You are on page 1of 216

R12.

x Oracle Project
Foundation Fundamentals
Supplemental Student
Practices
Activity Guide

D60119GC10
Edition 1.0
August 2012
D65133
Copyright © 2010, 2012, Oracle and/or its affiliates. All rights reserved.

Disclaimer

This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and
print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way.
Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display,
perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization
of Oracle.

The information contained in this document is subject to change without notice. If you find any problems in the document, please
report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not
warranted to be error-free.

Restricted Rights Notice

If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United
States Government, the following notice is applicable:

U.S. GOVERNMENT RIGHTS


The U.S. Government’s rights to use, modify, reproduce, release, perform, display, or disclose these training materials are restricted
by the terms of the applicable Oracle license agreement and/or the applicable U.S. Government contract.

Trademark Notice

Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective
owners.

Author
Dhanya Menon

Technical Contributors and Reviewers


Ivy Farren

This book was published using: Oracle Tutor


Table of Contents
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices ...................................1-1
R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices........................................1-3
Objectives ......................................................................................................................................................1-4
Overview of the Oracle Project Management Solution...................................................................................1-5
Oracle Projects Integration with Other Oracle Applications............................................................................1-6
Ledgers and Currencies.................................................................................................................................1-7
Organizations .................................................................................................................................................1-8
Practice - Create a Location.......................................................................................................................1-9
Solution - Create a Location.......................................................................................................................1-10
Practice - Create an Organization ..............................................................................................................1-12
Solution - Create an Organization ..............................................................................................................1-13
Practice - Add an Organization to a Global Hierarchy................................................................................1-18
Solution - Add an Organization to a Global Hierarchy................................................................................1-19
Periods and Calendars...................................................................................................................................1-22
Practice - Define Shifts...............................................................................................................................1-23
Solution - Define Shifts...............................................................................................................................1-24
Practice - Define a Calendar ......................................................................................................................1-25
Solution - Define a Calendar ......................................................................................................................1-26
Implementation Options .................................................................................................................................1-30
People Resources..........................................................................................................................................1-31
Practice - Define a Job Group ....................................................................................................................1-32
Solution - Define a Job Group ....................................................................................................................1-33
Practice - Create a Job ..............................................................................................................................1-34
Solution - Create a Job ..............................................................................................................................1-35
Practice - Define a Competence ................................................................................................................1-37
Solution - Define a Competence ................................................................................................................1-39
Practice - Enter an Employee.....................................................................................................................1-42
Solution - Enter an Employee.....................................................................................................................1-44
Project and Organization Security..................................................................................................................1-51
Practice - Define Organization Authority ....................................................................................................1-52
Solution - Define Organization Authority ....................................................................................................1-53
Roles..............................................................................................................................................................1-55
Practice - Define a Project Role .................................................................................................................1-56
Solution - Define a Project Role .................................................................................................................1-58
Practice - Assign a Project Role.................................................................................................................1-62
Solution - Assign a Project Role.................................................................................................................1-63
Practice - Define and Apply a Team Template to a Project........................................................................1-66
Solution - Define and Apply a Team Template to a Project........................................................................1-68
Practice - Use Organization Roles .............................................................................................................1-74
Solution - Use Organization Roles .............................................................................................................1-75
Page Layouts .................................................................................................................................................1-77
Practice - Define and Preview a Page Layout ............................................................................................1-78
Solution - Define and Preview a Page Layout ............................................................................................1-79
Project and Task Fundamentals.....................................................................................................................1-84
Practice - Define a Classification................................................................................................................1-85
Solution - Define a Classification................................................................................................................1-87
Practice - Define a Probability List .............................................................................................................1-90

