Professional Documents
Culture Documents
WAR THUNDER
GRADE: 8E5
Date: February 2023
1
Section A-Team dynamics Page 3
2
Section A- Team Dynamics
1.1 Select a Name for your Team and describe why you selected
his name.
War Thunder, Because it’s about fighting a war in tanks and navy
ships and it is a suitable vehicle to make for this project.
CLASS: 8E5
3
TECHNOLOGY PAT
Volt Energy
Design Brief
4
This is the list of specifications and
constraints that the gas station is required
to fulfil.
Specifications
Gas station must have at least 2 parking spaces for people to park
their vehicles to charge them.
Gas station requires solar panels to conduct electricity for vehicles
to charge their batteries to prevent problems during load-shedding
because of no electricity.
Constraints
Gas station must not exceed measurements on technical drawings
and requires to have the accurate dimensions shown on drawing
Gas station needs to have power available at all times in case of
emergency
5
Type of energy source (5)
The cars will change for 5 hours and will last for 10 hours
The batteries can change longer when there is electricity.
We will use solar energy for our lights and fridges for drinks
Environmentally friendly features (5)
We are using solar energy of petrol
The tank use electricity to change and doesn’t produce any co2
Solar power impowers at quality and decreases water consumption for
power production.
The car cannot charge more than 2 hours or else the battery can damage
When the car is fully charged it increases the speed of the car.
6
7