Professional Documents
Culture Documents
Development program
Week 3 booklet for trainees
Devenir Green Belt
Start on time !
No side conversations !
Everyone participates !
Teaching Retention
Techniques Rate
Listening is not
Take notes in enough
your book Listening 5%
We will be
Reading 10% watching video
Apply to your
Discussion Group 50%
situation
Take opportunities to
Practice with Feedback 75% teach tools to your
team
Teach Others/Immediate Use 80%
Be open
« we are all beginners, there are no taboos»
Be curious
« You are going to learn new methods. Some tools are more for
manufacturing while others are more for cross-functional activities. All tools
may be helpful to you »
Interaction:
« It’s not a teacher in front of students, so … participate ! »
« Don’t be shy ! Ask questions, ask, and ask again! There is no shame in
asking for clarification »
« It’s your training : it’s your chance to learn… »
Timing
Start ?
End ?
Constraints for the last day
Lunch
Time & duration
Logistics (where, how)?
Breaks
How many?
How long?
Who is the
Time Keeper ?
1. Lean Forward
Lean transformation
3. Power Tests
4. Case Study
Introduction &
feedback on
Green Belt content
MEASURE & ANALYZE MEASURE & ANALYZE
Lean
Hypothesis Hypothesis
Transformations
testing testing
Lean Transformations
EXERCISES
Practice with Minitab on
MEASURE & ANALYZE a simulation
Flow chart Hypothesis
Lean Transformations
Practical application testing SAMPLING
Power
Conclusion
Introduction &
ANALYSE
reminders week 1
Design of Experiments
MEASURE (DoE)
CASE STUDY
Long term capability
DMAIC
Coaching Non-normal distributions
Exercise
Green Belts
Rituals and Posture Multiple Regression
Time
2010
It’s a mindset!
DMAIC Lean
Projects Transformations
Why a DMAIC?
To solve a problem involving one or more processes
Why a Lean Transformation?
Applied at the level of a service. The problem(s) is/are initially unknown.
Empowering a service to put itself in position to boost its performance:
Load/capacity analysis (removal of redundant tasks and better distribution of other tasks)
Implementing good steering indicators for managers and for the team (removing unnecessary
indicators) (WPR/QPR is one of the tools)
Identifying the main issues and prioritizing them:
Part of these issues will be addressed within the Lean Transformation framework
The rest will lead to a Progress Plan which will be implemented by the head of the service
• Giving Meaning
• Skills Development
• Problem Solving
Operational
System
Mindset &
Behavior
14 weeks
There are specific criteria for choosing a Lean Transformation to maximize its
chances of success
1. Setting up the team 2. Communicating 3. Data collection 4. Diagnostic planning 5. Identifying specific issues
Metsec Metstrut - Lean Operations
OEE Summary
Completed
% hours • Focused equipment • SMED activities to
improvements support sequence
• Root cause problem and reduce lead time To start
solving
• Problem
identification and
11
waste removal
25
• Performance monitoring
• Standardisation of
machine parameters
100 24
9
64 2
31 29
Available Break Change Operating Minor stop Speed Running Scrap Value
time down over time Losses Time added Time
Source: Team 42
Method
Groups of 4
Brainstorming = 15’
Reporting = 5’ per group
DDD 100%
The Black Belts /
Check
If there is consensus within the team as to the understanding of the purpose
and scope
If there are gray areas, have the sponsor define them
• •
• •
Risks Prerequisites
• •
Animation
The leader conducts the session
Send invitations out for regular meetings during the Lean Transformation
Weekly Steering Committee meeting
Daily meetings with the project team
1.2. COMMUNICATE
Completed
CASE IN PRODUCTION
• Root cause problem and reduce lead time To start
solving
• Problem
identification and
11
waste removal
25
• Performance monitoring
• Standardisation of
machine parameters
100 24
9
64 2
31 29
Completed
25
• Performance monitoring
• Standardisation of
machine parameters
100 24
9
64 2
31 29
Available Break Change Operating Minor stop Speed Running Scrap Value
The team
