Professional Documents
Culture Documents
Owner’s Engineer
Contractor
Sub-Supplier
Project
MRT-DN02-P2LBA-830001
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
RECORD OF REVISION
Rev. Date Page Affected Description of Revision
Rev.1 2 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
CONTENTS
3. COMMISSIONING .............................................................................................................11
3.1. COMMISSIONING REQUIREMENT ..............................................................................11
3.2. BYPASS VALVE OPERATING CONCEPT ......................................................................11
3.3. HP/IP/LP BYPASS SYSTEM OPERATION .................................................................... 13
4. APPENDIX .......................................................................................................................... 16
4.1. P&ID FOR HP & IP & LP STEAM SYSTEM ................................................................. 16
4.2. FUNCTION & INTERLOCK TEST RECORD SHEET................................................. 16
Rev.1 3 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
1. GENERAL INFORMATION
1.1. OBJECTIVE
This document provides the commissioning guideline of HP & IP & LP Steam System for MUARA
TAWAR COMBINED CYCLE POWER PLANT BLOCK 2,3 & 4 ADD-ON PROJECT.
1.2. SCOPE
The scope of commissioning covers the following activities and associated equipment list.
1) Checking the completeness of equipments required for commissioning.
2) Checking the integrity and readiness of all associated piping, valves, instrumentation, control
system and other fittings.
3) Checking completeness of all the electrical connections and associated protections.
4) Checking the various control loops and their response.
5) Checking the protection and functional interlocks of electrical / mechanical equipment in the
system.
6) Checking cleanliness of the entire system and it must be free of any foreign material or dirt, which
may damage the equipment or impair the system functionality.
1.3. SAFETY
At all times when conducting commissioning activities maintaining the Health and Safety of personnel
is of paramount importance. At all times the station safety regulations must be followed to ensure that
the health and safety of personnel (including those not directly involved in the commissioning activity)
is in no way put at risk.
It must be noted that commissioning activities may require equipment to be operated in an abnormal
manner or access to be gained to normally inaccessible areas. When conducting such activities extra
vigilance, caution and precautions are required to ensure that they are achieved in a safe manner.
Rev.1 4 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
1.4. REFERENCES
The function of the steam system is to provide the steam needed for the steam turbine during start-up,
low loads and normal operation of the plant and trip condition of the plant.
Steam is generated in the HRSGs by using heat of the exhaust gases of the Gas Turbines. The Steam
System is categorized as High Pressure (HP), Cold Reheat (CRH), Hot Reheat (HRH) and Low Pressure
(LP) Steam Systems.
Turbine bypass sytem is designed to safely and reliably control the flow and temperature of the steam
bypassing the turbine at all pressure levels during combined cycle start-up, steam turbine trip and major
system load rejection so that the HRSG can be safely kept online. The size and speed of operation of the
steam bypass system is able to bring the steam turbine from valves wide open plus 5% overpressure
Rev.1 5 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
condition to house load without lifiting HRSG safety valves or exceeding allowable HRSG water level
limits.
[Block 2]
1) HIGH PRESSURE (HP) STEAM SYSTEM
The high pressure, high temperature steam from two (2) HRSGs is delivered to HP steam common
line and provided to HP Steam Turbine.
The HRSG HP steam systems route steam from two (2) HRSG HP superheater outlets, through the
individual line non return valves (NRVs) and motorized isolation valves (MOVs), to a HP steam
common line. The individual lines after MOVs at each HRSG are interconnected with a HP steam
common line which is led to the steam turbine stop valves.
The HRSG HP steam system is equipped with steam bypass system for high pressure level, turbine
trip and start-up. From the each HRSG HP steam line, the bypass steam piping routes steam to the
bypass system. The downstream of the bypass system is connected to the each HRSG CRH steam
line.
Rev.1 6 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
The HRSG LP steam systems route steam from two (2) HRSG LP superheater outlets, through the
individual line non return valves (NRVs) and motorized isolation valves (MOVs), to a LP steam
common line. The individual lines after MOVs at each HRSG are interconnected with a LP steam
common line which is led to the steam turbine LP admission.
The LP steam system is equipped with one (1) common steam bypass system for low pressure level,
turbine trip and start-up. From the LP steam common line, the bypass steam piping routes steam to
the bypass system. The downstream of the bypass system is connected to the condenser.
[Block 3,4]
1) HIGH PRESSURE (HP) STEAM SYSTEM
The high pressure, high temperature steam from three (3) HRSGs is delivered to HP steam common
line and provided to HP Steam Turbine.
The HRSG HP steam systems route steam from three (3) HRSG HP superheater outlets, through the
individual line non return valves (NRVs) and motorized isolation valves (MOVs), to a HP steam
common line. The individual lines after MOVs at each HRSG are interconnected with a HP steam
common line which is led to the steam turbine stop valves.
The HRSG HP steam system is equipped with steam bypass system for high pressure level, turbine
trip and start-up. From the each HRSG HP steam line, the bypass steam piping routes steam to the
bypass system. The downstream of the bypass system is connected to the each HRSG CRH steam
line.
Rev.1 7 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
Rev.1 8 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
One (1) TBN Seal Steam PRDS (Pressure Reducing and Desuperheating System) is installed to
supply turbine gland seal steam. PRDS upstream pipe is taken from a HP steam common line.
TBN seal steam PRDS consists of one (1) Pressure Control Valve (PCV) and Desuperheater, one (1)
Temperature Control Valve (TCV).
TBN seal steam PRDS is used for the start-up, low load operation only when the steam turbine can
not be self-sealing.
[Block 3,4]
1) HP STEAM BYPASS SYSTEM
Three (3) HRSG HP Bypasses are installed for HRSG HP bypass operation. Each bypass upstream
pipe is taken from each HP steam supply line.
Each HP bypass consists of one (1) Steam Shut-off Valve, one (1) Pressure Control Valve (PCV) and
Desuperheater, one (1) Spray-water Shut-off Valve, one (1) Temperature Control Valve (TCV).
The spray-water shut-off valve works as backup safety function. In case that temperature control
valve is failed, spray water can be provided following wrong temperature condition. If amount of
spray water is over the reheat line capacity, water droplet can go into IP turbine directly and
resultantly can be cause of turbine trip.
Rev.1 9 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
2. PRE - COMMISSIONING
1) The mechanical and electrical erection of the system or equipment concerned has been completed
and cold checks of cabling including I/O-tests have been performed.
2) The functional testing does not disturb the completion of the other systems.
3) The functional testing does not cause any risk to personal safety.
4) The preliminary lubrication works included in the works have been performed.
5) The Site has been cleaned off the works wastes impeding the cold test operation of the systems.
6) The electrical instruments being part of the equipment have been installed in compliance with the
valid regulations.
7) Moving parts as well as rotating and hot parts that may hazard the personal safety have been
protected properly.
8) The persons in charge for start-up have been appointed.
9) Supervisor for the pressure equipment operation appointed. (if required)
1) Proper communication facilities between various control stations and central control room have
been prepared.
2) Personal protection equipment is available for commissioning personnel.
3) Warning signs are placed in all concerned operating area.
4) Portable fire extinguishers or permanent fire fighting systems are available at critical location.
The purpose of this test is to verify the system protection control logic & loop, such as alarm, trip and
associated changeover. Perform the test through DCS and/or PLC simulation and record the status on
attached record sheet.
Rev.1 10 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
3. COMMISSIONING
Rev.1 11 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
No. Description
LP Bypass Valve “Initial Position Mode”
1
LP bypass valve is at initial position (10%) for HRSG start-up.
LP bypass valve Pressure Minimum Mode
When the LP steam common header pressure > 1.5 barg,
2
LP bypass valve will be set to Pressure Minimum Mode and will be gradually opened to
25% as LP steam flow increases.
LP bypass valve Pressure Raise Mode
When the LP bypass valve position is > 25% and STG generator is NOT in ST IPC
3
Mode, LP bypass valve will be set to Pressure Raise Mode, and LP steam common
header will be pressurized to 2.5 barg..
LP Bypass Valve Pressure Fix Mode
4 When the LP steam common header pressure > 2.5 barg, LP bypass valve will be set to
Pressure Fix, and the LP steam common header pressure will be maintained at 2.5 barg.
LP Bypass Valve Pressure Follow Mode
When STG is IPC In mode, LP bypass valve will be set to Pressure Follow, and LP
5
bypass valve will be gradually closed by set point, LP steam common header pressure +
0.5 barg.
[Block3,4]
1) HP bypass valve control
No. Description
HP Bypass Valve “Initial Position Mode”
1
HP bypass valve is at initial position (10%) for HRSG start-up.
HP bypass valve Pressure Minimum Mode
When the HP steam common header pressure > 3 barg,
2
HP bypass valve will be set to Pressure Minimum Mode and will be gradually opened to
25% as HP steam flow increases.
HP bypass valve Pressure Raise Mode
When the HP bypass valve position is > 25% and STG generator is NOT synchronized,
3
HP bypass valve will be set to Pressure Raise Mode, and HP steam common header will
be pressurized to 60 barg.
HP Bypass Valve Pressure Fix Mode
4 When the HP steam common header pressure > 60 barg, HP bypass valve will be set to
Pressure Fix, and the HP steam common header pressure will be maintained at 60 barg.
HP Bypass Valve Pressure Follow Mode
When STG is IPC In mode, HP bypass valve will be set to Pressure Follow, and HP
5
bypass valve will be gradually closed by set point, HP steam common header pressure +
8 barg.
