Performance Objective: Provided with required information you should be able to:
1. Use the proper tools and materials needed in performing
cable splicing and testing.
2. Create a cross-over ethernet cable
Supplies/Materials:
1. 1-meter UTP Cable
2. RJ45
3. PowerPoint Presentation
Equipment:
1. Splicer/Stripper
2. Crimper
3. Lan Tester
5 3 1
TASKS
(Excellent) (Very Satisfactory) (Satisfactory) TOTAL
1. Selection of All required tools for Certain tools are Majority of the
appropriate tools the task are selected not selected or required tools for
and used used properly the task are not
identified
2. Proper handling Tools are properly Certain tools are Majority of the tools
and usage of tools used not handled are not properly
properly in using handled and used
TOTAL