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
i
Solution - Define a Probability List .............................................................................................................1-91
Practice - Define a Phase...........................................................................................................................1-93
Solution - Define a Phase...........................................................................................................................1-94
Practice - Define a Lifecycle.......................................................................................................................1-95
Solution - Define a Lifecycle.......................................................................................................................1-96
Practice - Define a Project Status ..............................................................................................................1-98
Solution - Define a Project Status ..............................................................................................................1-99
Practice - Define a Cycle............................................................................................................................1-101
Solution - Define a Cycle............................................................................................................................1-102
Practice - Create a Resource List ..............................................................................................................1-104
Solutions - Create a Resource List.............................................................................................................1-105
Practice - Define a Work Type ...................................................................................................................1-108
Solution - Define a Work Type ...................................................................................................................1-109
Practice - Define a Task Status..................................................................................................................1-111
Solution - Define a Task Status..................................................................................................................1-112
Practice - Define a Service Type................................................................................................................1-114
Solution - Define a Service Type................................................................................................................1-115
Practice - Define a Task Type ....................................................................................................................1-116
Solution - Define a Task Type ....................................................................................................................1-117
Practice - Define a Project Type.................................................................................................................1-119
Solution - Define a Project Type.................................................................................................................1-121
Practice - Define a Project Template..........................................................................................................1-127
Solution - Define a Project Template..........................................................................................................1-129
Practice - Create a Project from a Project Template ..................................................................................1-133
Solution - Create a Project from a Project Template ..................................................................................1-134
Resource Planning and Reporting .................................................................................................................1-139
Practice - Create a Planning Resource List................................................................................................1-140
Solution - Create a Planning Resource List................................................................................................1-141
Practice - Define a Resource Breakdown Structure ...................................................................................1-146
Solution - Define a Resource Breakdown Structure ...................................................................................1-148
Practice - Associate a Resource Breakdown Structure with a Project .......................................................1-153
Solution - Associate a Resource Breakdown Structure with a Project .......................................................1-154
Overview of Project Structures.......................................................................................................................1-156
Practice - Define a Project with Non-Shared Structure with No Mapping...................................................1-157
Solution - Define a Project with Non-Shared Structures with No Mapping .................................................1-159
Financial Structures .......................................................................................................................................1-163
Practice - Update a Financial Breakdown Structure...................................................................................1-164
Solution - Update a Financial Breakdown Structure...................................................................................1-166
Practice - View Financial Tasks .................................................................................................................1-171
Solution - View Financial Tasks .................................................................................................................1-172
Organization Forecasting ...............................................................................................................................1-175
Utilization .......................................................................................................................................................1-176
Appendix A: Integration with Oracle Sales .....................................................................................................1-177
Appendix B: Integration with Oracle Product Lifecycle Management .............................................................1-178
Appendix C: Integration with Oracle Internal Controls Manager ....................................................................1-179
Appendix D: User-Defined Attributes .............................................................................................................1-180
Practice - Define a Value Set .....................................................................................................................1-181
Solution - Define a Value Set .....................................................................................................................1-182
Practice - Define Attribute Groups..............................................................................................................1-184

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
ii
Solution - Define Attribute Groups..............................................................................................................1-186
Practice - Define Attribute Context .............................................................................................................1-190
Solution - Define Attribute Context .............................................................................................................1-192
Practice - Enter Data for User-Defined Attributes.......................................................................................1-197
Solution - Enter Data for User-Defined Attributes.......................................................................................1-198
Summary of R12.x Project Foundation Fundamentals...................................................................................1-201

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
iii
Preface
Profile

Before You Begin This Course


• Working experience with project management

How This Course Is Organized


This is an instructor-led course featuring lecture and hands-on exercises. Online demonstrations
and written practice sessions reinforce the concepts and skills that are introduced.

Required Prerequisite Courses


• R12.x Oracle E-Business Suite Essentials for Implementers Ed 1 D58324GC10

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
v
Related Publications
Oracle Publications
Title Part Number
Oracle Projects Implementation Guide E13582-03
Oracle Projects Fundamentals E13581-03

Additional Publications
• System release bulletins
• Installation and user’s guides
• Read.me files
• International Oracle User’s Group (IOUG) articles
• Oracle Magazine

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
vi
Typographic Conventions
The following two lists explain Oracle University typographical conventions for words that
appear within regular text or within code samples.

