S.No. Particulars No. Length width H/Depth Quantity Unit
1 Earth work in excavation in trenches for foundation in ordirnary soil as per S.I. No. 2.6.1 Columns foundation ### long wall 1 x 2 5.63 0.90 1.00 10.13 ### short wall 1 x 2 4.96 0.90 1.00 8.93 ### 1 x 1 2.50 0.90 1.00 2.25 ### 1 x 1 3.60 0.90 1.00 3.24 ### 1 x 1 1.00 1.00 0.60 0.60 ### Total 25.15 cum
sand :4 graded stone aggregate)finished with a floating coat of neat cement concrete including cement slurry 40 mm thick with 20 mm nominal size stone aggregate as per dsr 11.3.1 1 x 2 5.63 0.35 0.35 1.38 ### 1 x 2 4.5 0.35 0.35 1.10 1 x 1 2.5 0.35 0.35 0.31 1 x 2 3.60 0.23 0.150 0.25 1 x 2 3.64 0.23 0.150 0.25 3.29 cum
8 12 mm cement plaster of mix ( 1:6) as per 13.1.2 ###
1 x 4 3.60 3.00 43.20 1 x 2 3.46 3.00 20.76 1 x 2 4.96 3.00 29.76 ### 1 x 4 1.80 3.00 21.60 1 x 2 2.96 3.00 17.76 1 x 4 0.35 3.000 4.20 1 x 1 12.12 0.83 10.06 1 x 1 3.46 1.50 5.19 1 x 2 3.60 1.500 10.80 Deduction 163.33 Sqm 1 x 2 1.20 2.10 5.04 1 x 2 1.10 2.10 4.62 1 x 8 0.90 1.50 10.80 20.46 Total 142.87 Sqm
### 9
providing and laying of RCC ( 1:2:4) c/sand & 20mm
S/Ballast mortar i/c all the complete work in iron piller foundation as per dsr 4.2.3 1 x 4 1.36 0.23 0.15 0.19 1 x 1 1.66 0.23 0.15 0.06
1 x 1 1.56 0.23 0.15
0.05 1 x 1 6.09 4.96 0.125 3.78 1 x 1 1.50 0.27 0.125 0.05 1 x 4 1.36 0.45 0.125 0.31 1 x 2 4.10 0.27 0.125 0.28 4.71 deduction 1 x 1 2.00 2.00 0.13 0.50 4.21 cum