time down over time Losses Time added Time
Source: Team 42
The mandate
1st week
MIFA Spaghetti 5S Active Maintenance Quality Survey
VSM Diagram Evaluation Observations Assessment Assessment Questionnaire
Focus Questionnaire Organization Steering DILO A.M. Cycle Diagram Client’s Voice
Group Analysis Analysis system gaps C.D.L. AM - CDL Questionnaire
2nd week
Logistics Data Load/Cap. Cycle/WIP/Rea Takt Time OEE Mix Model
OEE Analysis
Analysis Graph l Graph Line pace Formatting Map
Skills -
List of invest., relocation, HR HR mapping (position SSE
Value Tree Training
project, DMAIC, 8D I/P Assessment changes) Assessment
Matrix
3d week
Saving
Additional Progress Training List of Quantified Scope
Indicators,
Observations restraints Requirement blockers Levers Validation
Baseline
2. Diagnostic
3. Vision
4. Planning
5. Implementation
6. Sustainability
Management
Infrastructure
Operational
System
Mindset &
Behavior
Case study 1: engineering (design engineers Case study 2: Machining and assembly
+ designer) line of aircraft components (dozens of
Your mission is to reduce the volume of operations carried out in the workshop)
subcontracted activity by 20% Your mission is to reduce the output
time by 50% (from 12 weeks to 6
weeks)
Method
Brainstorming
Reporting and debriefing: 5’ per group
Everyone
belonging to
the sector
Everyone
belonging to
the sector
Management
Infrastructure
Operational
System
Mindset &
Behavior
Everyone
belonging to
the sector
ALL
VSM (mapping)
VOC Planning Interviews Observations Non Quality
Management
Infrastructure Steering Meetings
System Analysis
Operational
System
Mindset &
Behavior
Motivation
Questionnaire
HR Data
Understand how the operations work and be the owner on the potential
and the improvement levers
Have a simple and factual basis for the diagnosis and the design phase
(including a measure of waste)
Identify the levers to improve directly in the field with operators and heads
of posts
IN CONSTANT TIME
Description
When During the MEASUREMENT phase
Objective Take note of real activities and types of wastes
Highlight opportunities for improvement
Quantify the potential for improvement
Observations Usual daily operations categorizing each task into VA, NVA or Waste.
How I frequently note (using a tally mark system) what the operator does
Note: I am not interested yet in task duration
Deliverables
Graphic
Tally marks summary
Added value
Waste
Any process which can:
All non-essential activities • Change the nature, form or characteristics of a product, in
that the customer is not accordance with the customer's requirements
prepared to pay for. • Bring a service to its realisation
Eg: 7 wastes Eg: machining, assembling, handling a file
should be eliminated! should be maximized
Comments
Information
Input
20% • Xxx
Analysis of
requests
7% • Xxx
WORKSTATION
Help a colleague 13% • Xxx
• Recruiter
Development of
reporting
14% • Xxx
Activities
Checks 6% • Xxx
• Profile
formalization
• Study of Transfers 15% • Xxx
potential files
• Interviews
Corrections 25% • Xxx
Example of problems
NVA BVA VA encountered
John 41% 31% 28% 166 Standards not found in PDM
Parts are no more visible in PDM for
Jack 56% 43% 1% 195
production people
Dept 1
Chris 14% 75% 11% 205
Motion to search information needed
Patricia 47% 41% 12% 174
for work
Liu 27% 54% 19% 182 Meeting not prepared by BA resulted
in loss of time
Wayne 3% 35% 62% 161
Dept 2
Alex 32% 48% 20% 179 Searching how to do some
representations
Patrick 22% 55% 23% 153 Useless mails
100%
IN CONSTANT TIME
▪ Ask about the perception observations ▪ Fail to explain the objectives to the
in the Shop or in the Office. You don’t person being observed
need any timer for this type of
measurement ▪ Interact with the observed worker
during the observation
▪ Take the time to follow the processes in
their entirety ▪ Try to justify the observed
malfunctions
▪ Leave the observed person to act
naturally ("as normal") ▪ Seek to confirm a preconception
▪ Analyze the observed elements in a ▪ Seek the person responsible!
team (after observations!)
