Professional Documents
Culture Documents
x Oracle Project
Foundation Fundamentals
Supplemental Student
Practices
Activity Guide
D60119GC10
Edition 1.0
August 2012
D65133
Copyright © 2010, 2012, Oracle and/or its affiliates. All rights reserved.
Disclaimer
This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and
print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way.
Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display,
perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization
of Oracle.
The information contained in this document is subject to change without notice. If you find any problems in the document, please
report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not
warranted to be error-free.
If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United
States Government, the following notice is applicable:
Trademark Notice
Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective
owners.
Author
Dhanya Menon
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
i
Solution - Define a Probability List .............................................................................................................1-91
Practice - Define a Phase...........................................................................................................................1-93
Solution - Define a Phase...........................................................................................................................1-94
Practice - Define a Lifecycle.......................................................................................................................1-95
Solution - Define a Lifecycle.......................................................................................................................1-96
Practice - Define a Project Status ..............................................................................................................1-98
Solution - Define a Project Status ..............................................................................................................1-99
Practice - Define a Cycle............................................................................................................................1-101
Solution - Define a Cycle............................................................................................................................1-102
Practice - Create a Resource List ..............................................................................................................1-104
Solutions - Create a Resource List.............................................................................................................1-105
Practice - Define a Work Type ...................................................................................................................1-108
Solution - Define a Work Type ...................................................................................................................1-109
Practice - Define a Task Status..................................................................................................................1-111
Solution - Define a Task Status..................................................................................................................1-112
Practice - Define a Service Type................................................................................................................1-114
Solution - Define a Service Type................................................................................................................1-115
Practice - Define a Task Type ....................................................................................................................1-116
Solution - Define a Task Type ....................................................................................................................1-117
Practice - Define a Project Type.................................................................................................................1-119
Solution - Define a Project Type.................................................................................................................1-121
Practice - Define a Project Template..........................................................................................................1-127
Solution - Define a Project Template..........................................................................................................1-129
Practice - Create a Project from a Project Template ..................................................................................1-133
Solution - Create a Project from a Project Template ..................................................................................1-134
Resource Planning and Reporting .................................................................................................................1-139
Practice - Create a Planning Resource List................................................................................................1-140
Solution - Create a Planning Resource List................................................................................................1-141
Practice - Define a Resource Breakdown Structure ...................................................................................1-146
Solution - Define a Resource Breakdown Structure ...................................................................................1-148
Practice - Associate a Resource Breakdown Structure with a Project .......................................................1-153
Solution - Associate a Resource Breakdown Structure with a Project .......................................................1-154
Overview of Project Structures.......................................................................................................................1-156
Practice - Define a Project with Non-Shared Structure with No Mapping...................................................1-157
Solution - Define a Project with Non-Shared Structures with No Mapping .................................................1-159
Financial Structures .......................................................................................................................................1-163
Practice - Update a Financial Breakdown Structure...................................................................................1-164
Solution - Update a Financial Breakdown Structure...................................................................................1-166
Practice - View Financial Tasks .................................................................................................................1-171
Solution - View Financial Tasks .................................................................................................................1-172
Organization Forecasting ...............................................................................................................................1-175
Utilization .......................................................................................................................................................1-176
Appendix A: Integration with Oracle Sales .....................................................................................................1-177
Appendix B: Integration with Oracle Product Lifecycle Management .............................................................1-178
Appendix C: Integration with Oracle Internal Controls Manager ....................................................................1-179
Appendix D: User-Defined Attributes .............................................................................................................1-180
Practice - Define a Value Set .....................................................................................................................1-181
Solution - Define a Value Set .....................................................................................................................1-182
Practice - Define Attribute Groups..............................................................................................................1-184
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
ii
Solution - Define Attribute Groups..............................................................................................................1-186
Practice - Define Attribute Context .............................................................................................................1-190
Solution - Define Attribute Context .............................................................................................................1-192
Practice - Enter Data for User-Defined Attributes.......................................................................................1-197
Solution - Enter Data for User-Defined Attributes.......................................................................................1-198
Summary of R12.x Project Foundation Fundamentals...................................................................................1-201
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
iii
Preface
Profile
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
v
Related Publications
Oracle Publications
Title Part Number
Oracle Projects Implementation Guide E13582-03
Oracle Projects Fundamentals E13581-03
Additional Publications
• System release bulletins
• Installation and user’s guides
• Read.me files
• International Oracle User’s Group (IOUG) articles
• Oracle Magazine
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
vi
Typographic Conventions
The following two lists explain Oracle University typographical conventions for words that
appear within regular text or within code samples.
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
vii
Typographic Conventions (continued)
Typographic Conventions for words within code samples
Notations:
(N) = Navigator
(M) = Menu
(T) = Tab
(B) = Button
(I) = Icon
(H) = Hyperlink
(ST) = Sub Tab
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
viii
Typographic Conventions (continued)
Typographical Conventions in Oracle Application Help System Paths
This course uses a “navigation path” convention to represent actions you perform to find
pertinent information in the Oracle Applications Help System.