Rev.1 12 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
No. Description
When STG is IPC In mode, IP bypass valve will be set to Pressure Follow, and IP
bypass valve will be gradually closed by set point, IP steam common header pressure +
2 barg.
Preparation
Before start-up every kind of electrical sources and plant utilities including condensate water, feed water,
closed cooling water and instrument air system shall be normally ready in operation.
The following preparations shall be manually completed;
GTCS indicate a ready to start.
Electrical system On Ready
Power receiving station Ready
Electro-Chrolination plant is in service
Demi. Plant is in service
- Raw water tank level normal
- Make-up water tank level normal
Condensate system is in service
- Condensate pump is running
- Condenser water level normal
Boiler Feed water System is in service
- HP/ LP BFP pump is running with minimum FCV in Auto Mode
- Feedwater storage tank level normal
- HRSG HP/ LP drum level at their start up level
Rev.1 13 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
HRSG Purge
Please refer to commissioning procedure for HRSG (Doc. No. MRT-DN02-P2H-830012)
Divert damper is not closed, therefore, the heat transfer to the HRSG begins with GT ignition. The
metal of the heat transfer surfaces is heated up and steam begins to form in the evaporators. HRSG HP /
LP drum generates steam as per GT load increase.
The HP main steam line is warmed up by opening HP bypass valve. HP steam isolation valve for the
lead HRSG is available to be opened when combined cycle mode is selected and GT flame is ON
condition, Diverter Damper is opened. All MOV in drain line should be in auto mode throughout auto
plant start-up/shutdown sequence.
Rev.1 14 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
HP steam bypass valve will be opened 10% (tentative) for entering steam to HP steam bypass line and
cold reheat line for IP steam admission. The bypass valve opening position will be changed to control
set point pressure when steam pressure reached to that set point pressure. Bypass valve operates to
maintain HP steam pressure to 60 bara which steam turbine allows to admit to turbine. Generated HP
steam will be passed to cold reheat line through bypass line. Reheated steam vents to air through vent
valve in hot reheat line until IP bypass valve on hot reheat common steam line starts to operate under
the condition that condenser vacuum achieved & vacuum breaker valve closed.
IP steam bypass valve is opened up to 10% (tentative) to control initial set point pressure for allowing
the steam to pass toward condenser. The bypass valve opening position will be changed to control set
point pressure when steam pressure reached to that set point pressure.
LP steam lines are warmed up by opening LP steam isolation valve when steam generated. LP steam
bypass valve is opened up to 10% (tentative) to control initial setpoint pressure for allowing the steam
to pass toward Condenser. The bypass valve opening position will be changed to control set point
pressure when steam pressure reached to that set point pressure.
In case of the lag HRSG start-up, HP steam bypass valve operates same as the lead HRSG steam bypass
valve while start-up vent valve for HRH/LP steam is used for the lag HRSG start-up .
The lag HRSG generated HP steam will be passed to cold reheat line through HP bypass line and
reheated steam vents to air through vent valve in hot reheat line until hot reheat steam isolation valve is
open (Tie-in). Start-up vent valve will be kept in control to maintain HRSG pressure ramp rate by
operator manual. The set point for this pressure control will be such than the HRSG thermal stess is
within the allowable limit.
The lag HRSG generated LP steam also vents to air through vent valve until LP steam isolation valve is
open (Tie-in). Start-up vent valve will be kept in control to maintain HRSG pressure ramp rate by
operator manual. The set point for this pressure control will be such that the HRSG thermal stess is
within the allowable limit.
The permissive condition for HP/ IP steam pressure for start-up in all situations (cold, warm and hot
start-up) is 60 bara / 12 bara respectevely.
Rev.1 15 of 16
[Commissioning Procedure] HP & IP & LP Steam System
MRT-DN02-P2LBA-830001
During shut-down, transfer of steam from the steam turbine to the respective bypass systems is
accomplished. The bypass systems control the respective steam pressure as long as steam is generated in
the HRSGs.
After shut-down, the HP / HRH / LP steam common line low point drain valves at upstream of the steam
turbine shall open to remove any condensate that may accumulate in the steam piping, allowing drain to
the flash tank.
The precautionary measures are taken to prevent any accumulation of condensate formed in the steam
piping and to assure that condensate shall not enter the steam turbine with the superheated steam resulting
in damage to the steam turbine.
The normal operation condition for RSC (Reference Site Condition) is as following.
Description Block 2 Block 3 Block 4
168.53 t/h 168.22 t/h 166.17 t/h
HRSG Outlet HP
for each HRSG, for each HRSG, for each HRSG,
Steam
125.67 bara, 524.0 °C 125.88 bara, 523.0 °C 124.17 bara, 520.7 °C
166.10 t/h 162.22 t/h 160.25 t/h
HRSG Inlet CRH
for each HRSG, 26.18 for each HRSG, 26.14 for each HRSG, 25.78
Steam
bara, 304.4 °C bara, 307.1 °C bara, 305.5 °C
166.10 t/h 162.22 t/h 160.25 t/h
HRSG Outlet HRH
for each HRSG, 24.17 for each HRSG, 24.18 for each HRSG, 23.86
Steam
bara, 515.5 °C bara, 515.4 °C bara, 513.3 °C
76.73 kg/s 76.46 kg/s 76.28 kg/s
HRSG Outlet LP
for each HRSG, 6.32 for each HRSG, 6.32 for each HRSG, 6.32
Steam
bara, 288.4 °C bara, 288.4 °C bara, 288.4 °C
337.06 t/h for STG, 504.66 t/h for STG, 498.52 t/h for STG,
ST Inlet HP Steam
121.09 bara, 522.3 °C 122.10 bara, 521.3 °C 120.44 bara, 519.0 °C
332.19 t/h for STG, 486.66 t/h for STG, 480.74 t/h for STG,
ST Outlet CRH Steam
26.71 bara, 305.0 °C 26.67 bara, 307.8 °C 26.31 bara, 306.1 °C
332.19 t/h for STG, 486.66 t/h for STG, 480.74 t/h for STG,
ST Inlet HRH Steam
23.45 bara, 515.2 °C 23.45 bara, 515.1 °C 23.14 bara, 513 °C
150.92 kg/s for STG, 225.39 kg/s for STG, 225.27 kg/s for STG,
ST Inlet LP Steam
6.00 bara, 287.9 °C 6.00 bara, 288.0 °C 6.00 bara, 288.0 °C
Steam Conditions at HRSG outlet & ST Inlet as per HEAT BALANCE DIAGRAM (MRT-XG05-
P0ZEN-110001, BLOCK2 - 001, BLOCK3 - 001, BLOCK4 - 001)
During normal operation, the HP / HRH / LP steam from the HRSG is fed to the steam turbine.
4. APPENDIX
Rev.1 16 of 16
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
PIA+ TIA+
20 LBG05CP901 20 LBG05CT901
20 LBG05
20 LBG05
DN25
BR194
MIN. STRAIGHT RUN : 5.5 M 14.3 BAR.A
AA302
AA301
DN50
BR191
TBN SEAL STEAM PRDS
20 LBG05 TBN SEAL STEAM
LO
BR001 BR002 MRT-XG02-P2MAA-220005
G
DN80-GAD DN80-GBY (1 OF 1) (F-8)
FC 20 LBG05 G
GAD GBY AA101
GT
AS
20 LBA40CG081
GT
21 LBA21
DN25
BR401
HRSG #1 HP SUPERHEATER OUTLET PCV 20 LBG05CG401
MRT-XG02-P2LB-122022 BR001 20 LBA40AA081 MOV
(2 OF 15) (F-8) DN300-LAD
I 20LBG05AA401
5 GT M
20 LCE90CG081 FLASH TANK
TCV MRT-XG02-P2LCM-110005
BR401
20 LBA40
DN25-LAD
INC (1 OF 2) (A-4)
20 LCE90AA081
20 LCE90 CEP DISCHARGE
LO AS LO BR001 MRT-XG02-P2LC-110007
DN25-GBY (1 OF 1) (A-2)
20 LCE90 FC 20 LCE90 20 LCE90
AA102 AT001 AA101
TI
01 0
15
5
AA4 CE9
F
DN
20 LBA40CT001
L
20
F
TT
20 LBA40CT001
DN50-LAD
20 LBA40
GT
BR001
20 LBA40CG402
MOV
20LBA40AA402
M
LO FLASH TANK
MRT-XG02-P2LCM-110005
(1 OF 2) (G-3)
20 LBA40 INC
5 AA401
TCS TCS
E
HRSG #2 HP SUPERHEATER OUTLET 22 LBA21 20LBA03CP901 20LBA03CT901 E
MRT-XG02-P2LB-122022 BR001
(2 OF 15) (F-8) DN300-LAD
PIT PIT PP TT TT
5 20 LBA03CP001 20 LBA03CP002 20 LBA03CP401 20 LBA03CT001 20 LBA03CT003
20 LBA03 20 LBA03
20 LBA03 20 LBA03
20 LBA03 20 LBA03
AA301 AA302
AA303 AA304
AA305 AA306
TT TW
20 LBA03CT002 20 LBA03CT401
5
20 LBA03 HP TBN STOP VALVE #2
BR001 MRT-XG02-P2MAA-220005
DN250-LAD (1 OF 1) (F-6)
D D
DN80-LAD
GT
20 LBA30
20 LBA31CG001
BR001
DN300-LAD
20 LBA01
BR001
MOV
20LBA31AA001
FOR CONSTRUCTION
5 M
5 20 LBA31 FLASH TANK
LO 5 26.APR.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
TCS TCS BR001 MRT-XG02-P2LCM-110005
DN80-LAD (1 OF 2) (G-3) 4 01.FEB.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
PIA+ TIA+ 20 LBA31 INC
20LBA02CP901 20LBA02CT902 AA101
20 LBA01CP901 20 LBA01CT901 3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM J.H.HAN T.W.LIM K.H.KIM
C PIT PIT TT TT PIT PIT PP TT TT 1 19.SEP.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
C
20 LBA01CP001 20 LBA01CP002 20 LBA01CT001 20 LBA01CT002 20 LBA02CP001 20 LBA02CP002 20 LBA02CP401 20 LBA02CT001 20 LBA02CT003
0 07.JUL.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
20 LBA02 20 LBA02
20 LBA02 20 LBA02
20 LBA02 20 LBA02
20 LBA01 20 LBA01
20 LBA01 20 LBA01
AA301 AA302
AA303 AA304
AA305 AA306
AA303 AA304
NO.