Typographic Conventions for words within regular text

Convention Object or Term Example


Courier New User input; Use the SELECT command to view
commands; information stored in the LAST_NAME
column, table, and column of the EMPLOYEES table.
schema names;
functions;
PL/SQL objects; Enter 300.
paths
Log in as scott
Initial cap Triggers; Assign a When-Validate-Item trigger to the
user interface ORD block.
object names, such
as button names
Click the Cancel button.
Italic Titles of courses For more information on the subject see
and manuals; Oracle SQL Reference Manual
emphasized words
or phrases;
Do not save changes to the database
placeholders or
placeholders or variables.
variables

Enter hostname, where hostname is the


host on which the password is to be
changed
Quotation Lesson or module This subject is covered in Lesson 3,
marks title referenced “Working with Objects.”
within a course

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
vii
Typographic Conventions (continued)
Typographic Conventions for words within code samples

Convention Object or term Example


Uppercase Commands, SELECT employee_id
functions FROM employees
Lowercase Syntax variables CREATE ROLE role
italic
Initial cap Forms triggers Form module: ORD
Trigger level: S_ITEM.QUANTITY
item
Trigger name: When-Validate-Item
. . .
Lowercase Column names, . . .
table names, OG_ACTIVATE_LAYER
Filenames, (OG_GET_LAYER ('prod_pie_layer'))
PL/SQL objects . . .
SELECT last_name
FROM employees;
Bold Text that must be CREATE USER scott
entered by a user IDENTIFIED BY tiger;

Typographic Conventions in Oracle Application Navigation Paths


This course uses simplified navigation paths, such as the following example, to direct you
through Oracle Applications.
(N) Invoice > Entry > Invoice Batches Summary (M) Query > Find (B) Approve
This simplified path translates to the following:
1. (N) From the Navigator window, select Invoice then Entry then Invoice Batches
Summary.
2. (M) From the menu, select Query then Find.
3. (B) Click the Approve button.

Notations:
(N) = Navigator
(M) = Menu
(T) = Tab
(B) = Button
(I) = Icon
(H) = Hyperlink
(ST) = Sub Tab

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
viii
Typographic Conventions (continued)
Typographical Conventions in Oracle Application Help System Paths
This course uses a “navigation path” convention to represent actions you perform to find
pertinent information in the Oracle Applications Help System.
The following help navigation path, for example—
(Help) General Ledger > Journals > Enter Journals
—represents the following sequence of actions:
1. In the navigation frame of the help system window, expand the General Ledger entry.
2. Under the General Ledger entry, expand Journals.
3. Under Journals, select Enter Journals.
4. Review the Enter Journals topic that appears in the document frame of the help system
window.

Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
ix
Copyright © 2012. Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices Table of Contents
x
R12.x Oracle Project
Foundation Fundamentals
Supplemental Student
Practices
Chapter 1

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 1
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 2
R12.x Oracle Project Foundation Fundamentals Supplemental Student
Practices

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 3
Objectives

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 4
Overview of the Oracle Project Management Solution

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 5
Oracle Projects Integration with Other Oracle Applications

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 6
Ledgers and Currencies

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 7
Organizations

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 8
Practice - Create a Location
Overview
In this practice, you will create a location.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a location for your New York branch office on the third floor of Madison Avenue. Enter
the following information:

Field Value
Scope Global
Name XXNew York
Description New York Branch Office
Address Style United States
Field Value
Address Line 1 540 Madison Avenue 3rd Floor
City New York
State NY
Zip Code 10022
County New York
Country United States
ƒ Tip: (N) Setup: Resources and Organizations: HR Foundation: Work Structures > Define
Locations