The following help navigation path, for example—
(Help) General Ledger > Journals > Enter Journals
—represents the following sequence of actions:
1. In the navigation frame of the help system window, expand the General Ledger entry.
2. Under the General Ledger entry, expand Journals.
3. Under Journals, select Enter Journals.
4. Review the Enter Journals topic that appears in the document frame of the help system
window.
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
ix
Copyright © 2012. Oracle and/or its affiliates. All rights reserved.
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
x
R12.x Oracle Project
Foundation Fundamentals
Supplemental Student
Practices
Chapter 1
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a location for your New York branch office on the third floor of Madison Avenue. Enter
the following information:
Field Value
Scope Global
Name XXNew York
Description New York Branch Office
Address Style United States
Field Value
Address Line 1 540 Madison Avenue 3rd Floor
City New York
State NY
Zip Code 10022
County New York
Country United States
Tip: (N) Setup: Resources and Organizations: HR Foundation: Work Structures > Define
Locations
Field Value
Scope Global
Name XXNew York
Description New York Branch Office
Address Style United States
4. Position your cursor in the Address field and enter the address
Field Value
Address Line 1 540 Madison Avenue 3rd Floor
City New York
State NY
Zip Code 10022
County New York
Country United States
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create an organization of type XX-Branch Office at the New York location created earlier:
Field Value
Name XX-Office
Type Branch Office
From Today’s Date
Location XXNew York
Internal or External Internal
Location Address Accept Default Values
Then assign the following organization classifications to the organization:
• HR Organization
• Project Expenditure/Event Organization
• Project Task Owning Organization
• Project Invoice Collection
For the Project Expenditure/Event Organization classification, add Additional Organization
information such as the Related Organizations (operating unit = Vision Services) and the
Resource Defaults (calendar = East Standard) information. In the case of the Project Task
Owning Organization Classification, allow entry of indirect and contract projects but disallow
entry of capital projects.
Field Value
Name XX-Office
Type Branch Office
From Today’s Date
Location XXNew York
Internal or External Internal
Location Address Accept Default Values
4. (I) Save
Field Value
Name HR Organization
Enabled Yes
6. (I) Save
Field Value
Name Project Expenditure/Event
Organization
Enabled Yes
8. (I) Save
9. (B) Others
10. Select Related Organizations in the Additional Organization Information window
11. (B) OK
12. Position your cursor in the Related Organizations field
13. (B) OK
14. (B) OK
15. (B) Yes in the dialog box
16. (B) Others
17. Select Resource Defaults in the Additional Organization Information window
18. (B) OK
19. Position your cursor in the Resource Defaults field
Field Value
Calendar East Standard
Calendar:
− The calendar assignment at the project expenditure organization level is the default
calendar for all resources and projects in the organization.
− This calendar overrides the calendar assigned at the site level.
− Calendars are discussed in the lesson titled “Period and Calendar Definition.”
20. (B) OK
21. (B) OK
22. (B) Yes in the dialog box
23. (I) New
Field Value
Name Project Task Owning Organization
Enabled Yes
24. (I) Save
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Field Value
Allow Entry of Indirect Projects Yes
Allow Entry of Capital Projects No
Allow Entry of Contract Projects Yes
27. (B) OK
28. (B) OK
29. (B) Yes in the dialog box
30. (I) New
Field Value
Name Project Invoice Collection
Organization
Enabled Yes
31. (I) Save
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Search for and find the organization hierarchy with the name Global. Next query the
organization with the name Services-East. Then, add your XX-Office organization as a
subordinate organization to Services-East
Field Value
Name XX-Office
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define an 8 hour working (weekend) shift based on the information in the following table:
Field Value
Name XX-Team (Weekend Shift)
Description 8 hour weekend shift for team members
Effective Date From Today’s Date
3. Create the Shift Pattern based on the information in the following table:
4. (I) Save
5. Close the Define Shifts window.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a calendar with the following basic information:
Field Value
Name XX-Project Team (weekend)
Type Team Calendar
Description XX-Project Team Calendar (weekend)
Effective Date From Today’s Date
Field Value
Name XX-Project Team (weekend)
Type Team Calendar
Description XX-Project Team Calendar (weekend)
Effective Date From Today’s Date
3. (I) Save
4. Close the Calendar window
Field Value
Sequence 1
Name XX-Team (Weekend Shift)
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
8. (T) Exceptions
9. Enter New Years Day as an exception for the next two years and save after you enter each
line
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Using the Projects, Vision Services (USA) responsibility, define a job group to which you can
assign consulting project jobs. Enter the following information:
Field Value
Job Group XX-Consulting Project Jobs
Job Flexfield Structure Job Flexfield
Business Group Vision Corporation
Master Job Group No
Tip: Use the following navigation path:
• (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job >
Job Group
Field Value
Job Group XX-Consulting Project Jobs
Job Flexfield Structure Job Flexfield
Business Group Vision Corporation
Master Job Group No
3. (I) Save
4. Close the Job Groups window.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a billable job of a Principal Consultant that is revenue generating and can be included in
utilization. For this first enter the XX-Consulting Project Jobs Job Group and define the
following in the Job Flexfield window:
Field Value
Job Code XX1
Job Name PRINCIPAL CONSULTANT
Define the following Extra Job Information:
Field Value
Category Name Revenue Generating
Billable Yes
Include in Utilization Yes
Project Job Level 50
Project Job Code (freeform entry) XXPRCON
Schedulable Yes
Tip: Navigate to the Job window as follows:
(N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job >
Description
Field Value
Job Group XX-Consulting Project Jobs
4. Position your cursor in the Name field
5. Open the Job Flexfield window (CTRL + L)
Field Value
Job Code XX1
Job Name PRINCIPAL CONSULTANT
6. (B) OK in the Job Flexfield window
7. Enter today’s date as the Start Date
8. (I) Save
Field Value
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
12. (B) OK
13. (I) Save
14. (B) OK in the Forms dialog box
15. Close the Extra Job Information and the Job windows.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a Competence
Define a competence measuring the ability to give public presentations with the following
information:
Field Value
Scope Local (select option button)
Name XX-Ability to Give Public Presentations
Description XX-Ability to Give Public Presentations
Alias XXPUB PRES ABILITY
Cluster Normal Competence
Further Information Leave Blank
Choose “Levels” as the method you will employ to evaluate the competence.