TT TW Project
20 LBA02CT002 20 LBA02CT401
5 MUARA TAWAR COMBINED CYCLE
20 LBA02 POWER PLANT BLOCK 2, 3 & 4
HP TBN STOP VALVE #1 ADD-ON PROJECT
BR001 MRT-XG02-P2MAA-220005
DN250-LAD (1 OF 1) (G-6)
Owner
DN200
BR401
TI GT
20 LBA01CT006 20 LBA01CG402
Owner's Engineer
HP TBN STOP VALVE #B MOV
B TT BR410 MRT-XG02-P2MAA-220005 20LBA01AA402 B
20 LBA01CT006 DN25 (1 OF 1) (F-6)
M EPC Contractor
FLASH TANK
BR402 LO MRT-XG02-P2LCM-110005
DN50 (1 OF 2) (G-3)
20 LBA01 INC
AA401
Sub Contractor
HP TBN STOP VALVE #A
BR411 MRT-XG02-P2MAA-220005
DYNAMIC STRAINER DN25 (1 OF 1) (G-6)
20 LBA01
AA403
BR001
N2 CONNECTION
DN25-LAD 20 QJA10 20 QJA10 [STEAM AND BYPASS SYSTEM (FOR BLOCK 2)]
AA101 AA201
20 LBA01
AA404
A P&I DIAGRAM A
LAD HBD
DN25
N/S MRT-XG02-P2LBA-110003 1 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
H H
S TIA+ S TIA+
PV 21 LBH11CT901 22 LBH11CT901
21 LBH01AA051 PV
AS AS
22 LBH01AA051
FC TT TT FC TT TT
21 LBH01 21 LBH11CT002 21 LBH11CT003 22 LBH01 22 LBH11CT002 22 LBH11CT003
HRSG #1 HP STEAM HRSG #2 HP STEAM
ASME
ASME
MIN. STRAIGHT RUN : 5.8 M MIN. STRAIGHT RUN : 5.8 M
SEC.1
SEC.1
LAH
LAH
MRT-XG02-P2LB-122022 BR001 MRT-XG02-P2LB-122022 BR001
(2 OF 15) (B-8) DN250-LAH (2 OF 15) (B-8) DN250-LAH
21 LBH11 22 LBH11
ASME
ASME
B31.1
B31.1
LAD
LAD
5 HRSG #1 COLD REHEAT STEAM 5 HRSG #2 COLD REHEAT STEAM
HP BYPASS STATION #1 BR001 BR002 THIS DWG. HP BYPASS STATION #2 BR001 BR002 THIS DWG.
5 DN400-EAY DN400-GBD (F-2) 5 DN400-EAY DN400-GBD (D-2)
FC EAY GBD FC EAY GBD
GT HRSG #1 COLD REHEAT STEAM GT HRSG #2 COLD REHEAT STEAM
THIS DWG. THIS DWG.
AS
AS
G 21 LBH01CG081 22 LBH01CG081
(E-2) (C-2) G
DN25-LAD
DN25-LAD
22 LBH01
21 LBH01
PCV S PCV S
BR002
BR002
21 LBH01AA081 LO LO 22 LBH01AA081 LO LO
5 5
AS AS
21 LBH01 21 LBH01 21 LBH01 GT 22 LBH01 22 LBH01 22 LBH01 GT
AA101 BP001 AA102 FC AA101 BP001 AA102 FC
21 LAE61CG081 HRSG #2 HP STEAM PRESSURE 22 LAE61CG081
MRT-XG02-P2LB-122022
TCV TV (2 OF 15) (G-6) I TCV TV
HRSG #1 HP STEAM PRESSURE 21 LAE61AA081 21 LAE61AA051 22 LAE61AA081 22 LAE61AA051
DN80-CBD
22 LAE61
MRT-XG02-P2LB-122022
I 21 LAE61 5
BR001
(2 OF 15) (G-6) AS HP BFP DISCHARGE AS HP BFP DISCHARGE
BR001 MRT-XG02-P2LA-110006 MRT-XG02-P2LA-110006
DN80-CBD (2 OF 3) (F-2) (2 OF 3) (E-2)
5 21 LAE61 FC 21 LAE61 22 LAE61 FC 22 LAE61
AA201 AT001 AA201 AT001
01 1
01 1
AA4 LAE6
AA4 LAE6
15
22
15
21
5 5
DN
DN
02 6 1
02 1
AA4 LAE6
AA4 LAE
22
21
F
F
5
HP BYPASS #1 DOWNSTREAM
MOV THIS DWG.
21LBC21AA001 (G-5)
M
21 LBC21 HRSG #1 REHEATER INLET
BR001 MRT-XG02-P2LB-122022
DN400-GBD (6 OF 15) (B-8)
DN250
HP BYPASS #1 WARM-UP
BR410
THIS DWG.
AUXILIARY STEAM SYSTEM (G-5)
MRT-XG02-P2LBG-110004
COMBINED REHEAT VALVE 20 LBC45 (1 OF 1) (A-8) HRSG #1 BLOWDOWN TANK
MOV
MRT-XG02-P2MAA-220005 BR001 BR411 MRT-XG02-P2LB-122022
E 21LBC21AA002
(1 OF 1) (H-4) DN50-GBD DN50 (13 OF 15) (G-7)
21 LBC21 E
AA410
DN50
BR412
LO LO
T
21 LBC21
DN250
AA413
21 LBC21
BR401
21 LBC21
AA411 21 LBC21 AA412
MOV AA802
MOV TCS TCS 20LBC13AA001 HRSG #1 BLOWDOWN TANK
20LBC40AA001 BR402 MRT-XG02-P2LB-122022
M M
VACUUM FLASH TANK 20LBC13CP901 20LBC13CT001 PIA+ TIA+ DN25 (13 OF 15) (G-8)
21 LBC21
MRT-XG02-P2LCM-110005 BR002 20 LBC13CP004 20 LBC13CT002 AA401
DN25
BR403
(2 OF 2) (F-3) DN150-GBD LO LO
T
21 LBC21
PIT PIT PIT TT PIT TT
AA404
21 LBC21 21 LBC21
20 LBC13CP001 20 LBC13CP002 20 LBC13CP003 20 LBC13CT001 20 LBC13CP004 20 LBC13CT002 AA402 21 LBC21 AA403
5
DN150-GBD
AA801 5
20 LBC40
BR001
D HP BYPASS #2 DOWNSTREAM D
FV MOV THIS DWG.
20 LBC13AA201
20 LBC13
20 LBC13
20 LBC13
20 LBC13
22LBC21AA001 (G-2)
AA302
AA304
AA303
AA301
20 LBC13 22 LBC21 M
HP TBN EXHAUST HRSG #2 REHEATER INLET
MRT-XG02-P2MAA-220005 BR001 BR001 MRT-XG02-P2LB-122022
(1 OF 1) (F-7) DN550-GBD DN400-GBD (6 OF 15) (B-8)
FOR CONSTRUCTION
DN250
HP BYPASS #2 WARM-UP
BR410
5
DN300
BR410
BR401 THIS DWG.
