You are on page 1of 2

KCT PIPE LINES DIVISION

GULF CORNERS FOR


FINAL PRICE IN SAR TRADING & GEN MAX STEEL IBRAHIM AL-ANAZI ARABIAN EDAR GEN. INTERNATIONAL
DESCRIPTION CONTRACTING CONTRACTING CONTRACTING CONST. EST BUILDING SYSTEM REMARKS

AMOUNT (SR) AMOUNT (SR) AMOUNT (SR) AMOUNT (SR) AMOUNT (SR)

FAB-SHOP (60.0 X 15.0 M2 x 9-10MTR HEIGHT) Revised Proposal


1-CIVIL WORKS: (ELIMINATED) Eliminated NOT INCLUDED
2-STEEL WORKS: 531,800.00 282,441.00 497,640.00 630,000.00 380,000.00
3-ELECTRICAL WORKS INSIDE FAB SHOP: 250,000.00 50,294.00 - NOT INCLUDED
4-OVER HEAD CRANE 5TON CAPACITY included 165,000.00 165,000.00
5-MDF PANELS 0.5MM WT FOR SIDE WALL / IZOWALL EPS ROOF PANELS 150,000.00
6-CEMENTIOUS FIRE PROOFING FOR ALL BLOCK WALLS
7-INTUMESCENT FIREPROOF PAINT FOR ALL STRUCTURALS
SUB TOTAL - I 781,800.00 497,735.00 662,640.00 630,000.00 380,000.00
WARE HOUSE (40.0 X 20.0 M2 x 6.0 MTR HEIGHT) -
1-CIVIL WORKS: (ELIMINATED) Eliminated NOT INCLUDED
2-STEEL WORKS: 311,000.00 251,058.00 331,760.00 320,000.00 280,000.00
3-ELECTRICAL WORKS INSIDE WARE HOUSE: 60,000.00 44,705.00 included NOT INCLUDED
SUB TOTAL - II 371,000.00 295,763.00 331,760.00 320,000.00 280,000.00
-
OUTSIDE COMPLETE ELECTRICAL SYSTEM : SWITCHGEAR/DISTRIBUTION 830,000.00 NOT INCLUDED 483,838.00 NOT INCLUDED NOT INCLUDED
PANEL/CABLING/LIGHTING (OUTSIDE FAB-SHOP)
SUB TOTAL - III 830,000.00 - 483,838.00 - -
TOTAL AMOUNT SAR: 1,982,800.00 793,498.00 1,478,238.00 950,000.00 660,000.00

APPROVED FOR PRICE / MODEL/TYPE / QUALITY LOWEST BIDDER


DESCRIPTION MODEL/TYPE/BRAND QTY/UNIT PRICE/UNIT FINAL PRICE IN SAR

FAB-SHOP (60.0 X 15.0 M2 x 9-10MTR HEIGHT)


1-CIVIL WORKS: (ELIMINATED)

2-STEEL WORKS:

3-ELECTRICAL WORKS INSIDE FAB SHOP:

4-OVER HEAD CRANE 5TON CAPACITY

5-MDF PANELS 0.5MM WT FOR SIDE WALL / IZOWALL EPS ROOF PANELS

6-CEMENTIOUS FIRE PROOFING FOR ALL BLOCK WALLS

7-INTUMESCENT FIREPROOF PAINT FOR ALL STRUCTURALS

SUB TOTAL - I

WARE HOUSE (40.0 X 20.0 M2 x 6.0 MTR HEIGHT)


1-CIVIL WORKS: (ELIMINATED)

2-STEEL WORKS:

3-ELECTRICAL WORKS INSIDE WARE HOUSE:

SUB TOTAL - II

OUTSIDE COMPLETE ELECTRICAL SYSTEM : SWITCHGEAR/DISTRIBUTION PANEL/CABLING/LIGHTING


(OUTSIDE FAB-SHOP)

SUB TOTAL - III

TOTAL AMOUNT SAR:

APPROVED FOR PRICE / MODEL/TYPE / QUALITY