This document provides a budget for construction materials for a housing project with 3 homes. It lists materials needed for water pipes, slabs, rebar, concrete, wood, and electrical piping. The total cost of separated materials is $199,809.94. Pipes, rebar, concrete, and electrical piping make up the majority of costs.
Original Description:
Original Title
Aa - Sm3 - Ph 03 - Presupuesto de Materiales de Vivienda - r0
This document provides a budget for construction materials for a housing project with 3 homes. It lists materials needed for water pipes, slabs, rebar, concrete, wood, and electrical piping. The total cost of separated materials is $199,809.94. Pipes, rebar, concrete, and electrical piping make up the majority of costs.
This document provides a budget for construction materials for a housing project with 3 homes. It lists materials needed for water pipes, slabs, rebar, concrete, wood, and electrical piping. The total cost of separated materials is $199,809.94. Pipes, rebar, concrete, and electrical piping make up the majority of costs.