(G-2)
DN300 5 26.APR.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
22LBC21AA002 MRT-XG02-P2LB-122022
20 LBC13 20 LBC13 DN50 (13 OF 15) (G-7)
AA311 AA321 22 LBC21 3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM J.H.HAN T.W.LIM K.H.KIM
20 LBC13CL082
20 LBC13CL082
20 LBC13CL084
20 LBC13CL084
AA410
DN50
BR412
LSA++
LSA++
2 09.NOV.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
20 LBC13 20 LBC13 LO LO
LS
LS
AA315 AA325 T
20 LBC13CL083
20 LBC13CL083
20 LBC13CL081
20 LBC13CL081
22 LBC21
J.H.HAN T.W.LIM K.H.KIM
C C
DN250
AA413
22 LBC21 22 LBC21
BR401
LSA+
LSA+
LS
LS
DN25
BR403
I LO LO POWER PLANT BLOCK 2, 3 & 4
I T ADD-ON PROJECT
22 LBC21
AA404
22 LBC21 22 LBC21
S
GT AA402 22 LBC21 AA403 Owner
20 LBC13CG410 AA801
AS
LV MOV
20LBC13AA410 5
FO 20 LBC13AA451
Owner's Engineer
M
VACUUM FLASH TANK FLASH TANK LO
B VS LO ws LO BR402 BR411 B
MRT-XG02-P2MAA-220005 MRT-XG02-P2LCM-110005
(1 OF 1) (C-7) DN25 (1 OF 2) (C-3) DN50
20 LBC13 FO 20 LBC13 INC 20 LBC13
AA402 AA401 AA412
DN25
BR403
EPC Contractor
VS LO LO 20 LBC30 AUXILIARY STEAM HEADER
T BR001 MRT-XG02-P2LBG-110004
20 LBC13 20 LBC13 DN200-GBD (1 OF 1) (H-8)
AA404 20 LBC13 AA403
20 LBC13
AA411
20 QJA11
DN25
AA801
BR001 Sub Contractor
N2 CONNECTION
DN25-GBD
20 LBC13
20 QJA11 20 QJA11
AA406
AA201 AA101
DN25
HBD GBD
DRAWING TITLE
N/S MRT-XG02-P2LBA-110003 2 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
H H
PIA+ TIA+
I 20 LBH31CP001 20 LBH31CT001
S
PV PIT TT
AS 20 LBH21AA051 20 LBH31CP001 20 LBH31CT001
MOV
21LBB21AA001 FC
M 21 LBB21 IP BYPASS STATION
HRSG #1 REHEATER OUTLET
20 LBH31
MRT-XG02-P2LB-122022 BR001
AA301
(6 OF 15) (F-8) DN550-EAD
21 LBB21
AA201 20 LBH31 CONDENSER
5
21 LBB21
BR001 MRT-XG02-P2LCM-110005
AA401
DN300
BR402
TI DN300 DN800-GAY (1 OF 2) (F-8)
BR410
DN25
GT 21 LBB21CT002 MOV FC
21 LBB21CG411 21LBB21AA002 GT
AS
G 20 LBH21CG081 MIN. STRAIGHT RUN : 4.687 M
MOV TT G
21LBB21AA411 21 LBB21CT002 PCV
20 LBH21AA081
M
HRSG #1 BLOWDOWN TANK LO
MRT-XG02-P2LB-122022 BR411
(13 OF 15) (E-8) INC DN50 PIA- PIA-
21 LBB21
AA410 20 LCE30CP002 20 LCE30CP001
21 LBB21
5 PIT PIT
AA412
DN300
BR401
20 LCE30CP002 20 LCE30CP001
DN25
TI
DN150-GBY
20 LCE30
21 LBB21CT001 GT
BR001
20 LCE30CG081
20 LCE30
20 LCE30
GT TT
AA302
AA301
21 LBB21CG404 TCV
21 LBB21CT001 20 LCE30AA081
5 MOV
F
21LBB21AA404 AS LO CEP DISCHARGE
DN25-EAD
20 LBH21
BR405
M TI ws
MRT-XG02-P2LC-110007 F
HRSG #1 BLOWDOWN TANK LO 20 LBH21CT001 GT
BR403 (1 OF 1) (D-2)
MRT-XG02-P2LB-122022 20 LBH21CG402 20 LCE30 FC 20 LCE30 20 LCE30
(13 OF 15) (E-7) AA102 AT001 AA101
INC 21 LBB21 DN50 TT MOV
01 0
5
AA4 LCE3
AA403
2
5
DN
20 LBH21CT001 20LBH21AA402
20
21 LBB21
AA405
M
FLASH TANK FLASH TANK
DN25
LO LO LO
BR402 MRT-XG02-P2LCM-110005 MRT-XG02-P2LCM-110005
MOV DN25 (1 OF 2) (C-3) (1 OF 2) (C-3)
20 LBH21 INC 20 LBH21 20 LBH21 20 LBH21
22LBB21AA001 AA401 AA405 BP001 AA406
M
20 LBH21
22 LBB21
AA403
HRSG #2 REHEATER OUTLET
MRT-XG02-P2LB-122022 BR001
DN25
(6 OF 15) (F-8) DN550-EAD
22 LBB21
AA201
5
22 LBB21
AA401
E
DN300
BR402
TI
DN300
BR410
DN25
GT MOV E
22 LBB21CT002
22 LBB21CG411 22LBB21AA002
MOV TT
22 LBB21CT002 20 LBH21 20 LBB32
22LBB21AA411
BR001 BR001
M DN550-EAD DN50-EAD
HRSG #2 BLOWDOWN TANK LO BR411
MRT-XG02-P2LB-122022
(13 OF 15) (E-8) INC 22 LBB21 DN50
AA410 20 LBB45 IP VALVE CASING WARMING
BR001 MRT-XG02-P2MAA-220005
(1 OF 1) (H-4)
22 LBB21
5 DN100-EAD
AA412
DN25
TI
22 LBB21CT001 20 LBB40 GT
DN550-EAD
20 LBB01
BR001
DN50-EAD
AA405
20 LBB31
J.H.HAN T.W.LIM K.H.KIM
BR001
DN25
20 LBB01CP901 20 LBB01CT901 20 LBB01CP003 20 LBB01CP004 20 LBB01CP005 20 LBB01CP401 20 LBB01CT003 20 LBB01CT005 4 01.FEB.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
20 LBB01
20 LBB01
20 LBB01
20 LBB01
20 LBB01CP001 20 LBB01CP002 20 LBB01CT001 20 LBB01CT002
AA304
AA306
AA303
AA305
C 20 LBB01CT004 20 LBB02CT401 1 19.SEP.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
C
0 07.JUL.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
COMBINED REHEAT VALVE
MRT-XG02-P2MAA-220005 REV. DATE DESCRIPTION DRAWN CHKD. APPD.
20 LBB01
20 LBB01
NO.
(1 OF 1) (G-4)
AA302
AA301
Project
Owner
DN300
BR401
TI
20 LBB01CT006 GT Owner's Engineer
20 LBB01CG402
B TT MOV B
20 LBB01CT006 20LBB01AA402
EPC Contractor
M
LO FLASH TANK
BR402 MRT-XG02-P2LCM-110005
DN50 (1 OF 2) (C-3)
20 LBB01 INC
AA401
DYNAMIC STRAINER Sub Contractor
20 QJA12
BR001
N2 CONNECTION
DN25-EAD
20 LBB01
20 QJA12 20 QJA12
AA404
EAD HBD
[STEAM AND BYPASS SYSTEM (FOR BLOCK 2)]
A P&I DIAGRAM A
N/S MRT-XG02-P2LBA-110003 3 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
H H
PIA+ TIA+
20 LBH51CP001 20 LBH51CT001
S
PIT TT
AS PV 20 LBH51CP001 20 LBH51CT001
20 LBH41AA051 I
FC
21 LBA71 LP BYPASS STATION
20 LBH51
HRSG #1 LP SUPERHEATER OUTLET
AA301
MRT-XG02-P2LB-122022 BR001
(7 OF 15) (F-8) DN450-HBD
20 LBH51 CONDENSER
5 BR001 MRT-XG02-P2LCM-110005
DN700-HBD (1 OF 2) (F-6)
FC
GT
AS
G 20 LBH41CG081 MIN. STRAIGHT RUN : 3.44 M
G
PCV
20 LBH41AA081
DN300
BR401
PIA- PIA-
20 LCE40CP002 20 LCE40CP001
DN25-HBD
20 LBH41
BR404
DN50-GBY
20 LCE40
PIT PIT
BR001
20 LCE40CP002 20 LCE40CP001
GT
20 LCE40CG081
20 LCE40
20 LCE40
AA302
AA301
TCV
20 LCE40AA081
F AS CEP DISCHARGE
VS LO LO
MRT-XG02-P2LC-110007 F
5 TI (1 OF 1) (C-2)
20 LBH41CT001 GT 20 LCE40 FC 20 LCE40 20 LCE40
20 LBH41CG402 AA102 AT001 AA101
01 0
15
5
AA4 CE4
TT MOV
DN
L
20
20 LBH41CT001 20LBH41AA402
M
LO FLASH TANK LO LO FLASH TANK
BR402 MRT-XG02-P2LCM-110005 MRT-XG02-P2LCM-110005
DN25 (1 OF 2) (A-3) (1 OF 2) (A-3)
20 LBH41 INC 20 LBH41 20 LBH41 20 LBH41
AA401 AA405 BP001 AA406
DN600-HBD
20 LBH41
20 LBH41
22 LBA71
AA403
HRSG #2 LP SUPERHEATER OUTLET
BR001
MRT-XG02-P2LB-122022 BR001
DN25
(7 OF 15) (F-8) DN450-HBD
5
E
E
DN600-HBD
20 LBA71
BR001
TCS TCS
FOR CONSTRUCTION
20LBA71CP902 20LBA71CT902 5 26.APR.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
PIA+ TIA+
20 LBA71CP901 20 LBA71CT901 4 01.FEB.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
20 LBA71
20 LBA71
20 LBA71
20 LBA71
20 LBA71
20 LBA71
TT TW REV.
