225 Identifier Unit LOA/PTW Name

1 155032 U1 No active LOA/PTW UNIT 1 BARRING GEAR


2 153984 U1 1 active LOA/PTW Coal Feeder 1F Cable Laying,
3 153984 U1 1 active LOA/PTW Instruments Connection
Coal Feeder 1F and
Cable Laying,
Commissioning
Instruments Connection and # 7
4 154323 U1 1 active LOA/PTW SERVICE AIR COMPRESSOR
Commissioning
5 154442 U1 1 active LOA/PTW SPRAY TANK LEVEL - 1
6 154784 U1 No LOA/PTW TRANSMITTER
U#1 Cooling tower spray storage
7 155032 U1 No active LOA/PTW level
UNIT 11 &BARRING
3 GEAR

8 155062 U2 1 active LOA/PTW c6A


9 154384 U2 1 active LOA/PTW Coal feeder 2F
10 154304 U2 1 active LOA/PTW PA FAN 2B OUTLET DAMPER
12 154522 U2 No LOA/PTW FOURTH EXTRACTION QC NRV
13 154342 U2 No LOA/PTW COAL FEEDER 2A
14 151551 U2 1 active LOA/PTW Stacker Reclaimer Buckets
15 154936 U2 1 active LOA/PTW Stacker and Reclaimer
17 151753 U2 No active LOA/PTW PLOUGH DEFECT-UNIT#3
18 155100 U2 1 active LOA/PTW ,UNIT#1,UNIT-2
UNIT 2 DUMP VALVE 822(FLY ASH
SYSTEM) FAILING TO TAKE DUMP
19 155082 U2 No LOA/PTW CEP 3A Inlet MOV
COMMAND

20 151588 U3 1 active LOA/PTW ACC FAN STREET 1 FAN 1


21 151588 U3 1 active LOA/PTW ACC FAN STREET 1 FAN 1
22 154853 U3 1 active LOA/PTW id fan A de vibration probe
23 154861 U3 1 active LOA/PTW ACC STREET 1 FAN 1 motor bottom
24 154951 U3 1 active LOA/PTW axletree temperature
UNIT 3 DCS TRENDS DISPLAY
25 154959 U3 1 active LOA/PTW BFP B BEARIBFP B NDE BEARING
26 154479 U3 1 active LOA/PTW HIGH
N1 & HHconveyor
bucket VT (30LAC12CY102
-B01)
27 151588 U3 1 active LOA/PTW ACC FAN STREET 1 FAN 1
28 151583 U3 No LOA/PTW PA FAN 3B
29 155101 U3 1 active LOA/PTW ESP HOPPER 312

