01-N-
DN25 -TE01-N- 31GDK42
AA251

DN 300/DN 200
31GDK42
AA201

PIA
31GDK42

31LCP70CP001
BR251

H ED11 WSC EMERGENCY MAKEUP H


WATER PUMP SKID 31LCP50
NOTE 2 2 x 50%

PI

PI
DN 300/DN 200

DN20 -TE01-N- 31LCP70

31LCP70
N1 FOR DETAILS REFER: TBL-31-E-LCP---ED11-FD-001

AA301

AA253
DN25 -TE01-N- 31LCP70
31LCP70

AA252
AA251
RATED FLOW RATE: 150 m3/hr
31GDK42 DN 50 RATED DISCHARGE PRESSURE: 5 barg
AA001 SORF

DN25 -TE01-N-
DN300 -TE01-N-

DN25 -TE01-N-
CL150

31LCP70

31LCP70
BR301
31GDK22

31GDK10

31LCP70

31LCP70
M

BR253
SS 304
BR021

BR251

BR252
AA251

DN 200
DN200 -TE01-N-

RF
31GDK21

M B CL150 TBL/31/E/LC------EN/FD/001
BR001

31LCP70 1GP008659.001
SS 316L
DN25 -TE01-N-

BR001 31LCP41BR004
31GDK22

J01
BR251

TI N2 DN200 -TE01-N- DN200-TE01-N-


31GDK20

DN50 -TE01-N-

DN50 -TE01-N-
31GDK20CT001 CONDENSER EMERGENCY

DN50 -TE01-N-
31LCP70

31LCP70
31LCP50 MAKEUP

31LCP70
BR201

BR202

BR203
ED75 STANDBY CONDENSATE DN 80 31GDK22
J STORAGE TANK SORF AP001 J
AA001
31GDK21

FOR DETAILS REFER: CL150


AA251

TBL-31-E-LCP---ED75-GA-001 SS 304 N2a

31LCP70

31LCP70

31LCP70
NET CAPACITY 175 M3

AA201

AA202
31GDK21

AA203
31GDK20 HG
LT-1 BR251
LISA BR301 N2b
DN 200 DN25 -TE01-N-
31GDK20CL001A 31GDK20 DN50 -TE01-N- SORF 31GDK21
AA301 DN 100 CL150 AA001 DN 350
31GDK20 SORF SS 304 RF
CL150 CL150
LISA BR302 LT-2
SS 304 SS 316L

PI

PI
N3 DN 300/DN 350
31GDK20CL001B 31GDK20 DN50-TE01-N-
DN 80
SORF
AA302 CL150 N1
N4
SS 304
DN80-TE01-N-

K K
31GDK21

M
BR201
31GDK20
AA201

31GDK20 31LCP60
BR201 DN 25 AP001
DN100 -TE01-N- RF
CL150
SS 316L
N3
TBL/31/E/GHC-----EN/FD/001 M
1GP013162.001 ~ FIP
31GHC10BR001
H08

DN25-TE01-N-

L DN200-TE01-N- L
31GHC10 31GHC10
31LCP12

FROM DEMIN WATER


BR201

AA001 AA252
TANK
31GHC13

DN25 -TE01-N- 31GHC13

DN25 -TE01-N- 31GHC13


AA001

AA251

AA252

Main Contractor
31GHC13

31GHC13
BR251

BR252

TBL/31/E/MBA-----EN/FD/001
31GHC13 1GP014127
BR001 31GHC13BR001 Scale Document Code
D04

Replaces
DN80-TE01-N- DN80-TE01-N- TBL/31/E/GHC-----EN/FD/001
DN25 -TE01-N-

DN25 -TE01-N-

TO GT WATER WASH Responsible Dept. Created by Checked by Approved by Format


31GHC13
31GHC13

10 May 2020 C.Vikas {ODF2} A0


BR202

{ODF1}
BR201

31GHC13 31GHC13 Originator Document Type Document Status


M M
AA201 AA202 Piping and instrument diagram {ODF3}
Document Title Identification Number
P&ID DEMIN. WATER SUPPLY SYSTEM 1GP013162
Non-Public
© COPYRIGHT 2020 General Electric Company Rev. Date Lang. Sheet
All rights reserved. The information herein is Proprietary and Technically Exclusive content of the General Electric Company and/or its legitimate affiliates. GE POWER 0 EN 2 /2
Please consider the environment before printing this document
PRINTED 2020-05-10 21:09:07
1 2 3 4 5 6 7 8 0 9 100 10 11 12 13 14 15 16 17
Released for Construction - set by V. Chandra on 13-Jul-20