Define the evaluation information as follows:
Field Value
Primary Evaluation Method Observation
Renewal Period 2.
Units Year
Certification Required No
Behavioral Indicator Leave Blank
Levels Name
1 Poor
2 Below Average
Field Value
Scope Local (select option button)
Name XX-Ability to Give Public Presentations
Description XX-Ability to Give Public Presentations
Alias XXPUB PRES ABILITY
Cluster Normal Competence
Further Information Leave Blank
4. (T) Valid Date and Proficiency
Field Value
Valid Dates: From Today’s Date
Valid Dates: To Leave Blank
Proficiency Levels (select option button)
5. Define the evaluation information
Field Value
Primary Evaluation Method Observation
Renewal Period 2.
Units Year
Certification Required No
Behavioral Indicator Leave Blank
Levels Name
1 Poor
2 Below Average
3 Average
4 Above Average
5 Outstanding
9. (I) Save
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define an employee with basic information as follows:
Field Value
Last XXStudent
First Enter your first name
Title Select a title
Gender Select a gender
Action Create Employment
Person Types Employee ((B) OK to accept)
Social Security XX1-23-5555
Enter Personal information and Office Details as follows:
Field Value
Birth Date 01-JAN-1970
Latest Start Date Today’s Date
Email XXstudent@vision.com
Mail To Home
Enter the following Address details:
Field Value
Address Line 1 203 N. LaSalle Street
City Chicago
State IL
Zip Code 60600
County Cook
Country United States
Define the competence profile of the employee with the following information:
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Field Value
Organization Services-Central
Job CON600.Consultant
Position CON686.PRINCIPAL
CONSULTANT
Payroll Vision Monthly
Location S1 - Chicago
Status Active Assignment
Supervisor Name Marlin, Ms. Amy
Supervisor Number 34
Field Value
Government Reporting Entity Vision Corporation
Finally, in the Project Information tab, define the Billing Title for the employee:
Field Value
Billing Title Project Consultant
Field Value
Last XXStudent
First Enter your first name
Title Select a title
Gender Select a gender
Action Create Employment
Person Types Employee ((B) OK to accept)
Social Security XX2-23-5555
4. (T) Personal
Field Value
Birth Date 01-JAN-1970
Latest Start Date Today’s Date
5. (T) Office Details
Field Value
Email XXstudent@vision.com
Mail To Home
6. (I) Save
Field Value
Address Line 1 203 N. LaSalle Street
City Chicago
State IL
Zip Code 60198
County Cook
Country United States
9. (I) Save
Record Competencies
11. (B) Others
12. Select Competence Profile from the list
13. (B) OK
14. Enter the competence information for the employee:
Field Value
Organization Services-Central
18. (B) Correction
19. (B) Cancel in the People Group Flexfield
20. Enter the job and position information
Field Value
Job CON600.Consultant
Position CON686.Principal Consultant
21. (B) Yes in the Decision dialog box
22. Enter the remaining basic assignment information
Field Value
Payroll Vision Monthly
Location S1 - Chicago
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Field Value
Name Marlin, Ms. Amy
Number 34
24. (T) Statutory Information
25. Place your cursor in the long white field. This will open the GREs and Other Data window.
Field Value
Government Reporting Entity Vision Corporation
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define Organization Authority for the following resource:
− Anthony, Elaine XX
Note: Elaine Anthony is available for the numbers 00-16. If your XX number is greater than
16, consult with your instructor.