30 153954 U4 1 active LOA/PTW U#4 REMEDIAL TURBINE BEARING


31 154558 U4 1 active LOA/PTW NO.5 TEMPERATURE
Raw Water SHOWING
Inlet Flowmeter
ERROR TO BE RECTIFIE
32 154949 U4 No LOA/PTW Underground water flow meter
33 154852 U4 No LOA/PTW defective
ro tank level transmitter
34 150803 U4 No active LOA/PTW Tank#2 level Indicator Showing
Faulty
35 153983 S5 1 active LOA/PTW Fire detection Panel 9 detector faults
36 154963 S5 No LOA/PTW Coal Out plant 2F Coal Conveyor
37 154957 S5 No LOA/PTW Gallery
Coal Out plant 2D Coal Conveyor
Gallery
Observation Priority Start Current workflow
UNIT 1 BARRING GEAR NOT ENGAGING JOP SWITCH 1- 2/7/2019 state
PTW/LOA handled
NOT ACTING1F
Coal Feeder AND COAL
Cable FEEDER
Laying, D DISCHARGE
Instruments GATE
Connection Emergenc
6 - User 2/1/2019 PTW/LOA handled
NOT
and CLOSING
Commissioning of the feeder ydefined
priority
Coal Feeder 1F Cable Laying, Instruments Connection 6 - User 2/1/2019
(immediat PTW/LOA handled
and Commissioning of the feeder priority
defined
SERVICE AIR COMPRESSOR # 7 - P1 & P2 - HIGH 2
e)
(>6 - Urgent 1/30/2019 PTW/LOA handled
ALARAM & SAFTY VALVE POP-UP TO BEFAULTY
CHECK & priority
priority
SPRAY TANK LEVEL - 1 TRANSMITTER 4 -
months)
(>6 1/31/2019 Work started
REPAIR. (48
Routine
Not showing 6 -
months)
hours) User 2/4/2019 PTW/LOA requested
priority
defined (8
UNIT 1 BARRING GEAR NOT ENGAGING JOP SWITCH 1-
weeks) 2/7/2019 5:42 PTW/LOA handled
NOT ACTING AND COAL FEEDER D DISCHARGE GATE priority
Emergenc
NOT CLOSING (>6
y priority
pulley key switch found to be continuously acting months)
6 - User
(immediat Work started
during the belt run C6A defined
e)
Coal flow fluctuating 2 - Urgent 1/30/2019 PTW/LOA handled
priority
PA FAN 2B OUTLET DAMPER OPEN FEED BACK NOT priority
6 - User 1/30/2019 PTW/LOA handled
(>6
SHOWING DCS (48
defined
FOURTH EXTRACTION QC NRV NOT CLOSING months)
6 - User 2/1/2019 Work started
hours)
priority
COAL FEEDER 2A DISCHARGE GATE LIMIT SWITCH defined
6 - User 1/30/2019 PTW/LOA requested
(>6
priority
NOT WORKING
Stacker Reclaimer Buckets. need to check and fix it. defined
1 -
months) 1/2/2019 Work started
(>6
priority
Belt offtracking Emergenc
1 -
months) 2/6/2019 PTW/LOA handled
(>6
yEmergenc
priority
UNIT#3 B8 LOCALLY IS NOT FULLY LOWER.LIMIT 6 - User
months)
(immediat 1/4/2019 PTW/LOA handled
NEED ydefined
priority
UNIT 2TO CHECK,B7
DUMP VALVELIMIT NEED
822(FLY ASH TOSYSTEM)
CHECK,UNI-1 A1
FAILING 3
e)-
(immediat UNIT 2 DUMP VALVE 822(FLY ASH UNIT 2 DUMP VALVE
AND A3 DOESNOT
TO TAKE SHOW POSITION,UNIT-2 6A
DUMP COMMAND priority
Routine SYSTEM) FAILING TO TAKE DUMP 822(FLY ASH
CEP 3ANEED
LIMIT inlet MOV not showing feedback
TO ADJUST,4BAND 5B FEED BACK ISSUE e)
2
(>6- Urgent CEP 3A Inlet MOV CEP 3A inlet MOV
priority (2 COMMAND SYSTEM) FAILING
priority
months) not showing
weeks) TO TAKE DUMP
(48 feedback
COMMAND
ACC FAN STREET 1 FAN 1 MOTOR BOTTOM 4 -
hours) 1/3/2019 Work started
AXLETREE TEMPERATURE
ACC FAN STREET SHOWING
1 FAN 1 MOTOR WRONG
BOTTOM Routine
4- 1/3/2019 Work started
VALUE.NEED
AXLETREE TO CHECK SHOWING WRONG
TEMPERATURE priority
Routine (8
id fan A de vibration probe fluctuating 6
weeks) (8 2/5/2019
- User PTW/LOA handled
VALUE.NEED TO CHECK priority
defined
ACC STREET 1 FAN 1 motor bottom axletree 5 -
weeks) 2/5/2019 PTW/LOA handled
temperature showing DISPLAY
wrong value priority
Routine
UNIT 3 DCS TRENDS NOT SHOWING UP 2
(>6- Urgent 2/6/2019 PTW/LOA handled
priority
priority (6
BFP B NDE BEARING INDICATING HIGH STATUS 1 -
months)
months) 2/6/2019 PTW/LOA handled
(48
Emergenc
N1 bucket conveyor chain scission alarm. please 5 -
hours) 1/31/2019 Work started
check ZSSSTREET 1 FAN 1 MOTOR BOTTOM yRoutine
priority
ACC FAN 4 -
(immediat 1/3/2019 Work started
AXLETREE priority (6
PA FAN 3B TEMPERATURE SHOWING
DISCHARGE DAMPER WRONG
FEEDBACK IS NOT Routine
2
months)(8 1/3/2019
e)- Urgent PTW/LOA requested
VALUE.NEED
SHOPWING TODCS.
ON CHECK
NEED TO CHECK AND RECTIFY. priority
priority
U3 CONVEYING SYS FOR DRY ASH (30ETG) 1 -
weeks) Showing seal failure,
(48
Emergenc check and rectify
hours)
y priority
U#4 REMEDIAL TURBINE BEARING NO.5 (immediat
4- 1/28/2019 PTW/LOA handled
TEMPERATURE NOT DECREASING COMPAIRE TO ALL e)
Routine
Please disconnect and reconnect raw water inlet 6 - User 2/1/2019 Work started
BEARINGS
flow meter AFTER BARRING GEAR
controller/instrumets OFF
for MMD to work on priority
defined (8
No flow indication 4 -
weeks) 2/6/2019 Planning concluded
the valve priority
Routine
ro tank level transmitter faulty 6 -
(>6 User 2/5/2019 Planning concluded
priority
defined (8
Tank#2 level Indicator Showing Faulty 6 - User
months)
weeks) 1/14/2019 PTW/LOA requested
priority
defined
(>6
priority
Group 1004 M4 -LH detector for U1 distribution room 4 -
months)
(>6 1/28/2019 Work started
-2.5m
Coal Out plant 2F Coal Conveyor Gallery LH10 Routine
6 - User 2/6/2019
months) PTW/LOA requested
indicating fault 2D
in Fire priority (8
Coal Out plant CoalSystem Control
Conveyor Panel.
Gallery LH5 defined
6 - User 2/6/2019
weeks) PTW/LOA requested
indicating fault on Fire Detection Control System priority
defined
Panel. (>6
priority
months)
(>6
months)
Condition
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above

