You are on page 1of 1

NOTES.

A. DETAIL ORNAMEN B. DETAIL HURUF TIMBUL

PROJECT NAME.
150
MAINTENANCE
150
PUSKESMAS SETU II
150
(Pekerjaan Renovasi & Pengecatan)

OWNER/CLIENT.
200
100
4500 3625 2750
PUSKESMAS SETU II

UPT PUSKESMAS 200


500 KONSULTAN PERENCANA.
Hollow 30 x 3 0 x 1.7
SETU II
Las
DETAIL UKURAN DEPAN DETAIL UKURAN HURUF TIMBUL PT. Alpha Central Consultant
3625
Skala 1: 100 KONSULTAN PENGAWAS.
Skala 1: 50
1200 ACP Seven
3035 Sparkling Green
thk 3mm

200 Dinabolt PELAKSANA.


200
1000 Dinding Dynabolt
520 200 25

700 700 700 Stainless steel


200
thk 8mm
Dinding
APPROVAL.
2050 No. Date Approved by.

2800 2400
DETAIL POT HURUF TIMBUL
DETAIL RANGKA ORNAMEN Skala 1: 25
Skala 1: 50
DRAWING BY.

DETAIL UKURAN SAMPING RESYA ASTIN FARHANI, S.ARS


Skala 1: 100
DRAWING TITLE.

DETAIL ORNAMEN & HURUF TIMBUL

DRAWING NO.

001/DRAW/ACC/XI/2021

SCALE. PAGE NUMBER.

1 : 100 , 1 : 50 , 1 : 25 002

You might also like