You are on page 1of 15

Culculation of Cross Drainage Structure

CD21
Description Symbol Unit
Design Data
Width of tube B m 4.00
Heightof tube H m 3.00
Rows of tube N Nr 4 17.20
Req.discharge Q ㎥/s 105.00 10.87
Length of tube
Roughness L m 6.0 21.74
coefficient n 0.015 32.61
Velocity in canal V m 1.50
Full drain depth at Inlet of culvert Hu m 2.33
Calculation 1
Friction loss due to length of tube h0 m 0.010 2
Flow Area ω ㎡ 9.320 3
Wetted perimeter χ m 8.660 4
Hydraulic Radius
Exponential R m 1.076 5
Chezy coefficient y 0.16 6
C m0.5/s 67.448 7
Velocity in tube υ m/s 2.821 8
Design discharge Qdis ㎥/s 105.153
Eetry loss h1 m 0.203
Outlet loss h2 m 0.291
Total loss h m 0.503
Difference of discharge ΔQ ㎥/s -0.153

*Case of arrangement to River bed


Dis. Bed
Req. Rou. F.S.D F.B Slope width
CDs m3/s Coef. m m m
CD21 105.00 0.0350 5.85 1.50 12651.0 38.94

7.353
n 2V 2
S f = 4/3
Rh
0.0001258

84 0.84
84

0.02 6 0.12 120

Side Flow Wetted Hyd. Chezy Flow Dis. Diffe


slope area perimeter radius Expon coef. velocity Des. rence
ential
m2 m m m0.5/s m/s m3/s m3/s
1.50 279.31 60.04 4.65 0.17 36.92 0.71 197.72 92.717
V2
Sf = f
8 gRh

P
B/D m
6.65 48.673
붉은색은 계산서에서 끌어오거나 설계자가 정하는값
RW Width of Road m, m1 Side Slope of Main canal or Drain canal
n Rows of Tube t Thickness of Tube

Main Canal U
CH
on MC CBL FSL TBL BW TBW1 TBW2 m RW U/S CBL U/S FDL
No CDs m m m m m m m m m m m
1 CD12 33505 467.768 471.472 472.972 43.65 5.00 8.00 1.50 12.00 465.168 #NAME?
2 CD13 34451 467.673 471.378 472.878 43.65 5.00 8.00 1.50 12.00 465.523 #NAME?
3 CD14 35314 467.588 471.291 472.791 43.65 5.00 8.00 1.50 12.00 465.338 #NAME?
4 CD15 37241 467.403 471.099 472.599 43.65 5.00 8.00 1.50 12.00 465.123 #NAME?
5 CD16 40286 467.126 470.794 472.294 43.65 5.00 8.00 1.50 12.00 464.916 #NAME?
6 CD17 43133 466.361 470.009 471.509 43.20 5.00 8.00 1.50 12.00 464.001 #NAME?
7 CD18 44449 466.229 469.878 471.378 43.20 5.00 8.00 1.50 12.00 464.789 #NAME?
8 CD19 48972 465.777 469.425 470.925 43.20 5.00 8.00 1.50 12.00 464.307 #NAME?
9 CD20 51267 465.647 469.196 470.696 42.85 5.00 8.00 1.50 12.00 463.177 #NAME?
10 CD21 56148 465.159 468.708 470.208 42.85 5.00 8.00 1.50 12.00 461.979 467.832

Note; Modified CD12,13


Z Up Stream CBL - Down Stream CBL
n1 Number of Joint

Dimension of Cross Drainage Structures


Up Stream Tube
Nr of
U/S TBL m1 H H1 L1 D1 BW1 B1 B2 W1 b h t pipe l L
m m m m m m m m m m m Nr m m
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 15.00 105.00
#NAME? 1.50 ### ### ### ### ### ### ### ### ### ### 0.25 ### 15.00 105.00
469.332 1.50 5.85 7.35 7.00 8.85 38.94 16.75 33.46 11.03 4.00 3.00 0.25 4 15.00 105.00
Tube Down Stream
Nr of
joint h1 b1 b2 h2 b3 Z D/S CBL D/S FSL D/S TBL L2 m1 H2 D2 B3 W2
Nr m m m m m m m m m m m m m m
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 3.50 17.25 17.65 4.50 18.05 0.50 461.476 467.329 468.829 14.00 1.50 7.35 8.85 33.46 ###
Quantity of Cross Drainage Structures

