1 WFP BAMBOO 2 WFP GRILLS 3 UNESCO 4 FINLAND RCC WALL FINLAND RES-CANOPY NADRA-civil NADRA-blocker GERMAN EU IOM-Shower fixing, complaints UNDP OLD OFFICE FINLAND-COMPLAINTS Golra Store UNHCR

TASK DESCRIPTION

Completion Date
20-09-11

17-09-11 18-09-11

18-09-11 27-09-11 20-09-11

16-09-11 18-09-11 censors not working properly

S.NO Site
1 WFP BAMBOO 2 WFP GRILLS 3 UNESCO 4 FINLAND RCC WALL FINLAND RES-CANOPY NADRA GERMAN IRAQ-barrier Iraq-Planters Iraq-Razorwire UNMOGIP EU IOM-Shower fixing, complaints IOM-Anti shatter film UNDP OLD OFFICE WFP-KHI OFFICE G-6 NORWAY FINLAND-COMPLAINTS FREANCH-KHI work in progress

TASK DESCRIPTION
permission not given from client yet cabinets fixed, Additional work asked leveling will be done today,material ordered not reached yet paint remaining all snags pointed out not rectified yet,mail work in progress demand received for wires etc, material work in progress concrete done yesterday of first 5 twalls

REMARKS

security clearence mail sent, tools-material loading in process

S.NOTASK DESCRIPTION
1 golra building handover 2 chakshehzad store setting chakshehzad store inventory office store inventory

STATUS/REMARKS

access control kitchen exhaust fan reception stairs wood wall paper samples partitions paint vehicle plan vehicle repairing smoking area development pec letter printing abbas new phone lines heater connections in rooms carpenter workstation demand guardpost glass phone+fan in shed store insurance list-health amended contract copy-G-6 building legal cases Software developer AC troubleshooting kit Blue generator repairing

JULY / AUGUST
IRAQ Embassy-Supervisor Kashan
S.# Job Description 1) UNDER GROUND ROAD BLOCKER Installation of metal frame installation of blocker machinery installation of light posts 2) ELECTRICAL MAIL SCANNER 1 Placement of 10 K Mail scanner 3) RAZOR WIRE WITHOUT THE V SHAPE FRAME (American standard ) 4) FIXED CONCRETE BOLLARDS construction of fixed concrete Bollards by using 3'Dia.height 3feet 1 above

FINLAND EMBASSY (arshad awan) Nizampur- Boundary Wall UNMOGIP


Construction of 50 Twalls RCC wall construction guard post construction

Construction of Boundary wall

WFP-Residence-Fixing of Grills
1 fixing of grills guard post construction Sand bags filling

FINLAND EMBASSY (arshad awan) UNODC


installation of Reversible units-27

UNESCO
Fixing of cabinets

WFP
Bamboo Hut

UNDP
Razor wire & steel Door

Us Embassy
removing and refixing of lift on another location

IOM

Anti shatter film- 1100 sq ft

Troubleshooting 1 Norway motor 2 WFP-Karachi Road blocker and UVSS 3 IOM: Tub installation-shower set pending, polish and paint work 4 NADRA - HANDOVER 5 German IOM: door locks, door closer

START ON

FINISH ON

7th sep

7th sep

Remarks

complain received not rectified yet

20 delivered from them 13units installed,remaining pending. 7 left

roof complain, bench pending paint complain, grill and 1' by 1' sheets pending

delay from client paint complain, grill and 1' by 1' sheets pending

snags-work in progress

NO
1 Closing report

TASK DESCRIPTION

STATUS/REMARKS
received in process client not responding

2 vendors develpoped 3 UNODC payment 4 Tax returns, instructed acc dept to complete papers by 12 sep 5 A/c Payables 6 A/c Receivables 7 invoices 8 9 10 11 12 13 14 15 16

S.NO
1 daily report 2 store inventory 3 4 5 6 7 8 9 10 11 12 13

TASK DESCRIPTION

STATUS/REMARKS

S.NO
client list

TASKS
1 daily report 2 quote status 3 PO status 4 building management division 5

TASK DESCRIPTION

STATUS/REMARKS

change in presentations, printing etc

S.NO
1 Interview 2

TASKS

TASK DESCRIPTION

STATUS/REMARKS

S.NO
1

TIME

CONCERNED PERSON

STATUS/REMARKS