CONSULTANCY SERVICES FOR "FEASIBILITY STUDY AND DETAILED DESIGN (ROAD,BRIDGES & CULVERTS) FOR PROPOSED ROAD EIDMONEY TO CHOWFALDANDI BRIDGE APPROACH (APPROXIMATE LENGTH 18.00 KM TO 25.00 KM)" EXTENDED UPTO COX'S BAZAR (REVISED LENGTH 36.900 KM) UNDER COX'S BAZAR ROAD DIVISION (0+000 CHAINAGE AT COX'S BAZAR)
Four Laning of Andhra Pradesh/ Tamilnadu Border To Nalagampalli FROM Km.133.36 TO Km.171.59 OF Nh-4 Under Nhdp-Phase-Iv in The State of Andhra Pradesh Design Aid