Use the details in the following table to define the Organization Authority for your resource:
Field Value
Hierarchy Global
Version 1
Start Organization Services-Central
Project Authority Yes
Resource Authority No
Primary Contact No
Forecast Authority Yes
Forecast -- Primary No
Contact
Utilization Authority Yes
Field Value
Hierarchy Global
Version 1
Start Organization Services-Central
Project Authority Yes
Resource Authority No
Primary Contact No
Utilization Authority Yes
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Using the Projects, Vision Services (USA) responsibility, define basic role information as
follows:
Field Value
Name XX-Implementation
Consultant
Description Implementation Consultant
Effective Date From Today’s Date
Effective Date To Leave Blank
Enforce role-based security Yes
Menu Project Manager Role
Menu
Tip: (N) Setup: Projects > Roles
Assign controls to the role using the single right-arrow button:
− Allow as Project Member
− Allow Scheduling
− Allow Labor Cost Query
Assign a role list to the role using the single-right arrow button:
− Construction
Define Job information for the role as follows:
Field Value
Default Job Group XX-Consulting Project Jobs
Default Job name XX1.PRINCIPAL
CONSULTANT
Project Resource Job Global
Group
Minimum Job Level 27
Maximum Job Level 47
Field Value
Name XX-Implementation
Consultant
Description Implemenation Consultant
Effective Date From Today’s Date
Effective Date To Leave Blank
Enforce role-based security Yes
Menu Project Manager Role
Menu
3. (I) Save
4. (T) Controls
Assign controls to the role using the single right-arrow button:
− Allow as Project Member
− Allow Scheduling
− Allow Labor Cost Query
5. (I) Save
6. (T) Role Lists
Assign a role list to the role using the single-right arrow button:
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
8. (T) Jobs
Field Value
Default Job Group XX-Consulting Project Jobs
Default Job name XX1.PRINCIPAL
CONSULTANT
Project Resource Job Global
Group
Default Minimum Job Level 27
Default Maximum Job 47
Level
9. (I) Save
For team members with this role on a project, when the project has a user status of
Pending Close or Closed, their access on the project will be determined by the Team
Member Role Menu. When the project has any other status, their access will be controlled
by Project Manager Role Menu.
15. (I) Save
16. Close the Roles window.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Using Project SU, Vision Services (USA) responsibility, search for and find the Cost Plus
project. From the Shortcuts list, select Add Team Members and enter Emily Heather as your
team member. You will assign to her the role XX-Project Director that you created earlier:
Field Value
Person Heather, Ms. Emily
Role XX-Implementation Consultant
Start Date Today’s Date
End Date Any date beyond today
Scheduled Member Yes
Finally, review Emily Heather’s information from the Team Members page.
5. (B) Go
6. Enter a new team member
Field Value
Person Heather, Ms. Emily
Role XX-Implementation Consultant
Start Date Today’s Date
End Date Any date beyond today
Scheduled Member Yes
7. (B) Apply.
8. Review the team members on the project
• Select the All Members option
• (B) Go
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a team template for project management roles with the following information:
Field Value
Template Name T, XX Management Team
Description Team Template for Project Management Roles
Effective Date From Today's Date
Effective Date To Leave Blank
Calendar East Standard
Work Type Commercial Customer-billable
Role List Administration
Team Start Date Today's Date
Add a requirement of a project manager:
Field Value
Role Project Manager (search and select from list
of values)
Team Role Project Manager
Start Date Today's Date
End Date 1 Year from Today
Schedule Status Open
Staffing Priority Critical
Subteam Leave Blank
Work Type Commercial Customer-billable
Country Canada (search and select)
State/Region Leave Blank
City Leave Blank
Minimum Job Level 25
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Field Value
Template Name T, XX Management Team
Description Team Template for Project Management Roles
Effective Date From Today's Date
Effective Date To Leave Blank
Calendar East Standard
Work Type Commercial Customer-billable
Role List Administration
Team Start Date Today's Date
• Leave the Subteams section blank
Add a Requirement
5. Define the basic information for the first requirement
Field Value
Role Project Manager (search and select from list
of values)
Team Role Project Manager
Start Date Today's Date
End Date 1 Year from Today
Schedule Status Open
Staffing Priority Critical
Subteam Leave Blank
Work Type Commercial Customer-billable
Country Canada (search and select)
State/Region Leave Blank
City Leave Blank
Minimum Job Level 25
Note: At a time, you can view 10 rows in the Competencies tab. If you have more than ten rows,
use the Next and Previous hyperlinks to view the rows.
8. Select Return to Team Template Details from the list in the Apply and field
(B) Go
(B) Save
9. (H) Home
17. Navigate to the Scheduled People page to view the team roles applied to the project
(T) Resources
Note that Project Manager has been added as a Team Role.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Use the Projects SU, Vision Services (USA) responsibility, navigate to the Organization Roles
page and add an organization role with the following information:
Field Value
Role Class Partner
Role Name XX-Auditor
Effective From Today’s Date
Effective To Leave Blank
Description Independent Auditors for a Project
Search for the Cost Plus project and open it. Select the Organizations hyperlink in the Other
Project Setup section and, add an organization with the following details:
Field Value
Organization Cap Financials
Role XX-Auditor
Field Value
Role Class Partner
Role Name XX-Auditor
Effective From Today’s Date
Effective To Leave Blank
Description Independent Auditors for a Project
4. (B) Apply
5. (H) Home
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
With the Projects SU, Vision Services (USA) responsibility, navigate to the Page Layouts page.
Select Task Overview from the list in the Create Page field and Select Page Layouts from the
Setup Method field. Define the basic team member home page layout information:
Field Value
Type (View Only) Task Overview
Name XX Task Overview Page Layout
Description XX Task Overview Page Layout
Effective From Today's Date
Effective To Leave Blank
Define the following sections:
Sections
Current Schedule
Progress History
Progress
Preview the page layout and finally apply it.