Clearing Sand,
Stripping Excavation Fill RC30 CC25 CC10 Formwork Masonry Gravel
No CDs m2 m3 m3 m3 m3 m3 m2 m3 m3
1 CD12 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 CD13 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 CD14 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 CD15 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
5 CD16 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
6 CD17 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
7 CD18 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
8 CD19 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
9 CD20 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
10 CD21 7624.80 56067.63 33640.58 1399.46 368.23 185.33 3124.82 785.41 463.31
Total #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Plate iron Bitumen Stone
t=5mm t=50mm Geomembrane Stone Pitiching
m2 kg m2 m3 m3
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
258.30 5383.13 3748.57 43.64 21.451499
#NAME? #NAME? #NAME? #NAME? #NAME?
TOTAL QUANTITY OF CROSS DRAINAGE STRUCTURES
Amount
Unit Rate (Birr)
S/N Description Unit Quantity ETB
Note : This section includes quantity for 7 Nr
structures.
1.1 Earth Works
1.1.1 Clearing & Stripping m2 #NAME?
1.1.2 Structural excavation m3 #NAME?
1.1.3 Compacted back fill with selected material m3 #NAME?
1.2 Main work
1.2.1 Reinforced concrete classRC30 to tube m3 #NAME?
1.2.2 Steel bar 8mm~24mm t
1.2.3 Concrete class C25 to face wall m3 #NAME?
1.2.4 Concrete class C10 to base of tube m 3
#NAME?
1.2.5 Wrought formwork to item 1.2.1, 1.2.2, 1.2.3 m 2
#NAME?
1.2.6 Masonry 600mm thick m 3
#NAME?
1.2.7 Mixed Sand&Gravle Bedding below Tube. m 3
#NAME?
1.2.8 Joint plate iron(t-5mm) m 2
#NAME?
1.2.9 Joint expansion bitumen kg #NAME?
1.2.10 Geomembrane to Maincanal Bed m 2
#NAME?
1.2.11 Stone Pitching to Outslope and Geomembrane m 3
#NAME?

Total
VAT @ 15 %
Grand Total
Total
Amount
ETB
붉은색은 계산서에서 끌어오거나 설계자가 정하는값
RW Width of Road m, m1 Side Slope of Main canal or Drain canal
n Rows of Tube t Thickness of Tube

Main Canal U
CH
on MC CBL FSL TBL BW TBW1 TBW2 m RW U/S CBL U/S FDL
No CDs m m m m m m m m m m m
1 CD12 33505 467.768 471.472 472.972 43.65 5.00 8.00 1.50 12.00 465.168 #NAME?
2 CD13 34451 467.673 471.378 472.878 43.65 5.00 8.00 1.50 12.00 465.523 #NAME?
3 CD14 35314 467.588 471.291 472.791 43.65 5.00 8.00 1.50 12.00 465.338 #NAME?
4 CD15 37241 467.403 471.099 472.599 43.65 5.00 8.00 1.50 12.00 465.123 #NAME?
5 CD16 40286 467.126 470.794 472.294 43.65 5.00 8.00 1.50 12.00 464.916 #NAME?
6 CD17 43133 466.361 470.009 471.509 43.20 5.00 8.00 1.50 12.00 464.001 #NAME?
7 CD18 44449 466.229 469.878 471.378 43.20 5.00 8.00 1.50 12.00 464.789 #NAME?
8 CD19 48972 465.777 469.425 470.925 43.20 5.00 8.00 1.50 12.00 464.307 #NAME?
9 CD20 51267 465.647 469.196 470.696 42.85 5.00 8.00 1.50 12.00 463.177 #NAME?
10 CD21 56148 465.159 468.708 470.208 42.85 5.00 8.00 1.50 12.00 461.979 467.832

Note; Modified CD12,13


Z Up Stream CBL - Down Stream CBL
n1 Number of Joint

Dimension of Cross Drainage Structures


Up Stream Tube
Nr of
U/S TBL m1 H H1 L1 D1 BW1 B1 B2 W1 b h t pipe l L
m m m m m m m m m m m Nr m m
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 17.00 107.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 16.00 106.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 15.00 105.00
#NAME? 1.50 ### ### 30.00 ### ### ### ### ### ### ### 0.25 ### 15.00 105.00
469.332 1.50 5.85 7.35 30.00 8.85 38.94 16.75 33.46 11.03 4.00 3.00 0.25 4 15.00 105.00
Tube Down Stream
Nr of
joint h1 b1 b2 h2 b3 Z D/S CBL D/S FSL D/S TBL L2 m1 H2 D2 B3 W2
Nr m m m m m m m m m m m m m m
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 ### ### ### ### ### ### #NAME? #NAME? #NAME? ### 1.50 ### ### ### ###
6 3.50 17.25 17.65 4.50 18.05 0.50 461.476 467.329 468.829 14.00 1.50 7.35 8.85 33.46 ###
Quantity of Cross Drainage Structures

Clearing
Stripping Excavation Fill RC25 CC20 CC10 Formwork Masonry
No CDs m2 m3 m3 m3 m3 m3 m2 m3
1 CD12 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 CD13 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 CD14 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 CD15 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
5 CD16 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
6 CD17 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
7 CD18 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
8 CD19 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
9 CD20 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
10 CD21 10430.72 76700.51 46020.31 1399.46 368.23 185.33 3124.82 2591.87
Total #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sand, Plate iron Bitumen
Gravel t=5mm t=50mm Geomembrane Stone
m3 m2 kg m2 m3
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
463.31 258.30 5383.13 3748.57 43.64
#NAME? #NAME? #NAME? #NAME? #NAME?