▪ Falsify the results
▪ Be factual and critical… in order to
improve the process more efficiently
Comments
• Group of 33 is split into 7 units and 3
leaders
• Risk of silo, lack of team spirit /
Xxx coordination / best practice sharing
Operation Manager Technical activities of leaders interfere
Quality and with their time available to « manage »
Continuous • Are there enough Leaders in the
Improvement department? ME Mgr. has 15 direct
Manufacturing and 4 functional people reporting to
Xxx Engineering Maintenance Production him
Xxx
2 Black Belts
Scope
EXAMPLE
Improvements
Improvements Admin. projects
projects Admin.
16 21
30
36
= 11 Coaching
23
Daily
Performance
13
Management
Daily 4 16 29
Performance HR systems
Shopfloor
Management Shopfloor
& coaching
Less than 20% of the time Problem Over 50% of the time Problem
solving and improving sector’s solving and improving sector’s
daily issues daily issues
EXAMPLE
Monitor
Planning
Messeng
Technical
Budget
Manag
Director
Monito
ement
Coordination Meeting
Hub Manager
ing
Stage
ring
er
dynamics, materials, CAE)
S/T
Coordination
No formal daily meeting
Team B coordination
Team S coordination
Team A coordination
Production
Not held for
Managers
Team Leaders
Program review
3 months
(priorities)
meeting
meeting
meeting
Team
Members
Several
Subcontractors No informal
projectors points
Program
SOURCE: Interviews with hub manager, equipment manager and project managers
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 62
2.4 PERFORMANCE-MANAGEMENT DIAGNOSTIC MI
EXAMPLE IN PRODUCTION
Meeting Frequency
Real Time Daily Weekly Monthly Quarterly
Industrial
Director Steering Co
Director Monthly
Performance
Review (MPR)
Plant Director Weekly
Level
Performance
Review (WPR)
Production Daily
Performance
manager Review
Station End
Supervisor Review (SER)
EXAMPLE IN PRODUCTION
In 2007, overall op. costs were €197M, of which 47% were internal production costs
M€, 2007 IPC revised excluding amortization Personnel 6.0
Capabilities 6.8
Overall Costs Load Shedding
Personnel
197 11.2 Technical 4.4 1.0
Miscellaneous
Validation
requires 1 to 4
DAV
answer Information back and forths
request to
Y DAV
N N Y
File’s Send
Receipt & 1st
Al- N Request Ok Y Files’ analysis Info YJustification Validat Y docu- Ok
-ready
analysis registration ? creation (DR, Maps, Ok? writing ion? ments & DAV?
CMM?
Scrap? CMM, …) close
20d N 4d
N
15d
Missing data in Typos,
the request additionnal
Old programs, Create additionnal
elements demands,
little to no (calculations, oversight
Correction
background technical opinions)
Have a simple and factual basis for the Diagnosis and the Vision stage
Identify improvement levers directly on the field with operators and station
managers
Pas du
Perception
Perception of de
thela
situation of the
situation dudepartment andet
département the
decompany
l'entreprise
Tout à fait Plutôt Plutôt pas
tout
d'accord d'accord d'accord Totally
Totally agree Agree Disagree d'accord
disagree
1. I know the short
Je connais and medium-term
la stratégie strategy
court et moyen of my
terme management
de ma Direction etand
sonits
1
impact on my
impact surdepartment
mon département
2. the
2 Lexxx departmentXXX
département has a une
strong and welded
équipe management
de management forteteam
et soudée
3. The
Lexxx departmentXXX
département provides
fournitservices in line with
des prestations the expectations
conformes of itsde
aux attentes
3
clients
ses clients
Si nous changions nos méthodes de travail, nous pourrions faire des
4
progrès
4. If we significatifs
change our methods of work, we could make significant progress
7. I7think therequ'il
Je pense is any urgent need urgent
a un besoin for change
de changement
8. The
Lemanagement
managementofduthe xxx department
département XXX is stronglyfortement
s'engage committed to improving
pour améliorer
8
the working methods
les méthodes de travail
9. I9can
Je personally contribute tocontribuer
peux personnellement change au changement
10. Mon chef de département passe du temps dans les équipes / plateaux
10My department manager spends time with the teams several times a week
plusieurs fois par semaine
Mon chef de département communique de façon adaptée à mes attentes
11.