None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above

None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above
None of Above

None of Above
None of Above
None of Above
None of Above
None of Above

None of Above
None of Above
None of Above
75 Uni Identifi LOA/PTW Asset
11t er
141513 No LOA/PTW SVC AIR COMP14 (90SCA10AN014)
21 151805 No LOA/PTW U2 BTLMS-BLR TUBE LEAKAGE MONITORING SYS & CEMS (20CFB)
31 142055 No LOA/PTW U1 BLR RADIATION SECTION (10HMB)
41 145269 No LOA/PTW CF A BELT CONVR (10HFB11AF001)
51 135771 No LOA/PTW SLAG COOLER A CHAIN GEAR (10HNA81AF001 MG01)
61 142458 No LOA/PTW Service Air Compressor House (90QFA02AN001KN01)
71 142447 No LOA/PTW U1 HEAT GENERATION (10H)
81 145685 No LOA/PTW CF B BELT CONVR (10HFB12AF001)
91 142970 No LOA/PTW U1 HEAT GENERATION (10H)
10 1 143072 No LOA/PTW SVC AIR COMP3 (90SCA10AN003)
11 1 143212 No LOA/PTW Service Air Compressor House (90QFA03AN001KN01)
12 1 149937 No LOA/PTW U1 AD BNR2 (10HJA22AV001)
13 1 143205 No LOA/PTW U1 PA FAN LUBE OIL STATION SYS (10HLX)
14 1 143716 No LOA/PTW SVC AIR COMP15 (90SCA10AN015)
15 1 143780 No LOA/PTW SVC AIR COMP4 (90SCA10AN004)
16 1 143908 No LOA/PTW SVC AIR COMP16 (90SCA10AN016)
17 1 144735 No LOA/PTW U1 TURB SYS (10M)

18 2 141509 No LOA/PTW BOP TRANSPORT SYS FOR COAL CONVEYOR (90EAC)


19 2 110142 No LOA/PTW BOP TRANSPORT SYS FOR COAL CONVEYOR (90EAC)
20 2 142054 No LOA/PTW U2 BLR RADIATION SECTION (20HMB)
21 2 142170 No LOA/PTW BOP TRANSPORT SYS FOR COAL CONVEYOR (90EAC)
22 2 145379 No LOA/PTW BOP INSTRUMENT & CONTROL EQUIPMENT SYS (90C)
23 2 142451 No LOA/PTW BOP FUEL SPLY & RESIDUES DISPOSAL (90E)
24 2 142448 No LOA/PTW U2 HEAT GENERATION (20H)
25 2 145600 No LOA/PTW CF A BELT CONVR (20HFB11AF001)
26 2 142971 No LOA/PTW U2 HEAT GENERATION (20H)
27 2 136619 No LOA/PTW SLAG COOLER A CHAIN GEAR (20HNA81AF001 MG01)
28 2 143203 No LOA/PTW U2 PA FAN LUBE OIL STATION SYS (20HLX)
29 2 149939 No LOA/PTW U2 AD BNR1 (20HJA21AV001)
30 2 146715 No LOA/PTW CF B BELT CONVR (20HFB12AF001)
31 2 143704 No LOA/PTW BOP TRANSPORT SYS FOR COAL CONVEYOR (90EAC)
32 2 143718 No LOA/PTW U2 DCS SYSTEM (20CRQ02)
33 2 143705 No LOA/PTW BOP TRANSPORT SYS FOR COAL CONVEYOR (90EAC)