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 9
Solution - Create a Location
Create a Location
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Location window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures > Define
Locations
3. Enter the basic address information

Field Value
Scope Global
Name XXNew York
Description New York Branch Office
Address Style United States

4. Position your cursor in the Address field and enter the address

Field Value
Address Line 1 540 Madison Avenue 3rd Floor
City New York
State NY
Zip Code 10022
County New York
Country United States

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 10
5. (B) OK
6. (I) Save
7. Close the Location window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 11
Practice - Create an Organization
Overview
In this practice, you will create a new organization and assign it organization classifications.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create an organization of type XX-Branch Office at the New York location created earlier:

Field Value
Name XX-Office
Type Branch Office
From Today’s Date
Location XXNew York
Internal or External Internal
Location Address Accept Default Values
Then assign the following organization classifications to the organization:
• HR Organization
• Project Expenditure/Event Organization
• Project Task Owning Organization
• Project Invoice Collection
For the Project Expenditure/Event Organization classification, add Additional Organization
information such as the Related Organizations (operating unit = Vision Services) and the
Resource Defaults (calendar = East Standard) information. In the case of the Project Task
Owning Organization Classification, allow entry of indirect and contract projects but disallow
entry of capital projects.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 12
Solution - Create an Organization
Create an Organization
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Organization window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Organization
> Description
3. (B) New

Field Value
Name XX-Office
Type Branch Office
From Today’s Date
Location XXNew York
Internal or External Internal
Location Address Accept Default Values

4. (I) Save

Add Organization Classifications


5. Position your cursor in the Name field in the Organization Classifications region

Field Value
Name HR Organization
Enabled Yes
6. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 13
7. (I) New

Field Value
Name Project Expenditure/Event
Organization
Enabled Yes
8. (I) Save

9. (B) Others
10. Select Related Organizations in the Additional Organization Information window

11. (B) OK
12. Position your cursor in the Related Organizations field

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 14
Field Value
Operating Unit Vision Services

13. (B) OK
14. (B) OK
15. (B) Yes in the dialog box
16. (B) Others
17. Select Resource Defaults in the Additional Organization Information window
18. (B) OK
19. Position your cursor in the Resource Defaults field
Field Value
Calendar East Standard
Calendar:
− The calendar assignment at the project expenditure organization level is the default
calendar for all resources and projects in the organization.
− This calendar overrides the calendar assigned at the site level.
− Calendars are discussed in the lesson titled “Period and Calendar Definition.”

20. (B) OK
21. (B) OK
22. (B) Yes in the dialog box
23. (I) New

Field Value
Name Project Task Owning Organization
Enabled Yes
24. (I) Save
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 15
25. (B) Others
26. Position your cursor in the Project Type Class Information field

Field Value
Allow Entry of Indirect Projects Yes
Allow Entry of Capital Projects No
Allow Entry of Contract Projects Yes

27. (B) OK
28. (B) OK
29. (B) Yes in the dialog box
30. (I) New

Field Value
Name Project Invoice Collection
Organization
Enabled Yes
31. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 16
32. Close the Organization window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 17
Practice - Add an Organization to a Global Hierarchy
Overview
In this practice, you will add the organization you created in the previous practice to the Global
hierarchy.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Search for and find the organization hierarchy with the name Global. Next query the
organization with the name Services-East. Then, add your XX-Office organization as a
subordinate organization to Services-East

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 18
Solution - Add an Organization to a Global Hierarchy
Find the Organization Hierarchy and Parent Organization
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Global Organization Hierarchy window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Organization
> Global Hierarchy
3. [F11] to enter Query Mode
− Name = Global
4. [Ctrl + F11] to Execute Query
5. Position your cursor in the Name field in the Organization region
6. [F11] to enter Query Mode
− Name = Services-East
7. [Ctrl + F11] to Execute Query