AA304
AA302
AA306
AA305
AA303
AA301
5 Owner
DN300
BR401
TI
20 LBA71CT006 GT
20 LBA71CG402
Owner's Engineer
TT MOV
B 20 LBA71CT006 20LBA71AA402 B
M
LO FLASH TANK EPC Contractor
BR402 MRT-XG02-P2LCM-110005
DN25 (1 OF 2) (A-3)
20 LBA71
AA401
BR001
N2 CONNECTION
DN25-HBD 20 QJA13 20 QJA13
20 LBA71
AA404
AA101 AA201
DN25
DRAWING TITLE
N/S MRT-XG02-P2LBA-110003 4 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
CEP DISCHARGE RO
H 20 LCE20 H
MRT-XG02-P2LC-110007
(1 OF 1) (E-2) BR002
DN50-GBY 20 LCE20
BP001
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
(1 OF 4) (B-4)
(1 OF 4) (C-2)
(1 OF 4) (E-3)
DN80-GBY
20 LCE20
BR001
GT
20 LCE20AA081
TCV
20 LCE20AA081
6
AS
BR402
20 LBA01
DN50-LAD
BR401
20 LBA40
BR001
20 LBA31
DN80-LAD
DN25-LAD
G
DN25-GBY
20 LCM60 20 LCE20 FL 20 LCE20 G
VENT FROM VACUUM FLASH TANK AA131 AA132
20 LCE20
MRT-XG02-P2LCM-110005 BR501
AA401
(2 OF 2) (G-3) DN800-HBD
SPARE
20 LCM10
BS001
D
IP BYPASS 20 LBH31 20 LBH51 LP BYPASS
DN25
MRT-XG02-P2LBA-110003 BR001 BR001 MRT-XG02-P2LBA-110003
(4 OF 4) (G-2)
DN600-HBD
(3 OF 4) (G-2) DN800-GAY DN700-HBD
20 LCM10
BR501
NOZZLE
FOR SPRAY 20 LCE20
L BR003
20 LCE20 DN50-GBY
20 LCE20 AA133
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
20 MAG10CT001 20 MAG10CT004 F
TIA+ TIA+
(1 OF 1) (D-8)
(1 OF 1) (B-8)
(1 OF 1) (F-8)
20 MAG10CT901 20 MAG10CT902
TT TT
20 MAG10CT002 20 MAG10CT003
DN25-GBD
DN25-GBD
BR401
BR401
DN25-GBD
20 LBC33
20 LBC31
BR401
20 LBC32
(3 OF 4) (H-2)
20 MAG10CP901 BR401
TT
20 LCM10CT001 DN300-GAD
PG
20 LCM10CP501
SPARE
20 MAG60
TO STEAM JET AIR EJECTOR 20 MAG60 20 MAG60
PIT PIT TG
20 LCM10
20 LCM10
MRT-XG02-P2MAJ-603101 BR010 BR009 BR007 ws
20 LCM10CT501 BR402
AA301
20 MAG10CP001 20 MAG10CP003
DN25
E (1 OF 1) (E-8) DN300-HBD DN200-HBD DN150-HBD 20 MAG60 DN250-GAY
E
20 MAG10
AA111
20 MAG10
AA333
AA331
VS
VS
20 MAG60 PIT
20 MAG10CP002
BR008 ws
NOZZLE 20 LCE20
20 MAG10
L BR004
VS
AA112
DN50-GBY
FLASH TANK 20 LCE20 20 LCE20
AA134
CONDENSATE FROM SJAE INTER
20 MAJ54 (ATMOSPHERIC) AZ002
CONDENSER 20 LCM10BB001
MRT-XG02-P2MAJ-603101 BR403
(1 OF 1) (A-6) DN40-HBD
20 LCM10 NOZZLE
FOR SPRAY
20 LCE20
20 LCM10 BR403 L BR005
20 LCM10
AA302 AA304 DN250-GAY DN50-GBY
20 LCE20
DN300-HBD
20 LCE20
20 LCM10
D CONDENSATE FROM SJAE AFTER AA135 D
AZ003
BR404
CONDENSER 20 MAJ55
20 LCM10CL001
20 LCM10CL001
20 LCM10CL501
MRT-XG02-P2MAJ-603101 BR404
DN50-GBY
20 LCE20
BR006
DN25
(1 OF 1) (A-4)
LIA+
DN40-HBD
LIT
LG
SPARE
FOR CONSTRUCTION
DN50-GBD
DN50-EAD
DN25-EAD
DN50-EAD
DN25-EAD
20 LBH21
20 LBB31
20 LBB01
20 LBC13
20 LBH21
BR405
BR402
BR001
CONDENSER
BR402
BR411
20 MAG10AC001
6 22.JUN.2018 FOR CONSTRUCTION Y.H.KIM T.W.LIM K.H.KIM
20 LCM10 20 LCM10
20 LCE20
AA136
AA303 AA305 5 FOR CONSTRUCTION
PI
L
26.APR.2018 Y.H.KIM T.W.LIM K.H.KIM
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
IP TURBINE INLET WARMUP DRAIN
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
20 LCM30CP011
(3 OF 4) (D-2)
(3 OF 4) (B-4)
(2 OF 4) (B-6)
(3 OF 4) (F-4)
(3 OF 4) (F-3)
PIT 3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM Y.H.KIM T.W.LIM K.H.KIM
20 LCE20
MOV
AZ004
20 LCM30CP011 NOZZLE
FOR SPRAY 2 09.NOV.2017 FOR APPROVAL Y.H.KIM T.W.LIM K.H.KIM
C 20LCM10AA001 C
MOV M 1 19.SEP.2017 FOR APPROVAL Y.H.KIM T.W.LIM K.H.KIM
20LCM30AA010 20 LCM10
BR405 REV.
20 LCM30
20 LCM30 M DN100-HBD
EXISTING MSF CONDENSATE RETURN WS Project
BR010 GT
MTC-ME-402656 MUARA TAWAR COMBINED CYCLE
DN50-HBD
DN100-HBD
20 LCM10AA081
20 LCM10
BR406
20 LCM60 6
DN25
DRAIN FROM VACUUM FLASH TANK
MRT-XG02-P2LCM-110005 BR401 ws AS
(2 OF 2) (C-7) DN80-HBD
DN25-HBD
Owner's Engineer
AA401
DN25-HBD
DN25-HBD
20 LBH41
20 LBG01
DN25-HBD
DN25-HBD
DN25-HBD
20 LBG04
20 LBG03
20 LBG06
BR402
BR402
B B
BR402
BR402
BR402
D
DN25-GBY
DN25-HBD
DN25-HBD
20 LBG05
DN25-HBD
DN25-HBD
20 LBG20
DN25-HBD
DN25-HBD
20 LBA71
20 LBG07
20 LBH41
20 LBG02
20 LBG10
EPC Contractor
ws
BR407
BR402
BR402
BR401
BR402
BR404
BR402
BR402
20 LCM10 DN100
AA103
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBG-110004
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBA-110003
MRT-XG02-P2LBG-110004
MRT-XG02-P0LBG-110004
CRH PRDS #3 OUTLET LINE DRAIN
CRH PRDS #1 OUTLET LINE DRAIN
(4 OF 4) (F-4)
(4 OF 4) (F-3)
(1 OF 4) (G-2)
(1 OF 1) (E-2)
(1 OF 1) (A-2)
(1 OF 1) (B-2)
(1 OF 1) (G-4)
(1 OF 1) (D-4)
(1 OF 1) (B-4)
(1 OF 1) (D-2)
(1 OF 1) (E-5)
DEAERATOR LINE DRAIN
DRAWING TITLE
DRAIN
A P&I DIAGRAM A
N/S MRT-XG02-P2LCM-110005 1 OF 2 6
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
PIA+ TIA+
30 LBG05CP901 30 LBG05CT901
30 LBG05
30 LBG05
DN25
14.3 BAR.A
BR194
MIN. STRAIGHT RUN : 5.5 M
AA302
AA301
DN80
BR191
TBN SEAL STEAM PRDS
30 LBG05 TBN SEAL STEAM
LO
G
BR001 BR002 MRT-XG02-P3MAA-220005
DN100-GAD DN100-GBY (1 OF 1) (E-8)
FC 30 LBG05 G
GAD GBY AA101
GT
AS
30 LBA40CG081
GT
DN25
BR401
PCV 30 LBG05CG401
30 LBA40AA081 MOV
I 30LBG05AA401
31 LBA21 GT
HRSG #1 HP SUPERHEATER OUTLET M
MRT-XG02-P3LB-122022 BR001 30 LCE90CG081 FLASH TANK
(2 OF 15) (F-8) DN300-LAD TCV MRT-XG02-P3LCM-110005
30 LBA40
BR401
DN25-LAD
(1 OF 2) (A-4)
30 LCE90AA081 INC
5 30 LCE90
LO AS LO CEP DISCHARGE
BR001 MRT-XG02-P3LC-110007
(1 OF 1) (A-2)
DN50-LAD
DN25-GBY
30 LBA40
30 LCE90 FC 30 LCE90 30 LCE90
BR001
AA102 AT001 AA101
TI
01 0
15
5
AA4 CE9
F
DN
30 LBA40CT001
L
30
F
TT
30 LBA40CT001 GT
30 LBA40CG402
MOV
30LBA40AA402
M
LO FLASH TANK
MRT-XG02-P3LCM-110005
(1 OF 2) (G-3)
30 LBA40 INC
AA401
TCS TCS
5
E
30LBA03CP901 30LBA03CT901 E
PIT PIT PP TT TT
HRSG #2 HP SUPERHEATER OUTLET 32 LBA21 30 LBA03CP001 30 LBA03CP002 30 LBA03CP401 30 LBA03CT001 30 LBA03CT003
MRT-XG02-P3LB-122022 BR001
(2 OF 15) (F-8) DN300-LAD
30 LBA03 30 LBA03
30 LBA03 30 LBA03
30 LBA03 30 LBA03
AA301 AA302
AA303 AA304
AA305 AA306
5 TT TW
30 LBA03CT002 30 LBA03CT401
5
30 LBA03 HP TBN STOP VALVE #2
BR001 MRT-XG02-P3MAA-220005
DN300-LAD (1 OF 1) (F-6)
D D
DN80-LAD
GT
30 LBA30
30 LBA31CG001
BR001
MOV
30LBA31AA001
FOR CONSTRUCTION
DN350-LAD
M
30 LBA01
BR001
C PIT PIT TT TT PIT PIT PP TT TT 1 19.SEP.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
C
30 LBA01CP001 30 LBA01CP002 30 LBA01CT001 30 LBA01CT002 30 LBA02CP001 30 LBA02CP002 30 LBA02CP401 30 LBA02CT001 30 LBA02CT003
0 07.JUL.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
33 LBA21
30 LBA02 30 LBA02
30 LBA02 30 LBA02
30 LBA02 30 LBA02
30 LBA01 30 LBA01
30 LBA01 30 LBA01
REV.