34 3 144998 No LOA/PTW BOP LIME HANDLING PLANT SYS (90HTD)


35 3 135269 No LOA/PTW BOP CONTROL CABINET FOR AHP PLC UNIT 3 & 4 SYS (92CRS)
36 3 135268 No LOA/PTW U2 ESP SYSTEM PLC (20CRQ22)
37 3 135267 No LOA/PTW U1 ESP SYSTEM PLC (10CRQ22)
38 3 135270 No LOA/PTW BOP CONTROL CABINET FOR AHP PLC UNIT 3 & 4 SYS (92CRS)
39 3 141907 No LOA/PTW U1 CONVEYING SYS FOR DRY ASH (10ETG)
40 3 110590 No LOA/PTW COAL RUNOFF SYSTEM PLC SOFTWARE - SIEMENS S7 200 (90CRQ11)
41 3 110591 No LOA/PTW COAL RUNOFF SYSTEM PLC SOFTWARE - Ge Fanuc Plant Rx3i
42 3 142053 No LOA/PTW (90CRQ12)
U3 BLR RADIATION SECTION (30HMB)
43 3 110592 No LOA/PTW COAL RUNOFF SYSTEM PLC SOFTWARE - DUST EVACUATION SYSTEM
44 3 135906 No LOA/PTW (90CRQ13)
SLAG COOLER A CHAIN GEAR (30HNA81AF001 MG01)
45 3 145382 No LOA/PTW BOP CONVEYING SYS FOR DRY ASH (90ETG)
46 3 142449 No LOA/PTW U3 HEAT GENERATION (30H)
47 3 142573 No LOA/PTW BOP TREATMENT OF ANOTHER FUEL SYS FOR LIMESTONE BIN 1 SYS
48 3 142455 No LOA/PTW (90EPC10) BELT CONVR 1A (90ENC10AF003)
LIMESTONE
49 3 142972 No LOA/PTW U3 HEAT GENERATION (30H)
50 3 143040 No LOA/PTW U4 CONVEYING SYS FOR DRY ASH (40ETG)
51 3 149861 No LOA/PTW U3 AD BNR1 (30HJA21AV001)
52 3 146232 No LOA/PTW BOP CONVEYING SYS FOR DRY ASH (90ETG)
53 3 143202 No LOA/PTW U3 PA FAN LUBE OIL STATION SYS (30HLX)
54 3 143906 No LOA/PTW U4 CONVEYING SYS FOR DRY ASH (40ETG)
55 3 147525 No LOA/PTW CF A BELT CONVR (30HFB11AF001)
56 3 147323 No LOA/PTW CF B BELT CONVR (30HFB12AF001)
57 3 144739 No LOA/PTW U3 BLR RADIATION SECTION (30HMB)
58 3 144736 No LOA/PTW U3 TURB SYS (30M)
59 3 141507 No LOA/PTW U4 BLR RADIATION SECTION (40HMB)

60 4 141508 No LOA/PTW DM WTR MECHANICAL CLEANING SYS (90GCB)


