Calculation Sheet for Power House Structure due to LOAD TEST OHC
A. A. Harry / L.
0 Issued for Information 09-09-2020 A. Trianto
Tryantoro Surendro
Rev Status Date Prepared Checked Approved
1. GENERAL
1.1 OUTLINE OF STRUCTURE
Project : EPC CONTRACT FOR RANTAU DEDAP
GEOTHERMAL POWER PLANT PROJECT
Employer : PT. SUPREME ENERGY RANTAU DEDAP (SERD)
Location : SOUTH SUMATERA, INDONESIA
Structure : POWER HOUSE
1.4 LANGUAGE
All drawings, calculations, and documents shall be writen in English.
2. OUTLINE
2.1 GENERAL DESCRIPTION
This report covers Power House Structure due to installating condensor
3 MODELLING STRUCTURE
3.1 MATERIAL PROPERTIES
All materials are steel A36 or SS400
3.2 CONDITION
During Load Test Over Head Crane & installing Condensor some member of structures
have to be dismantled for access.
Isometric as Design
4 DESIGN LOAD
4.1 DEAD LOAD
1. Self Weight
Structure dead load shall be calculated automatically by Staad Pro.
2. OHC
Weight of OHC = 35 ton
Weight for load test OHC = 125% x 73 = 91.25 ton ~ 100 ton
Divided to 2 girder and each girder has 2 support, therefore the load will divided to 4
Load test to Structure= 100.00 = 25 ton
4
Steel Ratio
Maximum Ratio = 0.696 < 1.0 …… OK