HRSG #3 HP SUPERHEATER OUTLET DATE DESCRIPTION
AA301 AA302
AA301 AA302
AA303 AA304
AA303 AA304
DRAWN CHKD. APPD.
AA305 AA306
NO.
MRT-XG02-P3LB-122022 BR001 TT TW Project
(2 OF 15) (F-8) DN300-LAD 30 LBA02CT002 30 LBA02CT401
5 MUARA TAWAR COMBINED CYCLE
5 30 LBA02 POWER PLANT BLOCK 2, 3 & 4
HP TBN STOP VALVE #1 ADD-ON PROJECT
BR001 MRT-XG02-P3MAA-220005
5 DN300-LAD (1 OF 1) (G-6)
Owner
DN200
BR401
TI GT
30 LBA01CT003 30 LBA01CG402
Owner's Engineer
HP TBN STOP VALVE #B MOV
B TT BR410 MRT-XG02-P3MAA-220005 30LBA01AA402 B
30 LBA01CT003 DN25 (1 OF 1) (F-6)
M EPC Contractor
FLASH TANK
BR402 LO MRT-XG02-P3LCM-110005
DN50 (1 OF 2) (G-3)
30 LBA01 INC
AA401
Sub Contractor
HP TBN STOP VALVE #A
BR411 MRT-XG02-P3MAA-220005
DYNAMIC STRAINER DN25 (1 OF 1) (G-6)
30 LBA01
AA403
5
30 QJA10 DRAWING TITLE
BR001
N2 CONNECTION
DN25-LAD 30 QJA10 30 QJA10 [STEAM AND BYPASS SYSTEM (FOR BLOCK 3, 4)]
AA101 AA201
30 LBA01
AA404
A P&I DIAGRAM A
LAD HBD
DN25
N/S MRT-XG02-P3LBA-110003 1 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
ASME
ASME
MIN. STRAIGHT RUN : 6.3 M MIN. STRAIGHT RUN : 6.3 M
SEC.1
SEC.1
LAH
LAH
MRT-XG02-P3LB-122022 BR001 MRT-XG02-P3LB-122022 BR001
(2 OF 15) (B-8) DN250-LAH (2 OF 15) (B-8) DN250-LAH
31 LBH11 32 LBH11
ASME
ASME
B31.1
B31.1
LAD
LAD
5 HRSG #1 COLD REHEAT STEAM HRSG #2 COLD REHEAT STEAM
HP BYPASS STATION #1 BR001 BR002 5 HP BYPASS STATION #2 BR001 BR002
THIS DWG. THIS DWG.
5 DN400-EAY DN400-GBD (F-2) 5 DN400-EAY DN400-GBD (D-2)
FC EAY GBD FC EAY GBD
GT HRSG #1 COLD REHEAT STEAM GT HRSG #2 COLD REHEAT STEAM
THIS DWG. THIS DWG.
AS
AS
31 LBH01CG081 32 LBH01CG081
(F-2) (D-2)
DN25-LAD
DN25-LAD
32 LBH01
PCV PCV
31 LBH01
S S
BR002
BR002
31 LBH01AA081 LO LO 32 LBH01AA081 LO LO
5 5
AS AS
31 LBH01 31 LBH01 31 LBH01 GT 32 LBH01 32 LBH01 32 LBH01 GT
G AA101 BP001 AA102 FC AA101 BP001 AA102 FC
31 LAE61CG081 HRSG #2 HP STEAM PRESSURE 32 LAE61CG081 G
MRT-XG02-P3LB-122022
TCV TV (2 OF 15) (G-6) I TCV TV
HRSG #1 HP STEAM PRESSURE 31 LAE61AA081 31 LAE61AA051 32 LAE61AA081 32 LAE61AA051
DN80-CBD
32 LAE61
MRT-XG02-P3LB-122022
I 31 LAE61 5
BR001
(2 OF 15) (G-6) AS HP BFP DISCHARGE AS HP BFP DISCHARGE
BR001 MRT-XG02-P3LA-110006 MRT-XG02-P3LA-110006
5 DN80-CBD (2 OF 3) (F-2) (2 OF 3) (E-2)
31 LAE61 FC 31 LAE61 32 LAE61 FC 32 LAE61
AA201 AT001 AA201 AT001
01 1
01 1
AA4 LAE6
AA4 LAE6
15
32
31
5
15
5
DN
DN
02 61
02 1
5
AA4 LAE6
AA4 LAE
32
HP BYPASS #1 DOWNSTREAM
31
MOV THIS DWG.
31LBC21AA001 (G-5)
S TIA+
PV 33 LBH11CT901 31 LBC21 M
33 LBH01AA051 HRSG #1 REHEATER INLET
AS BR001 MRT-XG02-P3LB-122022
F (6 OF 15) (B-8)
FC TT TT DN450-GBD F
33 LBH01 33 LBH11CT002 33 LBH11CT003
DN250
HP BYPASS #A WARM-UP
BR410
HRSG #3 HP STEAM
ASME
DN50
GT
BR412
THIS DWG.
AS
31 LBH01CG081 LO LO
(B-2) T
DN25-LAD
33 LBH01
PCV
31 LBC21
DN250
S
AA413
31 LBC21
BR401
31 LBC21
BR002
DN25
BR403
HRSG #3 HP STEAM PRESSURE 33 LAE61AA081 33 LAE61AA051 LO LO 5
E
MRT-XG02-P3LB-122022
I AS
33 LAE61 HP BFP DISCHARGE T
31 LBC21
(2 OF 15) (G-6)
AA404
BR001 MRT-XG02-P3LA-110006 31 LBC21 31 LBC21
DN80-CBD (2 OF 3) (D-2) AA402 31 LBC21 AA403
5 33 LAE61 FC 33 LAE61 AA801 5
AA201 AT001 AUXILIARY STEAM SYSTEM HP BYPASS #2 DOWNSTREAM
01 1
AA4 LAE6
33
5 32LBC21AA001
DN
(1 OF 1) (A-8) (G-2)
02 1
AA4 LAE6
33
32 LBC21 M
HRSG #2 REHEATER INLET
BR001 MRT-XG02-P3LB-122022
MOV DN450-GBD (6 OF 15) (B-8)
MOV TCS TCS 30LBC13AA001
DN250
BR410
30LBC40AA001 HP BYPASS #B WARM-UP
M M THIS DWG.
VACUUM FLASH TANK 30LBC13CP901 30LBC13CT001 COMBINED REHEAT VALVE #B PIA+ TIA+
MRT-XG02-P3LCM-110005 BR002 BR002 MRT-XG02-P3MAA-220005 30 LBC13CP004 30 LBC13CT002 (G-2)
D D
(2 OF 2) (F-3) DN150-GBD DN50 (1 OF 1) (G-5)
MOV HRSG #2 BLOWDOWN TANK
32LBC21AA002 BR411 MRT-XG02-P3LB-122022
PIT PIT PIT TT PIT TT (13 OF 15) (G-7)
30 LBC13CP001 30 LBC13CP002 30 LBC13CP003 30 LBC13CT001 30 LBC13CP004 30 LBC13CT002 DN50
32 LBC21
AA410
DN50
BR412
30 LBC45 COMBINED REHEAT VALVE #A LO LO
DN150-GBD
T
30 LBC40
FV BR001 MRT-XG02-P3MAA-220005
FOR CONSTRUCTION
32 LBC21
DN250
BR001
30 LBC13AA201
AA413
32 LBC21
BR401
DN50-GBD (1 OF 1) (G-5) 32 LBC21
30 LBC13
30 LBC13
30 LBC13
30 LBC13
AA302
AA304
AA303
AA301
AA401
DN25
BR403
LO LO 5 3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM J.H.HAN T.W.LIM K.H.KIM
DN300
BR410
BR401 5 T 2 09.NOV.2017 FOR APPROVAL
32 LBC21
J.H.HAN T.W.LIM K.H.KIM
AA404
DN300 32 LBC21 32 LBC21
AA402 32 LBC21 AA403 5 1 19.SEP.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
C AA801 C
HP BYPASS #3 DOWNSTREAM 0 07.JUL.2017 FOR APPROVAL J.H.HAN T.W.LIM K.H.KIM
30 LBC13 30 LBC13 MOV THIS DWG.
AA311 AA321
30 LBC13CL082
30 LBC13CL082
30 LBC13CL084
30 LBC13CL084
33LBC21AA001 (F-5) REV.
NO.
DATE DESCRIPTION DRAWN CHKD. APPD.