5. (B) Go
6. Define the basic team member home page layout information
Field Value
Type (View Only) Task Overview
Name XX Task Overview Page Layout
Description XX Task Overview Page Layout
Effective From Today's Date
Effective To Leave Blank
Sections
Current Schedule
Progress History
Progress
(B) Apply
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a media sector class category to classify media projects with the following information:
Field Value
Class Category XX-Media Sector
Description Used to classify media projects
Mandatory No
AutoAccounting No
Allow One Code Only Yes
Allow Percent Entry No
Total Percent Equal 100 No
For All Project Types No
Include in Project Yes
Intelligence
Effective Dates – From Today’s Date
Effective Dates – To Leave Blank
For this classification, enter the following class codes:
Then associate this class category with two project types – Time and Materials, and Cost Plus:
Field Value
Class Category XX-Media Sector
Description Used to classify media projects
Mandatory No
AutoAccounting No
Allow One Code Only Yes
Allow Percent Entry No
Total Percent Equal 100 No
For All Project Types No
Include in Project Yes
Intelligence
Effective Dates – From Today’s Date
Effective Dates – To Leave Blank
3. (I) Save
4. (T) Class Codes
5. Enter the class codes for the classification:
7. (B) OK
8. (I) Save
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a general probability list for contract projects with the following probability values:
Field Value
Name XX-General Contract
Description General Probability List for Contract Projects
Effective Date From Today’s Date
Effective Date To Leave Blank
3. (I) Save
4. Define the probability values
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a status type of “phase” with the following information:
Field Value
Status Type Phase
Status XX-Build
System Status General
Description Physical compilation of designed structures
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
Field Value
Status Type Phase
Status XX-Build
System Status General
Description Physical compilation of designed structures
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
4. (I) Save
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a lifecycle for construction projects with the following basic information:
Field Value
Name XX Construction Lifecycle
Short Name XX Construction Lifecycle
Description Basic, high level phases for the lifecycle of a Construction project
Enable for Projects Yes
Enable for Items Yes
Enter the following phases for the lifecycle:
Field Value
Name XX Construction Lifecycle
Short Name XX Construction Lifecycle
Description Basic, high level phases for the lifecycle of a Construction project
Enable for Projects Yes
Enable for Items Yes
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a project status of type Project and status XX-Billing Hold that allows charges and
revenue, but not invoice generation and workflows. To do this, modify the default status controls
to disallow invoice generation. Then enter any two next allowable statuses – Approved and
Pending Close.
Field Value
Status Type Project
Status XX-Billing Hold
System Status Approved
Description Allows charges and revenue, but
no invoice generation; no workflow
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
4. (I) Save
Action Allow
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a billing cycle of 30 days. In other words, define a cycle that will bill every 30 days.
Field Value
Name XX-Billing cycle days : 30
Type Billing cycle days
4. Position your cursor in the Value field
Field Value
Cycle Days 30
5. (B) OK
6. Finish entering the cycle information
Field Value
Effective Date From Today’s Date
Effective Date To Leave Blank
Description (at bottom of Bill every 30 days
window)
7. (I) Save
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a Resource List with the following information:
Field Value
Resource List XX-Employee Resource List
Description Employee Resource List
Job Group Vision Corporation
Group Resources By Expenditure Category
Effective Date – From Today’s date
Effective Date – To Leave blank
For this resource list, define the following resource group:
Then associate the Employee resource group with the following resources:
Field Value
Resource List XX-Employee Resource List
Description Employee Resource List
Job Group Vision Corporation
Group Resources By Expenditure Category
Effective Dates – From Today’s date
Effective Dates – To Leave blank
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a non-billable work type for training activities with a transfer price amount type of Cost
Transfer. On the Utilization tab, enter the following:
Field Value
Unassigned Flag No
Training Flag Yes
Reduces Capacity Yes
Resource – Utilization Category Internal
Resource – Weighting Percentage 0
Organization – Utilization Category Internal
Organization – Weighting 0
Percentage
Field Value
Name XXTraining - non-billable
Billable/Capitalizable No
Transfer Price Amount Type Cost Transfer
Description Non-billable time in training
Effective Date From Today’s Date
Effective Date To Leave Blank
4. (T) Utilization
Field Value
Unassigned Flag No
Training Flag Yes
Reduces Capacity Yes
Resource – Utilization Category Internal
Resource – Weighting Percentage 0
Organization – Utilization Category Internal
Organization – Weighting 0
Percentage
5. (I) Save
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a task status with the following information:
Field Value
Status Type Task
Status XX-Delayed
System Status Not Started
Description Task is delayed
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
In the Status Controls Region, update the default control setting so as not to include it in
progress rollup. Finally, select All in the Next Allowable Statuses region.