11My department head communicates well (frequency, duration, content)
(fréquence, durée, contenu)
12.
12My superiors
Mes set thehiérarchiques
supérieurs example by their behaviorl'exemple par leur comportement
montrent
13. My
Monsuperior and I frequently
supérieur evaluate
hiérarchique thefaisons
et moi progressun
ofpoint
my activities
fréquent sur
13
l'avancement de mes activités (contenu, relationnel, environnement)
14. My superiors
Mes help the
supérieurs team to detect
hiérarchiques and solve
aident problems
l'équipe at the right
à détecter time
et résoudre les
14
problèmes en temps voulu
15.
15I provide data on
Je dispose desa timely
bonnes manner
données d'entrée en temps voulu
18. Les priorités entre les donneurs d'ordre (p.ex., pilote, chef de dpt) sont
18Priorities between deaprtment heads are coherent and structured by hierarchy
cohérentes et structurées par ma hiérarchie
19. There
Il y aisune
goodbonne
collaboration / concentration
collaboration betweenentre
/ concertation colleagues to solve
collègues problems and
pour
19
implement
résoudreimprovement actionset mettre en place des actions d'amélioration
les problèmes
20. Nous sommes aidés et soutenus par les collègues des autres
20We are helped and supported by the colleagues of the other departments to realize
départements
our deliveries and ourpour réaliser
activities nos livrables et nos activités dans les temps
in time
Les moyens mis à ma disposition et le support associé (Informatique,
21.
21The means at my disposal and the associated support (IT, documentation, method,
documentation, méthode, poste de travail…) sont suffisants pour réaliser
workstation ...) are sufficient to work with
Quand un problème survient, il est résolu suffisamment rapidement pour
22When a problem arises, it is resolved quickly enough so as not to disrupt my work
22. ne pas perturber mon travail
23.
23Meetings in whichauxquelles
Les réunions I participatejeare efficientsont efficaces
participe
Pas du
Tout à fait Plutôt Plutôt pas
Gestion
Skills des compétences
management d'accord d'accord d'accord
tout
Totally agree Agree Disagree d'accord
Totally disagree
29. J'ai personnellement mis en place des améliorations pour les tâches dont
29I have personally implemented improvements for the tasks for which I have
j'ai la responsabilité
responsibility and am proudet j'en suis fier
of them
Pas du
Motivation
Motivation
Tout à fait Plutôt Plutôt pas
tout
d'accord d'accord d'accord
d'accord
Totally agree Agree Disagree Totally disagree
32.
32The expectations of my performance are clear and I am satisfied that I
Les attentes de ma hiérarchie en matière de performance sont claires et
je them
meets condidère que ma performance y répond
34.
34Management demands
Le management good
souligne performance
les bonnes performances
Survey Results
Improvement Propositions:
• Sustain personal initiative and teamwork (Team Building, maintain focus groups)
•ThisImprove how of meetings are animated, proximity management, management of priorities
document and the information it contains belong to
•other
Safran. TheyINDUSTRIELLE
Share Black
not be Belt
the vision
must MANAGEMENT
copieddevelopment
for the short,
or communicated to /any
Mini T ITKL
program
person without prior written authorisation from Safran.
andCND3 Delivery - Wave 9 - Sept. Dec. 2011
mid- Week long term
FOCUS GROUPS – CURRENT STATE PERCEPTION M&B
(WORKFORCE SESSIONS) CNC PROGRAMMING
Slow Why?