LSA++
LSA++
30 LBC13 30 LBC13
LS
LS
Project
AA315 AA325 M
30 LBC13CL083
30 LBC13CL083
33 LBC21
30 LBC13CL081
30 LBC13CL081
LSA+
LS
LS
DN250
BR410
AA313 AA323 HP BYPASS #C WARM-UP
THIS DWG. Owner
DN250
DN50 (13 OF 15) (G-7)
BR401
Owner's Engineer
S 33 LBC21
GT AA410
DN50
BR412
B 30 LBC13CG410 LO LO B
AS T
LV MOV
33 LBC21
AA413
FO 30 LBC13AA451 30LBC13AA410 33 LBC21 33 LBC21
AA411 33 LBC21 AA412 EPC Contractor
AA802
M
VACUUM FLASH TANK FLASH TANK HRSG #3 BLOWDOWN TANK
VS LO ws LO LO BR402 MRT-XG02-P3LB-122022
MRT-XG02-P3MAA-220005 BR402 MRT-XG02-P3LCM-110005 BR411
(1 OF 1) (B-8) DN25 (1 OF 2) (C-3) DN50 DN25 (13 OF 15) (G-8)
30 LBC13 FO 30 LBC13 INC 30 LBC13 33 LBC21
AA401
DN25
BR403
AA402 AA401 AA412 Sub Contractor
DN25
BR403
LO LO
VS LO LO 5
T
T 33 LBC21
AA404
30 LBC13 30 LBC13 33 LBC21 33 LBC21
AA404 30 LBC13 AA403 AA402 33 LBC21 AA403
30 LBC13
AA801
AA411
30 QJA11 30 QJA11
AA406
HBD GBD
N/S MRT-XG02-P3LBA-110003 2 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
4.1. P&ID for steam & bypass system (Block 3, 4) TEMP. FROM CONDENSER INLET
MRT-XG02-P3LCM-110005
(1 OF 2) (E-8)
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
RESPECTIVELY AS PER PIPING LAYOUT.
2. THIS SYSTEM SHOWN IS FOR BLOCK 3 ONLY. BLOCK 4 HAS AN
IDENTICAL SYSTEM WITH BLOCK 3 P&ID EXCEPT KKS NUMBER FOR
ONLY PLANT CODE (G1).
H H
PIA+ TIA+
I 30 LBH31CP001 30 LBH31CT001
S
PV PIT TT
AS 30 LBH21AA051 30 LBH31CP001 30 LBH31CT001
MOV
31LBB21AA001 FC
M 31 LBB21 IP BYPASS STATION
HRSG #1 REHEATER OUTLET
30 LBH31
MRT-XG02-P3LB-122022 BR001
AA301
(6 OF 15) (F-8) DN550-EAD
31 LBB21
AA201 30 LBH31 CONDENSER
5
31 LBB21
BR001 MRT-XG02-P3LCM-110005
AA401
DN300
BR402
TI DN300 DN950-GAY (1 OF 2) (F-8)
BR410
DN25
GT 31 LBB21CT002 MOV FC
31 LBB21CG411 31LBB21AA002 GT
AS
G 30 LBH21CG081 MIN. STRAIGHT RUN : 4.725 M
MOV TT G
31LBB21AA411 31 LBB21CT002 PCV
30 LBH21AA081
M
HRSG #1 BLOWDOWN TANK LO
MRT-XG02-P3LB-122022 BR411
(13 OF 15) (E-8) INC DN50 PIA- PIA-
31 LBB21
AA410 30 LCE30CP002 30 LCE30CP001
5
31 LBB21
PIT PIT
AA412
DN300
BR401
30 LCE30CP002 30 LCE30CP001
DN25
DN150-GBY
TI
30 LCE30
31 LBB21CT001 GT
BR001
30 LCE30CG081
30 LCE30
30 LCE30
GT
AA303
AA301
TT TCV
31 LBB21CG404 31 LBB21CT001 30 LCE30AA081
5 MOV
F AS LO CEP DISCHARGE
DN25-EAD
30 LBH21
BR405
31LBB21AA404 M TI ws
MRT-XG02-P3LC-110007 F
HRSG #1 BLOWDOWN TANK LO 30 LBH21CT001 GT (1 OF 1) (D-2)
MRT-XG02-P3LB-122022 BR403 30 LBH21CG402 30 LCE30 FC 30 LCE30 30 LCE30
(13 OF 15) (E-7) AA102 AT001 AA101
INC 31 LBB21 DN50 TT MOV
01 0
5
AA4 LCE3
2
AA403 5
DN
30 LBH21CT001 30LBH21AA402
30
31 LBB21
AA405
M
FLASH TANK FLASH TANK
DN25
BR402 LO LO LO
MRT-XG02-P3LCM-110005 MRT-XG02-P3LCM-110005
MOV DN25 (1 OF 2) (C-3) (1 OF 2) (C-3)
30 LBH21 INC 30 LBH21 30 LBH21 30 LBH21
32LBB21AA001 AA401 AA405 BP001 AA406
M
30 LBH21
32 LBB21
AA403
HRSG #2 REHEATER OUTLET
MRT-XG02-P3LB-122022 BR001
TCS TCS
DN25
(6 OF 15) (F-8) DN550-EAD
32 LBB21
5 AA201
30LBB03CP901 30LBB03CT901
32 LBB21
AA401
E
DN300
BR402
TI
DN300
BR410
DN25
GT 32 LBB21CT002 MOV E
32 LBB21CG411 32LBB21AA002 PIT PIT PP TT TT
MOV TT 30 LBB03CP001 30 LBB03CP002 30 LBB03CP401 30 LBB03CT001 30 LBB03CT003
32 LBB21CT002 30 LBH21
32LBB21AA411
BR001
M DN650-EAD
HRSG #2 BLOWDOWN TANK LO BR411 TT TW
30 LBB03
30 LBB03
30 LBB03
MRT-XG02-P3LB-122022
AA303
AA305
AA301
30 LBB03CT002 30 LBB03CT401
(13 OF 15) (E-8) INC 32 LBB21 DN50 5
AA410 30 LBB45 IP VALVES CASING WARMING 30 LBB03 COMBINED REHEAT VALVE #2
BR001 MRT-XG02-P3MAA-220005 BR001 MRT-XG02-P3MAA-220005
5 (1 OF 1) (G-5)
32 LBB21
TI
30 LBB40
DN650-EAD
32 LBB21CT001
30 LBB01
BR001
30 LBB31
BR001
DN50-EAD
32LBB21AA404 M
HRSG #2 BLOWDOWN TANK LO
MRT-XG02-P3LB-122022 BR403
(13 OF 15) (E-7) INC DN50
30 LBB32
BR001
FOR CONSTRUCTION
32 LBB21
AA403 DN50-EAD
TCS TCS
32 LBB21
GT
AA405
DN50-EAD
DN25
30 LBB30
BR001
30LBB31AA001 3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM J.H.HAN T.W.LIM K.H.KIM
30 LBB02
30 LBB02
30 LBB02
DATE DESCRIPTION DRAWN CHKD. APPD.
NO.
(6 OF 15) (F-8)
AA303
AA305
AA301
33 LBB21 DN550-EAD 30 LBB02CT002 30 LBB02CT401
AA201 5 Project
5 30 LBB02
33 LBB21
DN300
BR402
TI
30 LBB01
30 LBB01
AA303
AA301
BR410
DN25
M
HRSG #3 BLOWDOWN TANK LO BR411
MRT-XG02-P3LB-122022 TI
30 LBB01CT003 GT
DN300
Owner's Engineer
BR401
EPC Contractor
M
DN25
TI LO FLASH TANK
33 LBB21CT001 BR402 MRT-XG02-P3LCM-110005
DN50 (1 OF 2) (C-3)
30 LBB01 INC
GT TT AA401
33 LBB21CG404 DYNAMIC STRAINER Sub Contractor
33 LBB21CT001
5 MOV 30 QJA12
33LBB21AA404 M BR001
HRSG #3 BLOWDOWN TANK N2 CONNECTION
LO DN25-EAD 30 QJA12 30 QJA12
30 LBB01
MRT-XG02-P3LB-122022 BR403
AA404
A P&I DIAGRAM A
DN25
N/S MRT-XG02-P3LBA-110003 3 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
30 LBH51
HRSG #1 LP SUPERHEATER OUTLET
AA301
MRT-XG02-P3LB-122022 BR001
(7 OF 15) (F-8) DN450-HBD
30 LBH51 CONDENSER
5
BR001 MRT-XG02-P3LCM-110005
DN850-HBD (1 OF 2) (F-6)
FC
GT
AS
G 30 LBH41CG081 MIN. STRAIGHT RUN : 2.975 M
G
PCV
30 LBH41AA081
DN300
BR401
PIA- PIA-
30 LCE40CP002 30 LCE40CP001
DN25-HBD
BR404
30 LBH41
DN50-GBY
30 LCE40
PIT PIT
BR001
30 LCE40CP002 30 LCE40CP001
GT
30 LCE40CG081
30 LCE40
30 LCE40
AA302
AA301
TCV
30 LCE40AA081
F AS CEP DISCHARGE
VS LO LO
MRT-XG02-P3LC-110007 F
5 TI (1 OF 1) (C-2)
30 LBH41CT001 GT 30 LCE40 FC 30 LCE40 30 LCE40
30 LBH41CG402 AA102 AT001 AA101
01 0
15
5
AA4 CE4
TT MOV
DN
L
30
30 LBH41CT001 30LBH41AA402
M
LO FLASH TANK LO LO FLASH TANK
BR402 MRT-XG02-P3LCM-110005 MRT-XG02-P3LCM-110005
DN25 (1 OF 2) (A-3) (1 OF 2) (A-3)
30 LBH41 INC 30 LBH41 30 LBH41 30 LBH41
AA401 AA405 BP001 AA406
DN750-HBD
30 LBH41
30 LBH41
32 LBA71
AA403
HRSG #2 LP SUPERHEATER OUTLET
BR001
MRT-XG02-P3LB-122022 BR001
DN25
(7 OF 15) (F-8) DN450-HBD
5
E
E
DN750-HBD
30 LBA71
BR001
TCS TCS
FOR CONSTRUCTION
30LBA71CP902 30LBA71CT902 5 26.APR.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
PIA+ TIA+
30 LBA71CP901 30 LBA71CT901 4 01.FEB.2018 FOR CONSTRUCTION J.H.HAN T.W.LIM K.H.KIM
30 LBA71
30 LBA71
30 LBA71
30 LBA71
30 LBA71
TT TW REV.