Field Value
Status Type Task
Status XX-Delayed
System Status Not Started
Description Task is delayed
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
4. (I) Save
Action Allow
Include in Progress Rollup No (disable the check box)
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a service type with the following information:
Field Value
Code XXSURVEY
Meaning XX-Ratings Survey
Description Media Ratings Surveys
Tag Leave Blank
Effective Date From Today’s Date
Effective Date To Leave Blank
Field Value
Code XXSURVEY
Meaning XX-Ratings Survey
Description Media Ratings Surveys
Tag Leave Blank
Effective Date From Today’s Date
Effective Date To Leave Blank
5. (I) Save
6. Close the Service Types Lookups window.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a task type for tasks related to sales proposal preparation activities:
Field Value
Name XX-Preparation
Description Tasks related to sales proposal preparation
activities
Effective From Today’s Date
Effective To Leave Blank
Initial Task Status Not Started
Workflow Item Type Leave Blank
Workflow Process Leave Blank
Lead Days Leave Blank
Progress Entry Required Yes
Initial Progress Status On Track
Additional Information Page Layout Leave Blank
Enable Work Quantity No
Enable Percent Complete Collection Yes
Physical Percent Complete Derivation Cost
Method
Enable Actuals and ETC Collection Yes
Field Value
Name XX-Preparation
Description Tasks related to sales proposal preparation
activities
Effective From Today’s Date
Effective To Leave Blank
Initial Task Status Not Started
Workflow Item Type Leave Blank
Workflow Process Leave Blank
Lead Days Leave Blank
Progress Entry Required Yes
Initial Progress Status On Track
Additional Information Page Layout Leave Blank
Enable Work Quantity No
Enable Percent Complete Collection Yes
Physical Percent Complete Derivation Cost
Method
Enable Actuals and ETC Collection Yes
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a project type to track project costs for sales proposals:
Field Value
Operating Unit Accept Default Value
Name XX-Sales Proposal
Class Indirect
Description Used to track project costs for sales proposals
Effective Date From Today’s Date
Effective Date To Leave Blank
Define the following details:
Field Value
Service Type Business Development
Role List Leave Blank
Work Type Internal-Overhead
Probability List XX-General Contract
Administrative No
Unassigned Time No
Intercompany Billing No
Organization Planning No
The accounting department charges project burden costs to account for overheads and tracks
total burdened accounting.
Field Value
Burdened Yes
Schedule Internal Costing
Field Value
Allow Cost Budget Entry Yes
Cost Budget – Entry Method Project by GL Period
Cost Budget – Resource List Expenditure Category
Allow Revenue Budget Entry No
Status Reporting – Resource List Expenditure Category
The budget approval process follows a workflow notification process. Similarly, initiate a
workflow process for any changes in project status.
Field Value
Starting Project Status Unapproved
Use Workflow for Project Status Yes
changes
Use Workflow for Budget Status Yes
changes
Finally define project classifications to group your projects according to categories of your
choice.
Field Value
Operating Unit Accept Default Value
Name XX-Sales Proposal
Class Indirect
Description Used to track project costs for sales proposals
Effective Date From Today’s Date
Effective Date To Leave Blank
3. (T) Details
Field Value
Service Type Business Development
Role List Leave Blank
Work Type Internal-Overhead
Probability List XX-General Contract
Administrative No
Unassigned Time No
Intercompany Billing No
Organization Planning No
Contingent Worker Enabled No
Field Value
Burdened Yes
Schedule Internal Costing
Allow Schedule Override No
Burden Cost on Same Expenditure Yes
Item
Account for Burden Cost Components No
Enable Accounting for Total Burdened Yes
Cost
Field Value
Allow Cost Budget Entry Yes
Cost Budget – Entry Method Project by GL Period
Cost Budget – Resource List Expenditure Category
Allow Revenue Budget Entry No
Status Reporting – Resource List Expenditure Category
Field Value
Starting Project Status Unapproved
Use Workflow for Project Status Yes
changes
Use Workflow for Budget Status Yes
changes
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a project template for sales proposal projects with the following information:
Field Value
Operating Unit Vision Services (view-only)
Name T, XX Sales Proposal
Long Name T, XX Sales Proposal Template
Number T, XX Sales Proposal
Organization Services-East
Description Template for Sales Proposal
Projects
Project Type XX-Sales Proposal
Access Level Enterprise
Effective From Today’s Date
Effective To Leave Blank
Define the following Setup information:
• Enable the Structures project option
• Disable ‘Billing Accounts’ and ‘Item Associations’
• Update the Classification information with the following:
Category Code %
Reporting Classification Other Initiatives Leave Blank
• Update Team Member information by adding a new team member:
Field Value
Person Gray, Mr. Donald R
Role Project Staffing Owner
Start Date Today’s Date
Field Value
Operating Unit Vision Services (view-only)
Name T, XX Sales Proposal
Long Name T, XX Sales Proposal Template
Number T, XX Sales Proposal
Organization Services-East
Description Template for Sales Proposal
Projects
Project Type XX-Sales Proposal
Access Level Enterprise
Effective From Today’s Date
Effective To Leave Blank
5. (B) Continue
Category Code %
Reporting Classification Other Initiatives Leave Blank
(B) Apply
Field Value
Person Gray, Mr. Donald R
Role Project Staffing Owner
Start Date Today’s Date
End Date Leave Blank
(B) Apply
(H) Return to Project Template Setup
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a sales proposal project using the T, XX Sales Proposal project template created in the
previous practice. Enter the following project details:
Field Value
Source Template T, XX Sales Proposal (View-Only)
Project Number XX Sales Proposal
Project Name XX Sales Proposal
Project Manager Marlin, Ms. Amy
Industry Sector Telecommunications – Projects
primarily engaged in the
Telecommunications sector
XX-Media Sector Internet - Internet
Project Start Date Today’s Date
Project Finish Date Enter a Date Six Months from Today
From the Project Overview subtab, verify that two team members are listed. Change the Status
of the project to Approved and enter the following information on the Setup page:
Field Value
Description Internet content sales proposal
Priority High
City Coraopolis
State PA
Review the additional information (in the Other Project Setup region) to ensure that both the
workplan and financial structures are enabled and shared.