Not enough
Teamwork
team work
HR Data
2011 HR Makeup
In number of people
3
Studies
2
Calculation • Young segment of research
5 and calculation engineers
4 Projectors
5 Management • Segment of experienced
2 2 1
1 1 designers
1 1 1 1 1
< 22 23 - 29 30 - 36 37 - 44 45 - 50 50 and
over
2010
2009-2011 Mobility 2011
In number of people 0
4 2009 • Regular leaves
2 12 • Personnel incorporated in
1
4
31
2011
22
Customer voice
Analysis of planning/scheduling practices
A mapping of current processes and material/information flow with known
deficiencies
A clear vision of key performance indicators
The detail of the cost base by type and cost centers (if necessary)
A description of the organization, missions and objectives
Assessment of performance management systems and key areas for improvement
Assessment of motivation and work environment (this evaluation is the summary of
a questionnaire, field observations and interviews)
A “baseline” that will be used to set the initial state and measure the improvements
made
An update of the secured-earnings (benefits) scenario
3. Vision
4. Planning
5. Implementation
6. Sustainability
Product
Prod. A 1
Projet Date fin Projet Date fin 1 2 3 4
début début
Nom: 1. 5. 1 = classroom knowledge
Date de début 12/09/2005 2. 6. 2 = applied with support
Date de MAJ 28/10/2005 3. 7. 3 = applied with confidence
4. 8. 4 = can train others
Identifier et
Résolution de Structurer un Agilité avec
décrire un Synthèse
problème problème Excel G
problème
Communication
Structurer une Agilité avec Mener une Mener une
orale /
Communication H
Product
Prod. B 2
communication Powerpoint réunion efficace interview
Présentation
Mener le changement
Lancer un projet
d'équipe constructif équipe projet I
Product
Prod. C 3
des autres
0 0 0 0 0 0 0 0
Tenir Pousser à
Volonté: Energie Apparaître
fermement ses l'amélioration Etre positif
énergétique L
et impact positions continue
Bien recevoir le
Professionnalism Fiabilité sur les Ponctualité et
feedback et agir 0 0 0 0 0 M
actions à faire préparation
e en fonction
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 2 3 4 5 6 7 8
“Toward”
The path followed by the simultaneous
implementation of Levers 1 + 2 + 3...
Progress plan
“From”
From… … to
Portal - Supply of Equipment. 1 only the equipment storage area: centralized, with
Stock equipment and unloading in the process of identified drawers and Visual mini stocks
change and non-sized areas. limit the manipulations (kitting or other...)
No of inserts A 5s Standard - zone storage, production, quality and
Research of tools for mounting management of updates to dispose of the inserts.
Many manipulations Transfers of funds limited
Coils R Us FAL
WEEKLY FAX MRP DAILY EXPEDITE
Customer Requirements 16
500 M COILS 320 PIECES/MONTH
Pieces/Day
200 A1 120
WEEKLY PLAN A2
2 SHIFTS
PACK SIZE = 1
TUESDAY &
THURSDAY
DAILY
SHIPPING
PLAN 1 x DAILY
I I I I I I
STAMPING SPOT WELD 1 SPOT WELD 2 ASSEMBLY 1 ASSEMBLY 2 SHIPPING
5 DAYS 150 A1 24 42 A1 6 16 A1 42 A1 6 27 A1
A2 A2 18 A2 A2 14 A2
10T
C/T = 1 MIN C/T = 39 MINS C/T = 46 MINS C/T = 62 MINS C/T = 40 MINS
UPTIME = 85% UPTIME = 100% UPTIME = 80% UPTIME = 100% UPTIME = 100%
1x 1x 1x 1x 1x
PRODUCTION
4,600 10,028 2,760 1,932 2,760 2,392 LEAD TIME = 26.8
MINS MINS MINS MINS MINS MINS DAYS
VEX en M€ •
•
Result Indicators
Nb DA/j •
•
Nb irritants •
par j
Source: Orphoz
Source: Orphoz
Source: Orphoz
• A macro schedule is
generated following
prioritization of actions
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 89
3 4
PRIORITIZATION IS AN AID IN ESTABLISHING THE SCHEDULE
Include:
• Important messages:
• Presentation of diagnosis and vision teams
• The celebration of results
• The teams training plan
• Steering committees and other milestones of the
Low Effort High transformation
To start as soon as
Discard
possible Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 90
PITFALLS TO AVOID DURING THE VISION WORKSHOP
Error Consequence How to avoid it
• The reference level of •Impossible to quantify the • Establish the level of performance
performance was not clearly impact of the transformation before the transformation through
defined evidence based analysis and identify
key indicators compared to the
problem
• Participants are not aligned on •Endless discussions will • Create a summary of the diagnostic
the results of the diagnosis or on create difficulty to recognize page with the key indicators of
the level of performance that the vision impact monitoring on which one can
serves as a reference before the see the baseline /stating point
transformation
• The “post-its” vision is not •Impossible to create concrete • The facilitator should ask the
sufficiently specific, no numerical actions and risk of different participants to quantify or specify the
target interpretations, no point when necessary
measurable impact
• The facilitator does not offer •The vision does not include • The facilitator prepares his/her own
his/her own vision all the topics of the diagnosis vision and participates in the
exercise to ensure that all issues
recognised during the diagnosis are
addressed
MI
• A dimension is not taken into •The change has no impact or • The facilitator ensures that all
OS account in the transformation does not reduce any time dimensions of the transformation are
M&B
taken into account
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 91
30’
You are invited to the workshop of the Lean
Transformation.
