Professional Documents
Culture Documents
S.NO Site Task Description Completion Date
S.NO Site Task Description Completion Date
NO Site
1 WFP BAMBOO 2 WFP GRILLS 3 UNESCO 4 FINLAND RCC WALL FINLAND RES-CANOPY NADRA-civil NADRA-blocker GERMAN EU IOM-Shower fixing, complaints UNDP OLD OFFICE FINLAND-COMPLAINTS Golra Store UNHCR
TASK DESCRIPTION
Completion Date
20-09-11
17-09-11 18-09-11
S.NO Site
1 WFP BAMBOO 2 WFP GRILLS 3 UNESCO 4 FINLAND RCC WALL FINLAND RES-CANOPY NADRA GERMAN IRAQ-barrier Iraq-Planters Iraq-Razorwire UNMOGIP EU IOM-Shower fixing, complaints IOM-Anti shatter film UNDP OLD OFFICE WFP-KHI OFFICE G-6 NORWAY FINLAND-COMPLAINTS FREANCH-KHI work in progress
TASK DESCRIPTION
permission not given from client yet cabinets fixed, Additional work asked leveling will be done today,material ordered not reached yet paint remaining all snags pointed out not rectified yet,mail work in progress demand received for wires etc, material work in progress concrete done yesterday of first 5 twalls
REMARKS
S.NOTASK DESCRIPTION
1 golra building handover 2 chakshehzad store setting chakshehzad store inventory office store inventory
STATUS/REMARKS
access control kitchen exhaust fan reception stairs wood wall paper samples partitions paint vehicle plan vehicle repairing smoking area development pec letter printing abbas new phone lines heater connections in rooms carpenter workstation demand guardpost glass phone+fan in shed store insurance list-health amended contract copy-G-6 building legal cases Software developer AC troubleshooting kit Blue generator repairing
JULY / AUGUST
IRAQ Embassy-Supervisor Kashan
S.# Job Description 1) UNDER GROUND ROAD BLOCKER Installation of metal frame installation of blocker machinery installation of light posts 2) ELECTRICAL MAIL SCANNER 1 Placement of 10 K Mail scanner 3) RAZOR WIRE WITHOUT THE V SHAPE FRAME (American standard ) 4) FIXED CONCRETE BOLLARDS construction of fixed concrete Bollards by using 3'Dia.height 3feet 1 above
WFP-Residence-Fixing of Grills
1 fixing of grills guard post construction Sand bags filling
UNESCO
Fixing of cabinets
WFP
Bamboo Hut
UNDP
Razor wire & steel Door
Us Embassy
removing and refixing of lift on another location
IOM
Troubleshooting 1 Norway motor 2 WFP-Karachi Road blocker and UVSS 3 IOM: Tub installation-shower set pending, polish and paint work 4 NADRA - HANDOVER 5 German IOM: door locks, door closer
START ON
FINISH ON
7th sep
7th sep
Remarks
roof complain, bench pending paint complain, grill and 1' by 1' sheets pending
delay from client paint complain, grill and 1' by 1' sheets pending
snags-work in progress
NO
1 Closing report
TASK DESCRIPTION
STATUS/REMARKS
received in process client not responding
2 vendors develpoped 3 UNODC payment 4 Tax returns, instructed acc dept to complete papers by 12 sep 5 A/c Payables 6 A/c Receivables 7 invoices 8 9 10 11 12 13 14 15 16
S.NO
1 daily report 2 store inventory 3 4 5 6 7 8 9 10 11 12 13
TASK DESCRIPTION
STATUS/REMARKS
S.NO
client list
TASKS
1 daily report 2 quote status 3 PO status 4 building management division 5
TASK DESCRIPTION
STATUS/REMARKS
S.NO
1 Interview 2
TASKS
TASK DESCRIPTION
STATUS/REMARKS
S.NO
1
TIME
CONCERNED PERSON
STATUS/REMARKS