Professional Documents
Culture Documents
TRUE
PLANT
NORTH
NORTH
A
A
B
B
KEY PLAN
NOTES:
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
INSPECTION
C C
OUTFALL CHAMBER
E E
F F
. . . . . . .
. . . . . . .
. . . . . . .
OFFTAKER:
G G
OWNER: OWNER ENGINEER:
JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - M318- 00001-R1.0
TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
OUTFALL CHAMBER
COVER
SCALE: DRAWING SHEET NO. REV.:
NUMBER:
- J3B-AM-09-D-00001 01 0
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH
A
A
B
B
KEY PLAN
NOTES:
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
INSPECTION
C C
E E
F F
. . . . . . .
. . . . . . .
. . . . . . .
OFFTAKER:
G G
OWNER: OWNER ENGINEER:
JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - M318- 00001-R1.0
TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
OUTFALL CHAMBER
INDEX
SCALE: DRAWING SHEET NO. REV.:
NUMBER:
- J3B-AM-09-D-00001 02 0
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH
PLANT
NORTH
55
.18
° TRUE
NORTH
A
A
LIMESTONE
STORAGE
AREA
B
B
LIMESTONE
CONTACTORS
AREA KEY PLAN
NOTES:
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
INSPECTION
C C
LIMESTONE
PUDDLE PIPE LIST
BACKWASH
TANK ITEM UNITS ND ELEV. LOCATION
3B GDK04 FROM RO DISCHARGE
1 2600 0.950
PP001 CHAMBER
3B GDK04
1 2800 -8210 TO OUTFALL
PP002
D D
E E
REFERENCES DRAWINGS:
1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001.
2.-FOR P&ID SEE DWG´s: J3B-AP-09-D-00001.
3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.
4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.
5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001.
F F
. . . . . . .
. . . . . . .
. . . . . . .
OFFTAKER:
G G
OWNER: OWNER ENGINEER:
INTAKE
CHAMBER Jubail 3B Project Company
PROJECT TITLE:
JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - M318- 00001-R1.0
TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
OUTFALL CHAMBER
GENERAL PLAN VIEW
SCALE: DRAWING
GENERAL PLAN VIEW NUMBER:
SHEET NO. REV.:
1:150 J3B-AM-09-D-00001 03 0
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
21417 NORTH
PLANT
NORTH5
5.1 1300 4015 2646 700 4301 700 6455 1300
8° TRUE
NORTH
10.00
A
A
8.00
3000
7.00
1000
800
700 5155 500
1500
5.50
B
B
6485
7500
5245
10765
KEY PLAN
1429
1300 8165 1300 N=115.639 -0.479
100
NOTES:
3BGDK04BR001-DN2600-T4 E=430.469
21800
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
EL.0.950 2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
-2.00
500
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
800 1300
3980
5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
INSPECTION
C -4.96 C
500
10.00
(TOC)
8400
2942
3BGDK04BR001-DN2600-T4
EL.0.950
2213
REFERENCES DRAWINGS:
-10.40 1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001.
2.-FOR P&ID SEE DWG´s: J3B-AP-09-D-00001.
700
1400
D 3B GDK04 PP001 5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419. D
6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001.
21417
SECTION A-A
7648
-10.40 8.00
1 1/4" DN32 20" DN500 68" DN1700
(TOC)
1 1/2" DN40 22" DN550 72" DN1800
7.00
1000
2" DN50 24" DN600 80" DN2000
500
3366
2500
2849
+ 3.500 800 5155 700 2 1/2" DN65 26" DN650 88" DN 2200
(FGL) 5.50 3" DN80 28" DN700 96" DN2400
4" DN100 32" DN800 104" DN2600
1234
4569 . . . . . . .
0.479
. . . . . . .
21800
500
. . . . . . .
-2.00 1 2022.06.24 ISSUED FOR CONSTRUCTION A.D. I.B. D.C. I.A.
0 2022.04.28 ISSUED FOR CONSTRUCTION A.D. I.B. D.C. I.A.
REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH
3986
2965
B A 2849 OFFTAKER:
-4.96
3B GDK04 PP002
G EL.-8.210 G
DN2800
OWNER: OWNER ENGINEER:
PROJECT TITLE:
TOP PLAN VIEW JUBAIL 3B IWP
1450
-9.660
EPC CONTRACTOR SUBCONTRACTOR:
-10.40
Cod.: SA07C2- 02 -42 - M318- 00001-R1.0
740
1400
TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
OUTFALL CHAMBER
GENERAL PLAN VIEW
SCALE: DRAWING SHEET NO. REV.:
SECTION B-B NUMBER:
1:100 J3B-AM-09-D-00001 04 0
1 2 3 4 5 6 7 8 9 10 11 12