Plumbing Specification
Plumbing Specification
Location: SURIGAO
PLUMBING SPECIFICATIONS
All Plumbing works shall execute in accordance with the Revised
National Plumbing Code. Rules and regulations of the existing local
code and ordinances.
It is not intended that the drawing shall show every pipes, fittings,
valves, and appliances, furnish and install, if necessary all such items
whether specifically mentioned or not indicated in the drawings to
complete system in accordance with the best of practice of plumbing
trade.
Soil and waste pipe shall properly aligned and install at a uniform grade
of not less than 2% and anchored at interval of 1.5m not to exceed 2.0
m.
Outflow of the septic tank vault shall be discharge directly to the street
drainage. Drain pipe and catch basin discharge outflow from the septic
vault shall also constructed watertight/waterproof to prevent leakage to
percolate to the ground.
All vent stack thru roof shall have a clear roof elevation of at least
0.30m.
All plumbing works be done under the immediate and direct supervision
of Master Plumber.
Certified by:
Approved by:
VILMA C. SOLEJON
Owner/Applicant