4. (B) Continue
5. Enter the Project Details
Field Value
Source Template T, XX Sales Proposal (View-Only)
Project Number XX Sales Proposal
Project Name XX Sales Proposal
Project Manager Marlin, Ms. Amy
Industry Sector Telecommunications – Projects
primarily engaged in the
Telecommunications sector
XX-Media Sector Internet - Internet
Project Start Date Today’s Date
Project Finish Date Enter a Date Six Months from Today
8. (ST) Setup
9. Modify the setup information
Change Status to Approved
(B) Change Status
Select Approved from the To field
Field Value
Description Internet content sales proposal
Priority High
City Coraopolis
State PA
Field Value
Enable Financial Structure Yes
Enable Workplan Structure Yes
Workplan and Financial Structure Shared Structures
Sharing
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a planning resource list with the following information:
Name XXConstruction
Effective From Today's Date
Effective To Leave blank
Description XXConstruction Planning Resource List
Job Group Vision Corporation
Enabled for Workplan Yes
Centrally Controlled Yes
Add a Financial Category planning resource format, with the People resource class. Similarly,
add the Financial Category resource format from the Financial Elements resource class.
Add multiple planning resources:
Select People from the list in the Resource Class field. Then select Financial
Category in the Resource Format field and add the following financial categories:
− Project Administration
− Project Management
− Staffing
Select Financial Elements from the list in the Resource Class field. Then select
Financial Category in the Resource Format field and add the following categories:
− Architect Fees
− Building Works
− Electrical Works
− Equipment
− Fees
3. (B) Create
4. Enter the header information for the new planning resource list
Name XXConstruction
Effective From Today's Date
Effective To Leave blank
Description XXConstruction Planning Resource List
Job Group Vision Corporation
Enabled for Workplan Yes
Centrally Controlled Yes
(B) Apply
Note: Oracle Projects automatically includes the following planning resources:
People, Equipment, Material Items, and Financial Elements.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a resource breakdown structure with the following information:
5. (B) Save
6. (I) Versions for your new resource breakdown structure
7. (I) Update
8. Enter the version information
(B) Apply
12. Build the third level of the hierarchy under Outline Number 1
Select Outline Number 1
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.
13. Build the third level of the hierarchy under Outline Number 2
(H) 0
Select Outline Number 2
(B) Update Child Elements
15. Build the third level of the hierarchy under Outline Number 4
(H) 0
Select Outline Number 4
(B) Update Child Elements
17. Select Apply and Freeze from the list in the Actions field
(B) Go
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Find the XX Sales Proposal project you created in an earlier practice. Select the Resource
Breakdown Structures hyperlink from the Other Project Setup region. There, select and apply
your XXConstruction resource breakdown structure. Finally review the resource breakdown
structure and all its elements.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Create a project from the Service Center Template with the following details:
Field Value
Project Number XXNONSHARED
Project Name XX Non-Shared Structures
Project Manager Marlin, Ms. Amy
Project Start Date Today's Date
Project Finish Date Two Years from Today
Verify the following structure settings:
Field Value
Structures
Financial Structure Yes
Workplan Structure Yes
Deliverables Yes
Workplan and Financial Structure Non-Shared: No Mapping
Sharing
Program Reporting
Setup project as a program Yes
Allow Linked Projects to belong to Yes
Multiple Programs
Navigate to the Workplan tab and review the workplan structure. Your project has no tasks on
the workplan structure at this time.
Similarly review the financial structure. Your project already has a financial structure that you
copied from the template when creating the project.
Select Update Financial Breakdown Structure from the list in the Actions field and review the
list in the Actions field. Note how the option to map Map Workplan to Financial Tasks is not on
Oracle Projects copies the structure information from the template to the new project.
(B) Continue
4. Complete the fields on the Create Project: Details page
Field Value
Project Number XXNONSHARED
Project Name XX Non-Shared Structures
Project Manager Marlin, Ms. Amy
Customer Name Hilman and Associates
Project Start Date Today's Date
Project Finish Date Two Years from Today
Organization Vision Corporation
(H) Structures
7. Verify the structure settings
Field Value
Structures
Financial Structure Yes
Workplan Structure Yes
Deliverables Yes
Workplan and Financial Structure Non-Shared: No Mapping
Sharing
Program Reporting
Setup project as a program Yes
Allow Linked Projects to belong to Yes
Multiple Programs
Note how the tasks in the financial structure are not the same as the tasks in the workplan
structure.
15. Select Update Financial Breakdown Structure from the list in the Actions field
16. (B) Go
17. Review the list in the Actions field
Note how the option to map Map Workplan to Financial Tasks is not on the list. The
workplan and financial structures are non-shared and you will not map workplan to financial
tasks.