The simulation begins after the
brainstorming
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
other person without prior written authorisation from Safran. 92
EXPECTED DELIVERABLES FOR THIS EXERCISE
Priorisation
• For each theme or project, the post-its are
prioritized using the matrix Benefit / Effort
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 93
EXERCISE - DIAGNOSIS SUMMARY
2014 J F M A M J J
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 94
POST-ITS TO EVALUATE
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 95
Notes:
OS
• The assembly line is balanced • We will ultimately automate the
• Must standardize operations packaging
• Format changes do not exceed 15 minutes and
the color changes 5 minutes
• We will reduce waste on the machine bottleneck
from 10% to 7%
MI
M&B
• Visual charts in the workshop have all monthly
objectives
• Supervisors understand the importance of using
the ideas of the operators to find new solutions
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 99
LIST OF THEMES FOR THE NEXT 7 WEEKS
MI
Performance Management
• The production, quality, safety is measured daily at the workshop level (quantity produced,%
good products, number of accidents)
• A message missing from the diagnosis:
• A meeting between supervisor and operators will be held regularly
M&B
• Visual charts in the workshop have all monthly objectives
• Supervisors understand the importance of using the ideas of the operators to find new
solutions
Source: Orphoz
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
other person without prior written authorisation from Safran. 100
MACRO-PLANNING AND PRIORITIZATION
Line productivity Machine productivity Performance management
Benefit
Benefit
7
4. Planning
5. Implementation
6. Sustainability
2. Prepare the weekly follow- 3. Communicate the vision and 4. Train team members for
1. Set up the work plan up meeting work plan to operatives implementation
Month March April May Team members with the necessary availability
Activity 03.15. 03.22. 03.29. 04.05. 04.12. 04.19. 04.26. 05.03. 05.10. 05.17. 05.24. Leader
Label Member 1
…..
Label
Label
Label
Label
Label
Label
Label
This document and the information it contains belong to
Safran. They must not be copied or communicated to any
Black Belt development program - Week 3
Label
other person without prior written authorisation from Safran. 104
1. Établir le plan de travail
Deliverables Gains
xx/7/10
Orga internal ICE 23/7/10 Nature of gain: remove the rework
Earnings: x ETP * y% = 200h
Orga vs workshops 6/7/10 Capture: realization of other
Mission cards 6/7/10 business activities
Procedure 3/9/10
Comm. 30/9/10
4.1 MACRO-PLANNING
March
April May
Activity 29. 05. 12. 19. 26. 03. 10. 17. 24. Operatives
HSE
HSE SRT/AMs
5SDrilling Lathing offices LME/AMs
Standar XO
Operator’s organization d Rotations SRT
Agenda
Continuous
Performance management FPR QPR Audit SRT/AMs
monitoring
Score card
1
Productivity
8/4/10 - 21/4/10
M1N Model M1N
Equipment Audit SPT/BMT/SVF
4 CUs Implementation
Selection of means
Making a means reliable FMEA BMT/ SPT
Worksh
Stocks and in-progress/lots Stocks MBD
op
In-progress areas def.