AA304
AA302
AA306
AA305
AA303
AA301
5 Owner
DN400
BR401
TI
30 LBA71CT006 GT
30 LBA71CG402
Owner's Engineer
TT MOV
B 30 LBA71CT006 30LBA71AA402 B
M
LO FLASH TANK EPC Contractor
BR402 MRT-XG02-P3LCM-110005
DN25 (1 OF 2) (A-3)
30 LBA71
AA401
5 BR001
N2 CONNECTION
DN25-HBD 30 QJA13 30 QJA13
30 LBA71
AA404
AA101 AA201
DN25
DRAWING TITLE
N/S MRT-XG02-P3LBA-110003 4 OF 4 5
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
8 7 6 5 4 3 2 1
NOTE
1. VENT AND DRAIN WILL BE PROVIDED AT HIGH AND LOW POINTS
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
(1 OF 4) (B-4)
(1 OF 4) (C-2)
(1 OF 4) (F-3)
DN80-GBY
30 LCE20
BR001
GT
30 LCE20AA081
TCV
30 LCE20AA081
6 AS
G
30 LBA01
BR402
DN50-LAD
BR001
30 LBA31
DN80-LAD
30 LBA40
BR401
DN25-GBY
DN25-LAD
30 LCM60 30 LCE20 FL 30 LCE20
30 LCE20
VENT FROM VACUUM FLASH TANK AA132 G
AA131
AA401
MRT-XG02-P3LCM-110005 BR501
(2 OF 2) (G-3) DN800-HBD
D SPARE
30 LCM10
BS001
IP BYPASS 30 LBH31 30 LBH51 LP BYPASS
DN25
MRT-XG02-P3LBA-110003 BR001 BR001 MRT-XG02-P3LBA-110003
(4 OF 4) (G-2)
DN600-HBD
(3 OF 4) (G-2) DN950-GAY DN850-HBD
30 LCM10
BR501
NOZZLE
FOR SPRAY 30 LCE20
L BR003
30 LCE20 DN50-GBY
30 LCE20 AA133
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
30 MAG10CT001 30 MAG10CT004 F
TIA+ TIA+
(1 OF 1) (D-8)
(1 OF 1) (B-8)
(1 OF 1) (F-8)
30 MAG10CT901 30 MAG10CT902
TT TT
30 MAG10CT002 30 MAG10CT003
DN25-GBD
DN25-GBD
BR401
30 LBC31
30 LBC32
BR401
PIA+Z++
DN25-GBD
BR401
30 LBC33
(3 OF 4) (H-2)
30 MAG10CP901 BR401
TT
30 LCM10CT001 DN300-GAD
PG
30 LCM10CP501
SPARE
TO STEAM JET AIR EJECTOR 30 MAG60 30 MAG60 30 MAG60 30 LCM10
PIT PIT TG
30 LCM10
MRT-XG02-P3MAJ-604101 BR010 BR009 BR007 ws
30 LCM10CT501 BR402
AA301
30 MAG10CP001 30 MAG10CP003
DN25
E (1 OF 1) (E-8) DN300-HBD DN200-HBD DN150-HBD 30 MAG60 DN250-GAY
E
AA111
30 MAG10
30 MAG10
AA333
AA331
VS
VS
30 MAG60 PIT
30 MAG10CP002
BR008 ws
NOZZLE
30 LCE20
30 MAG10
L BR004
VS
AA112
CONDENSATE FROM SJAE INTER DN50-GBY
30 MAJ54 FLASH TANK 30 LCE20
30 LCE20
CONDENSER AA134
MRT-XG02-P3MAJ-604101 BR403 (ATMOSPHERIC) AZ002
(1 OF 1) (A-6) DN40-HBD 30 LCM10BB001
30 LCM10 NOZZLE
FOR SPRAY
30 LCE20
BR403 L BR005
DN250-GAY DN50-GBY
30 LCM10 30 LCM10 30 LCE20
DN300-HBD
30 LCM10
D CONDENSATE FROM SJAE AFTER AA302 AA304 30 LCE20 AA135 D
30 MAJ55 AZ003
BR404
CONDENSER
30 LCM10CL001
30 LCM10CL001
30 LCM10CL501
MRT-XG02-P3MAJ-604101 BR404
DN50-GBY
30 LCE20
BR006
DN25
(1 OF 1) (A-4) DN40-HBD
LIA+
LIT
LG
MOV
40LCM30AA010 SPARE
FOR CONSTRUCTION
DN50-GBD
DN25-EAD
DN25-EAD
RO
DN50-EAD
DN50-EAD
30 LBC13
30 LBH21
30 LBH21
30 LBB01
M
30 LBB31
BLOCK 4 CONDENSER
BR402
BR411
BR405
BR402
CONDENSER
BR001
WS
30 LCM10 30 LCM10
MRT-XG02-P4LCM-110005 30 MAG10AC001 AA303 AA305
40 LCM30 40 LCM30 6 22.JUN.2018 FOR CONSTRUCTION Y.H.KIM T.W.LIM K.H.KIM
30 LCE20
BP111 AA010
AA136
5 FOR CONSTRUCTION
L
26.APR.2018 Y.H.KIM T.W.LIM K.H.KIM
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
IP TURBINE INLET WARMUP DRAIN
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
PI
(3 OF 4) (B-4)
(3 OF 4) (C-2)
(2 OF 4) (B-6)
(3 OF 4) (F-4)
(3 OF 4) (F-3)
3 12.DEC.2017 APPROVED BY OWNER ON 4TH DRM Y.H.KIM T.W.LIM K.H.KIM
30 LCE20
AZ004
PIT MOV NOZZLE
C FOR SPRAY 2 09.NOV.2017 FOR APPROVAL Y.H.KIM T.W.LIM K.H.KIM
C
30 LCM30CP011 MOV 30LCM10AA001
30LCM30AA010 M 1 19.SEP.2017 FOR APPROVAL Y.H.KIM T.W.LIM K.H.KIM
30 LCM10
DN50-HBD
40 LCM30
BR405
30 LCM30
REV.
BR001
NO.
HK 30 LCM30 M
NEW MSF CONDENSATE RETURN DN100-HBD
WS Project
BR001
MRT-XG02-P0GAA-135005 GT MUARA TAWAR COMBINED CYCLE
DN50-HBD 30 LCM30 30 LCM30 30 LCM10AA081 POWER PLANT BLOCK 2, 3 & 4
DOOSAN AA010 BP111
DN100-HBD
30 LCM10AA081
Owner
30 LCM60
DN25
DRAIN FROM VACUUM FLASH TANK 6
MRT-XG02-P3LCM-110005 BR401 ws AS
(2 OF 2) (C-7) DN80-HBD
DN25-HBD
30 LCM10 FC 30 LCM10
30 LCM10
SPARE
AA401
DN25-HBD
DN25-HBD
DN25-HBD
DN25-HBD
DN25-HBD
30 LBH41
30 LBG01
30 LBG06
30 LBG04
30 LBG03
BR402
BR402
BR402
BR402
BR402
B B
D
ws BR407
DN25-GBY
30 LBG05
DN25-HBD
DN25-HBD
DN25-HBD
DN100
DN25-HBD
DN25-HBD
DN25-HBD
30 LBG02
30 LBH41
30 LBA71
30 LBG20
30 LBG07
EPC Contractor
30 LBG10
30 LCM10 BR401
BR402
BR404
BR402
BR402
BR402
BR402
AA103
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBG-110004
MRT-XG02-P0LBG-110004
CRH PRDS #2 OUTLET LINE DRAIN
MRT-XG02-P3LBG-110004
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
MRT-XG02-P3LBA-110003
(4 OF 4) (B-4)
(4 OF 4) (F-4)
(4 OF 4) (F-3)
(1 OF 1) (E-2)
(1 OF 1) (A-2)
(1 OF 1) (B-2)
(1 OF 1) (G-4)
(1 OF 1) (D-4)
(1 OF 1) (B-4)
(1 OF 1) (D-2)
(1 OF 1) (D-5)
DEAERATOR LINE DRAIN
DRAWING TITLE
DRAIN
[STEAM DRAIN SYSTEM (FOR BLOCK 3, 4)]
DRAIN
A P&I DIAGRAM A
N/S MRT-XG02-P3LCM-110005 1 OF 2 6
8 7 6 5 4 3 2 1 A1 (594 x 841mm)
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner
4.2 FUNCTION & INTERLOCK TEST RECORD SHEET
FUNCTION & INTERLOCK TEST
COMMENT
Contractor
Owner