Professional Documents
Culture Documents
This spreadsheet workbook used for the analysis of precast concrete standard, which referred to ACI 318-
2014. The spreadsheet is designed to find the capacity of connection beam-column & column-foundation of
precast concrete structures.
Spreadsheet Operation
CALCULATION FOR
PRECAST CONCRETE DESIGN
DOCUMENT NO. :
C-XXXXX-XX-1310-00X-X
A 12.02.2014 Issued For Internal Review Agus M Eni SWA
###
AUTHORIZED
JOB NO. : - REV
CALCULATION FOR DOC. NO. : A
1 GENERAL
1.1 Scope …………………………………………………………………………… x
1.2 Applicable Codes & Standards …………………….……………………… x
1.3 Conflict of Standard ……………………………………..…………………… x
1.4 Design Basis and Assumption ……………………………………..……… x
2 MAJOR MATERIAL
2.1 Concrete…………………….…………………………………………………… x
2.2 Reinforcing Steel Bar…………………….………………………………….. x
2.3 Steel Plate …………………….……………………………………………. x
2.4 Welding Electrode……………………………………………………………… x
3 ALLOWABLE STRESS
3.1 Base Strength of Concrete …………………………………………………… x
3.2 Base Strength of Reinforcing Steel Bar …………………………… x
3.3 Base Strength of Steel Plate ………………………………………………… x
5 ATTACHMENT
1 Table: Summary of Calculation
2 Drawings
REV
A
APVD
SWA
PAGE
Splice Joint for Precast Concrete Beam
1. Description
"A" 50
50 75
h
A
ROUGHENED SURFACE
2. Design Theory
Development length, ld
fy Ψt x Ψe x Ψs x λ
ld = x
1.1 x (f'c)0.5 cb + Ktr
db
40 Atr
Ktr =
sxn
3. Design Table
Material
Fy = 420 mpa
F'c = 30 mpa
h b db dbtr cc n cb s Ψt
mm mm mm mm mm mm mm
500 300 22 10 50 4 26.33 100 1.3
500 300 25 10 50 4 25.83 100 1.3
500 300 29 10 50 4 25.17 100 1.3
500 300 32 10 50 4 24.67 100 1.3
SECTION A
1. Description
1-50 PVC SLEEVE HOLE
TO FILLED WITH NON-SHRINK GROUT
PRECAST CONCRETE BEAM
20 130 (PINNED CONNECTION)
50
30 GROUT
5 - D16
500
300
2. Design Theory
av
Bn = 0.85 x f'c x A1
Bu = φ x Bn
b. Shear Capacity
c. Tensile Capacity
Nu / φ = An x fy 5 16 172.2699 146.4293823
d. Flexural Capacity
3. Design Table
Material
Fy = 420 Mpa
F'c = 30 Mpa
Corbel
Where:
Asc = Area of primary tension reinforcement in a corbel or bracket = A f + An
Ah = total area of shear reinforcement parallel to primary
tension reinforcement in a corbel or bracket
= 0.5(Asc - An)
D1 = Diameter of main bar
D2 = Diameter of Stirrup
D3 = Diameter of Anchor
n1 = Number of main bar
n2 = Number of stirrups
φVcb = Shear Capacity of Anchor
(ACI 318-14, Table 14.5.6.1)
Stirrup Anchor
n2 D2 D3 φVcb An Asc Af Mu
mm mm kN mm2 mm2 mm2 kN.m
4 10 29 14.32 34.09 1005.31 971.22 123.89
4 10 29 14.32 34.09 1005.31 971.22 124.57
4 10 29 14.32 34.09 1005.31 971.22 125.11
4 10 29 14.32 34.09 1005.31 971.22 125.56
4 10 29 14.32 34.09 1005.31 971.22 125.93
4 10 29 14.32 34.09 1005.31 971.22 126.25
P H
Min. Area of Stirrup
av Vu1 Vu Bu min(Bu,Vu,1) Nuc Ah
mm kN kN kN kN kN mm2
150 825.91 726.98 1989.62 726.98 14.32 485.61
150 830.45 817.85 2238.33 817.85 14.32 485.61
150 834.09 908.72 2487.03 834.09 14.32 485.61
150 837.06 999.60 2735.73 837.06 14.32 485.61
150 839.54 1090.47 2984.44 839.54 14.32 485.61
150 841.64 1181.34 3233.14 841.64 14.32 485.61
Provided
Ahp
mm2
628.32
628.32
628.32
628.32
628.32
628.32
Minimum Tension Reinforcemnt Check
0.04(f'c/fy)(bw x d)
mm2
485.7143
Precast Column and Foundation Connection with Socket
1. Description
h
PRECAST COLUMN
D1
hp
Lp
B.O.COLUMN
50
GROUT 2X150X150 Wp
SECTION
PLAN VIEW
2. Design Theory
Lp or Wp
h or b
250
tp
D1
D2 - 250
NU
hp
MU
vU
tg
Where: Vu = Factored shear force
Nu = Factored compress forces
Mu = Factored moment
hp = Pocket height
tp = Pocket thickness
Lp = Pocket length
Wp = Pocket width
tg = Grouting thickness
a. Bearing Capacity
Bn = 0.85 x f'c x A1
Bu = φ x Bn
b. Momen Capacity
hp
3. Design Table
Material
Fy = 420 Mpa
F'c = 30 Mpa
Wp
PLAN VIEW
(ACI 318-14, Table 14.5.6.1)
qm qv
qm
FLEXURAL AREA
VERTICAL REBAR
Momen
Capacity External Load RESULT
Mp Mu Vu Nu Mu + (Vu(hp/2)) Bu Check
kN.m kN.m kN kN kN.m kN Moment
66.93 25.00 10.00 100.00 28.00 2652.00 OK
75.42 25.00 280.00 100.00 109.00 3356.44 Not OK
122.61 25.00 280.00 100.00 109.00 4143.75 OK
58.30 25.00 280.00 111111.00 109.00 5013.94 Not OK
58.62 25.00 280.00 100.00 109.00 5967.00 Not OK
58.90 25.00 280.00 100.00 109.00 7002.94 Not OK
RESULT
Check Note
Compress
OK
OK
OK vert. Rebar space is too close, Revise number of Rebar or Increase Diameter
Not OK
OK
OK
Shear Plane