FT-C Thermal Fluid Heater Log Sheet

Page 66
Model: 4.13
Visual
Heater Inlet Heater Outlet Differential Pump Suction Setpoint Current Stack Nitrogen Pilot Run Inspection
Pump Heater
Date Time Pressure Pressure Pressure Pressure Temp. Temp. Temp. Level Flame Flame of pipework Actions/Remarks Sig.
Status Status
3 to 6 barg 1.5 to 4 barg (or greater) (clean if neg.) (°C) (°C) (°C) (barg) Signal. Signal for signs of
leakage
MAINTENANCE - 4

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N
MAINTENANCE LOG

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N
log sheet be filled out twice per shift of operation.

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

/ / : On/Off On/Off Y / N

Log examined by: Date:


Complete the maintenance log at least once per day as a minimum. It is recommended that the

FTC-IOMM-2015-2