areas
Target implementation JRT AMs
Visual management 3 Line Cell Label
Flow
In-progress monitoring
Getting started
Stop
5
Anomaly management anomal Application RMO
Why's
y
Color according
to the lines of
work
Mandate
s
1 line per Action: Page background
worksite computerized for use? (There is
a week grid model in A0 format)
Site manager +
backup and
actors
When: if possible provide the systematic training for TRS & TRG
personnel further upstream and for others before beginning Flows & Just on time
of worksite. MIFA
Visual management
Problem Solving
By whom: people who understand the subject and apply it on Change Behaviours
a daily basis or experts rather than the Lean Transformation Cars Game
BBs (they bring a vision from outside the Lean Aircraft Game
The work plan should reflect the priorities identified in order of importance
5. Implementation
6. Sustainability
Sample Distribution
"Voice
of the
customer"
LSL USL
Standard deviation
LCL UCL
5.1 IMPLEMENTATION
A DISASTER SCENARIO?
A navigation system
Tools that tells us our
position at all times
Action levers
A dialog on performance and
robust processes to ensure that
actions are carried out
This document and the information it contains belong to
Black
Safran. They must not be Belt
copieddevelopment
or communicated to program
any - Week 3
other person without prior written authorisation from Safran. 114
Source: McKinsey
2. Implement performance management
and Problem solving
5.2 PERFORMANCE MANAGEMENT
MAIN ENERGY SOURCE OF A LEAN TRANSFORMATION
1. Define
relevant key
indicators
5. Measure the
effectiveness of
solutions and Performance 2. Develop
recognize Management ambitious but
achievements realistic
forecasts
4. Resolve
problems 3. Monitor
performance
Or
Self-management
Genshi Genbutsu
Organization
“I'm going to the is focused
“I'm going help find a and set on
“Reporting solution” learning
“I’m going there to
Situation a problem”
there to understand”
observe”
• Significant risk of • Operators’ • Going deeper with the • Confidence in the • Willingness to learn and
Impact bad decision and motivation 5 why’s power and the will to grow from top
execution • Increased confidence make a difference management to
• Limited confidence in the help the operators
manager can provide
Act fast, act well, act little and act as a team, rather than slowly, perfectly, alone
and... never
Level 3 Illustration
Level 3 planning serves as the
basis for the development of
detailed planning
Weekly Grid
Level 4 Illustration
3C BOARD
CONCERN, CAUSE, COUNTERMEASURE
CAUSE
CONCERN
"5 Why's"
COUNTERMEASURE Priority Date Statut ScM CdP
How Table 3C works:
• Each malfunction is
reported in Table 3C; its
resolution occurs outside
the QPR
Animation/Planning 3C animation
• Fills Post-it’s and keeps them updated. • Mentions problems
Participates answering the three points: • Details, outside of the meeting, the
• What did I do yesterday? problems noted in Table 3C
Operative • What am I doing today?
• The problems I encounter and their
impact on deliverables
• If OK, no need to go into details
Animation/Planning 3C animation
• Initiates and coordinates the QPR • Points out in the meeting the problems that
• Careful not to exceed 15 minutes were reported
• Eventually identifies outside the meeting
the necessary elements: date, person
Manager in
responsible, counter-measure
Charge
• Follows daily the progress of identified
problems
• Decides to escalate the blocking points
Activities • The total time of the activities is the weekly time available per person (35h,...)