61 4 109997 No LOA/PTW BOREWELLS (93GV)
62 4 135100 No LOA/PTW SLAG COOLER A CHAIN GEAR (40HNA81AF001 MG01)
63 4 151791 No LOA/PTW U4 HEAT GENERATION (40H)
64 4 148623 No LOA/PTW U2 SAMPLING & ANALYSIS CONDENSATE PMP SYSSS (20QUC)
65 4 142169 No LOA/PTW U4 BLR RADIATION SECTION (40HMB)
66 4 149009 No LOA/PTW U1 SAMPLING & ANALYSIS CONDENSATE PMP SYSSS (10QUC)
67 4 142570 No LOA/PTW U4 HEAT GENERATION (40H)
68 4 145383 No LOA/PTW INDUSTRIAL WASTE WTR SYS (90GN)
69 4 142973 No LOA/PTW U4 HEAT GENERATION (40H)
70 4 149996 No LOA/PTW U4 AD BNR1 (40HJA21AV001)
71 4 143312 No LOA/PTW U4 PA FAN LUBE OIL STATION SYS (40HLX)
72 4 146979 No LOA/PTW CF B BELT CONVR (40HFB12AF001)
73 4 147425 No LOA/PTW CF A BELT CONVR (40HFB11AF001)
74 5 144910 No LOA/PTW BOP IG 541 FFS 2 & 3 (92SGM)
75 5 145496 No LOA/PTW BOP UNIT DRAINAGE PIT TRANSFER PMP 1 SYS (90GNK21)
Name Start
Service Air Compressor-14 2/1/2019
Preventive Maintenance of CEMS System Unit # 1 and 2 2/5/2019
Preventive Maintenance of Local Pannels & Instruments_FBHE & Seal Pot Area Unit # 1 2/6/2019
Preventive Maintenance of Coal Feeders_A_Unit # 1 2/7/2019
Preventive Maintenance of Slag Cooler A Unit # 1 2/8/2019
Instrument Air Compressor 2 with dryer 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 13 Meter Area Unit # 1 2/8/2019
Preventive Maintenance of Coal Feeders_B_Unit # 1 2/12/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 9 Meter Area Unit # 1 2/13/2019
Service Air Compressor 3 2/15/2019
Instrument Air Compressor 3 with dryer 2/15/2019
Preventive Maintenance of Air Duct Burner 1, 2, 3, 4 for Unit 1 2/15/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 0 Meter Area Unit # 1 2/15/2019
Service Air Compressor-15 2/20/2019
Service Air Compressor-4 2/22/2019
Service Air Compressor-16 2/22/2019
Preventive Maintenance of Local Pannels & Instruments for Turbine 0 Meter For Unit # 1 2/28/2019

Preventive Maintenance of Coal Handling Plant Belt 8 2/1/2019


Testing of Protection Instruments in Coal Handling Plant Belt 4 Stream A 2/1/2019
Preventive Maintenance of Local Pannels & Instruments_FBHE & Seal Pot Area Unit # 2 2/6/2019
Preventive Maintenance of Coal Handling Plant Belt 4 Stream B 2/7/2019
Preventive Maintenance of Coal Handling Plant Stacker Reclaimer PLC and Cabinets 2/8/2019
Preventive Maintanance of Dust Separation System Coal Handling Plant Tower 3 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 13 Meter Area Unit # 2 2/8/2019
Preventive Maintenance of Coal Feeders_A_Unit # 2 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 9 Meter Area Unit # 2 2/13/2019
Preventive Maintenance of Slag Cooler A Unit # 2 2/15/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 0 Meter Area Unit # 2 2/15/2019
Preventive Maintenance of Air Duct Burner 1, 2, 3, 4 for Unit 2 2/15/2019
Preventive Maintenance of Coal Feeders_B_Unit # 2 2/15/2019
Preventive Maintenance of Coal Handling Plant Belt 1 Stream B 2/20/2019
DCS System and Historian Backup Unit -2 2/20/2019
Preventive Maintenance of Coal Handling Plant Belt 3 Stream B 2/20/2019