18. (H) Home
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Find the XX Non-Shared Structures project and open it. Update the Financial Breakdown
Structure for this project. Create a new set of tasks:
(B) Apply
20. (H) Expand All
21. Review the new tasks
22. Select Update Tasks from the list in the Actions field
23. (B) Go
24. Update the task numbers and task names for the new tasks
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Search for the XX Non-Shared Structures project that you created in a previous practice. View
the financial tasks on this project – in the Hierarchy display as well as in the List display.
Personalize and create a view with the following information:
11. (H) Remove All in the Columns Shown and Column Order region
12. Select the following columns and arrange them in the order listed:
− Task Number
− Task Name
− Task Manager
− Task Status
− Work Type
− Chargeable
− Billable
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define an Attribute Value Set with the following details:
Field Value
Value Set Name Permit_XX
Description XX Permit Status Value Set
Data Type Char
Maximum Size 15
Validation Type Independent
Display Type Poplist
Enter two values in the value set:
Field Value
Value Set Name Permit_XX
Description XX Permit Status Value Set
Data Type Char
Maximum Size 15
Validation Type Independent
Display Type Poplist
Field Value
Value Not_Req
Description Not Required
Enabled Yes
Sequence 10
Start Date Leave Blank
End Date Leave Blank
Field Value
Value In_Process
Description In Process
Enabled Yes
Sequence 20
Start Date Leave Blank
End Date Leave Blank
9. (B) Apply
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Define a single row attribute group with the following information:
Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Description XX Building Permit Status
Behavior Single-Row
Add an attribute with the following details:
Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Sequence 10
Tip Select the Building Permit Status
Data Type Char
Column C_EXT_ATTR1
Enabled Yes
Required No
Display As Text Field
Indexed No
Value Set Name Permit_XX
Default Value In_Process
Field Value
Internal Name FileXX
Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Description XX Building Permit Status
Behavior Single-Row
Number of columns in the page Accept the default value
layout
If you select Multi-Row behavior, the system will display the attributes in the group as
column headers in a row. If you do not enable Multi-Row, the attributes will appear as
separate fields.
5. (B) Apply and Add Attributes
Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Sequence 10
Tip Select the Building Permit Status
Data Type Char
Column C_EXT_ATTR1
Enabled Yes
Required No
Display As Text Field
Indexed No
Value Set Name Permit_XX
Default Value In_Process
If you enter information in the Tip field, it will show in blue on the page as a description or a
suggestion.
Indexed, if enabled, will show all data entered and in the order entered. Enabling the
Indexed check box will also enable you to do searches on the values in the indexed
Field Value
Internal Name FileXX
Display Name Permit Archived
Sequence 20
Tip Enable check box once building permit
is archived
Data Type Char
Column C_EXT_ATTR2
Enabled Yes
Required No
Display As Checkbox
Indexed No
Default Value Leave Blank
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Add an attribute context that has the following details:
Field Value
Context Type Project Type
Value Construction
Then, with the Construction project type attribute group selected, add the following attribute
group:
− XX Building Permit Status
Select Project as the data level
Add an action to the XX Building Permit Status attribute group
Field Value
Object Name PROJECTS
Classification Construction
Attribute Group XX Building Permit Status
Sequence 10
Action Name XX Building Permit Information
Description XX Building Permit Information
Function Generate Item Description
Security Privilege Leave Blank
Execution Method User Action
Display Style Link
Prompt Application Projects
Prompt Message Name Building Permit Information
Visible Yes
Dynamic Prompt Function Leave Blank
Field Value
Context Type Project Type
Value Construction
Select the Page Regions icon for the Construction project type and define the following
information:
Field Value
Display Name XX Building Information
Description XX Building Information
Data Level Project
Internal Name XXBuilding_Info
Sequence Enter your XX number -- only use
numbers (e.g. use 77)
Field Value
Context Type Project Type
Name Construction
Note: If you have previously associated attributes with this project type, it will not appear on
the list of values on the Add Attribute Context page. Instead, return to the Attribute Contexts
page, select Project Type from the list in the Context Type Field, enter Construction in the
empty field, and select the Go button. You then select the Attribute Groups icon to add
additional attribute groups. Proceed to step 5.
5. (B) Continue
6. Search for your attribute group that has a display name of XX Building Permit Status.
7. (B) Go
7. Select the check box against your attribute group of XX Building Permit Status.
(B) Apply
Field Value
Object Name PROJECTS (view only)
Classification Construction (view only)
Attribute Group XX Building Permit Status (view only)
Sequence 10
Action Name XX Building Permit Information
Description XX Building Permit Information
Function Generate Item Description
Security Privilege Leave Blank
Execution Method User Action
(B) Apply
(H) Attribute Contexts
Field Value
Context Type Project Type
Value Construction
(B) Go
8. Select the Page Regions icon for the Construction project type
Field Value
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.
Tasks
Query for and open the Software Systems project. Open the XX Building Information page
from the Other Project Setup region.
Select a status of Not_Req for the XX Building Permit Status field and enable the Permit
Archived check box
Field Value
Project Name is Software Systems
(B) Go
Note that the default status is In_Process. You set this as the default status when you
defined the attribute group.
8. Enable the Permit Archived check box