• Planned support activities (meetings, knowledge capitalization, etc.) are also noted on a Post-it
• Each Post-it corresponds to a clearly defined deliverable
• Unplanned activities are monitored through Post-it’s in a different color (pink)
• This meeting doesn’t last more than 15 min
• Details of activities are not addressed in this meeting
Steering • All issues raised are transferred to the 3C
• The target date for troubleshooting/escalation is defined
• The detailed planning session must be held outside the QPR (that is the subject of the WPR)
Before After
Baseline s44 s45 s46 s47 s48 s49 s50 s51 Dec-11
Baseline s44 s45 s46 s47 s48 s49 s50 s51 Dec-11
PDA dealt with in less than DMP dealt with and cumulated backlog (counting)
5 days (%) 88 Comments 125 122 Comments
57
67
• The service rate on 94 • Even with a noticeable 66%
PDAs has improved 69 +66% improvement in treated
24
and reached the 53 DMP, the backlog remains
20 initial goal (90%) 32
22 high (122 DMP) (strong
6 increase of the requests on
Aug Sep Oct Nov Dec T1 2011 T2 2011 T3 2011 T4 2011
the timeframe)
6. Sustainability
Total
Audit DAC
LSF
Risques
Procédures
indicateurs
processus
Pilotage
rt
S
l
r
I
P
ct
ex s
ta
es
C
ou
fA
N
er
e
S
ils rne
R
tra
To
ut Lit ig
O
C
rn
E
ff
iv
re
on
e
TI
te
re
t
A
in
C
ils
LE
ut
E
O
O
D
Objectives:
15% gain in efficiency
INCORPORATED ACTIVITIES
Who
Estimated hours/week Secured Current (QPR)
QA Procedures Procedures DL 19 9 9
QA Steering process training process DL 1
QA DAC audit DAC audit DL 6 4
External supplies E. Supply Buyers training AH 1 1 1
Internal tools SPM SPM AH 2 1 1
Penalties Penalties Billing of penalties LF 2 2
Progress Lean worksite Lean worksite PC 13 9 9
Management Management Management CG 11 6 6
Management Management Activities steering MR 13 6 3
Management Management Activities steering JLB 6
Project participation Project participation All 9 9 9
CAPA REDUCTION
PL 0 6 6
Progress MACH worksite MBB LF 0 9 9
TOTAL GAIN 81 63 54
481 17% 13% 11%
Improvement
leverages End of the worksite actions Status Comments
1 • Development process • Set the projects’ review (including the alert process) • Done except for the A350,
A320NEO & A400M
• Set the calculation’ reviews • PDR postponed training
postponed up till January
• Use DOORS for the KC-390 project 17th
2 • Activities planning & • Set the integrating planning and prioritize teams’ activities
prioritization • Activities and standard times library
3 • Cycles reduction for • Secure the incoming data for PDA processing
Support in service • Cut the PDA backlog
activities
Operational
System 4 • I.T. Tools • Replace I.T. tools • Program established,
positions changes
happening till the end of
May 2012
5 • Work Tools • Create and communicate the list of calculations methods,
their scope and maturity
6 • Data access • Scan the necessary plans • 30% received; 30% being
scanned; 30% missing
Level 1:
Prerequisite to Level 5
Level 0 Level 2 Level 3 Level 4
Lean The Target
Transformation
CI CI
Lean Transformation
In the absence of Lean
The road map will Transformation, the Lean Transformation should
be to develop the road map will seek to help us achieve level 4 by
tools needed to establish what is ensuring breakthrough
reach level 1 needed to move toward progress
level 2
Nom: DATE:
Pérennisation
et appropriation
Flux interne 1 2 3 4 5
acquises
Pérennisation
et appropriation
MRO 1 2 3 4 5
acquises
Pérennisation
et appropriation
63 Irritants mini-t 1 2 3 4 5
acquises
Pérennisation
Training/coaching to be conducted: et appropriation
acquises
1 2 3 4 5
Pérennisation
et appropriation
1 2 3 4 5
acquises
Pérennisation
et appropriation
acquises 1 2 3 4 5
Pérennisation
Pérennisation
et appropriation
Define planning acquises
1 2 3 4 5
Pérennisation
et appropriation
Plan de formation 1 2 3 4 5
acquises
Training plan
To define and build as needed September 30, 2011
An audit plan stating when and by who the scope will be audited
Lean
Progress plan - ASS
Transformation
Performance
After-sales service
SPS – Road Map
Change Block SPS
After-sales service Continuous Progress
Target Worksites
SPS – Road Map
Continuous Progress Change Block Reducing
Variability (flow or NQ)
Lean Transformation
Performance Steering
Year