Preventive Maintenance of Lime Stone System PLC Panels 2/1/2019


ESP SYSTEM PLC Backup Unit 3 2/4/2019
ESP SYSTEM PLC Backup Unit 2 2/4/2019
ESP SYSTEM PLC Backup Unit 1 2/4/2019
ESP SYSTEM PLC Backup Unit 4 2/4/2019
Preventive Maintenance of Local Pannels & Instruments for Ash Handling ESP Row 1,2,3,4 &5 2/5/2019
For
CoalUnit # 1system PLC software back up ( Siemens S7 200 )
Runoff 2/6/2019
Coal Runoff system PLC software back up (Ge Fanuc Plant (Rx3i)) 2/6/2019
Preventive Maintenance of Local Pannels & Instruments_FBHE & Seal Pot Area Unit # 3 2/6/2019
Coal Runoff system PLC software back up (Dust evacuation System (Versamax) 2/6/2019
Preventive Maintenance of Slag Cooler A Unit # 3 2/8/2019
Preventive Maintenance of Local Panels & Instruments for Ash Handling Bed Ash Silo B & C 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 13 Meter Area Unit # 3 2/8/2019
Preventive Maintenance of Lime Stone System Bin, Crusher, Conveying System 1 and dust 2/8/2019
separation
Preventive system
Maintenance of Lime Stone Belt 1 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 9 Meter Area Unit # 3 2/13/2019
Preventive Maintenance of Local Pannels & Instruments for Ash Handling ECO & APH For Unit # 2/14/2019
4
Preventive Maintenance of Air Duct Burner 1, 2, 3, 4 for Unit 3 2/15/2019
Preventive Maintenance of PLC Pannels Ash Handling Plant 3&4 2/15/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 0 Meter Area Unit # 3 2/15/2019
Preventive Maintenance of Local Panels & Instruments for Ash Handling Bed Ash Silo A For Unit 2/22/2019
# 4
Preventive Maintenance of Coal Feeders_A_Unit # 3 2/22/2019
Preventive Maintenance of Coal Feeders_B_Unit # 3 2/22/2019
Preventive Maintenance of Local Panels & Instruments_Lime Stone Silo, Conveying & Dust 2/28/2019
Separation System Unit #
Preventive Maintenance of3Local Pannels & Instruments for Turbine 0 Meter For Unit # 3 2/28/2019
Preventive Maintenance of Local Panels & Instruments_Lime Stone Silo, Conveying & Dust 2/1/2019
Separation System Unit # 4
Preventive Maintenance Of WTP, SWTP, IWTP Analysers and Caliberation 2/1/2019
Preventive maintenance of BOREWELLS_Z12673 & ZI2672 2/1/2019
Preventive Maintenance of Slag Cooler A Unit # 4 2/1/2019
PM of U#4 Purging System Status Monitoring 2/5/2019
Preventive Maintenance of SWAS System Unit # 2 2/5/2019
Preventive Maintenance of Local Pannels & Instruments_FBHE & Seal Pot Area Unit # 4 2/7/2019
Preventive Maintenance of SWAS System Unit # 1 2/8/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 13 Meter Area Unit # 4 2/8/2019
Preventive Maintenance of Water Treatment Plant, Industrial waste water & Sewage Treatment 2/8/2019
Plant PLC Panels
Preventive Maintenance of Local Pannels & Instruments_Boiler 9 Meter Area Unit # 4 2/13/2019
Preventive Maintenance of Air Duct Burner 1, 2, 3, 4 for Unit 4 2/15/2019
Preventive Maintenance of Local Pannels & Instruments_Boiler 0 Meter Area Unit # 4 2/15/2019
Preventive Maintenance of Coal Feeders_B_Unit # 4 2/20/2019
Preventive Maintenance of Coal Feeders_A_Unit # 4 2/22/2019
Preventive Maintenance of IG541 Unit3,4 and Common system 2/1/2019
Preventive Maintenance of Local panels & Instrumets for Common Sump pump A & B 2/8/2019
Proposed start date Remarks
2/7/2019
2/6/2019
2/6/2019
2/8/2019
2/8/2019
2/8/2019
2/8/2019
2/12/2019
2/11/2019
2/12/2019
2/15/2019
2/13/2019
2/14/2019
2/20/2019
2/22/2019 same date two
2/22/2019 Service Air
Compressor PM
2/18/2019

2/1/2019
2/4/2019
2/6/2019
2/7/2019
2/8/2019
2/7/2019
2/5/2019
2/8/2019
2/11/2019
2/15/2019
2/12/2019
2/13/2019
2/15/2019
2/14/2019
2/18/2019
2/18/2019

2/1/2019
2/4/2019
2/4/2019
2/4/2019
2/4/2019
2/5/2019
2/6/2019
2/6/2019
2/6/2019
2/6/2019
2/8/2019
2/7/2019
2/11/2019
2/12/2019
2/13/2019
2/15/2019
2/14/2019
2/15/2019
2/18/2019
2/19/2019
2/20/2019
2/22/2019 Same date tow
2/22/2019 Coal feeders PM
2/25/2019
2/26/2019
2/1/2019

2/1/2019
2/4/2019
2/4/2019
2/5/2019
2/6/2019
2/7/2019
2/8/2019
2/11/2019
2/12/2019
2/13/2019
2/14/2019
2/15/2019
2/20/2019
2/22/2019
2/1/2019
2/8/2019