Add Your New Organization to the Hierarchy


8. Position your cursor in the Name field in the Subordinates region
9. (I) New

Field Value
Name XX-Office

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 19
10. (I) Save
11. Close the Global Organization Hierarchy window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 20
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 21
Periods and Calendars

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 22
Practice - Define Shifts
Overview
In this practice, you will define a weekend shift.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define an 8 hour working (weekend) shift based on the information in the following table:

Begin Duration End Active


Dates
Weekday Time Hours Minutes Weekday Time Availability From
Types
Saturday 07:30 8 00 Saturday 15:30 Regular Today’s
Date
Sunday 07:30 8 00 Sunday 15:30 Regular Today’s
Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 23
Solution - Define Shifts
Define Shifts
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Define Shifts window
ƒ (N) Setup: System: Scheduling Calendar > Define Shifts

Field Value
Name XX-Team (Weekend Shift)
Description 8 hour weekend shift for team members
Effective Date From Today’s Date
3. Create the Shift Pattern based on the information in the following table:

Begin Duration End Active


Dates
Weekday Time Hours Minutes Weekday Time Availability From
Types
Saturday 07:30 8 00 Saturday 15:30 Regular Today’s
Date
Sunday 07:30 8 00 Sunday 15:30 Regular Today’s
Date

4. (I) Save
5. Close the Define Shifts window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 24
Practice - Define a Calendar
Overview
In this practice, you will define a calendar.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a calendar with the following basic information:

Field Value
Name XX-Project Team (weekend)
Type Team Calendar
Description XX-Project Team Calendar (weekend)
Effective Date From Today’s Date

Assign Shift and Exceptions to the Calendar


ƒ Assign the weekend shift you created in the previous practice to your new XX-Project
Team (weekend) calendar with the following information
• Enter New Years Day as an exception for the next two years

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 25
Solution - Define a Calendar
Define a Calendar
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Calendar window
ƒ (N) Setup: System: Scheduling Calendar > Define Calendar

Field Value
Name XX-Project Team (weekend)
Type Team Calendar
Description XX-Project Team Calendar (weekend)
Effective Date From Today’s Date

3. (I) Save
4. Close the Calendar window

Assign Shift and Exceptions to the Calendar


5. Navigate to the Assign Shift/Exceptions window
ƒ (N) Setup: System: Scheduling Calendar > Assign Shifts / Exceptions
6. Find your XX-Project Team Calendar (weekend)
ƒ [F11] to enter Query Mode
ƒ Enter XX% in the Calendar Name field
ƒ [Ctrl + F11] to Execute Query
7. (T) Shifts

Field Value
Sequence 1
Name XX-Team (Weekend Shift)
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 26
Duration 729
UOM Day
From Today’s Date
To Accept the Default Value

8. (T) Exceptions
9. Enter New Years Day as an exception for the next two years and save after you enter each
line

Name Reason From


New Years Day 2010 Corporate Holiday Today’s Date
New Years Day 2011 Corporate Holiday Today’s Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 27
10. (I) Save
11. Close the Assign Shift/Exceptions window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 28
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 29
Implementation Options

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 30
People Resources

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 31
Practice - Define a Job Group
Overview
In this practice, you will define a job group.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Using the Projects, Vision Services (USA) responsibility, define a job group to which you can
assign consulting project jobs. Enter the following information:

Field Value
Job Group XX-Consulting Project Jobs
Job Flexfield Structure Job Flexfield
Business Group Vision Corporation
Master Job Group No
Tip: Use the following navigation path:
• (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job >
Job Group

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 32
Solution - Define a Job Group
Define a Job Group
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Job Groups window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job > Job
Group

Field Value
Job Group XX-Consulting Project Jobs
Job Flexfield Structure Job Flexfield
Business Group Vision Corporation
Master Job Group No

3. (I) Save
4. Close the Job Groups window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 33
Practice - Create a Job
Overview
In this practice, you will create a new job and assign it to the job group you defined in the
previous practice. You will also define extra information for the job.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a billable job of a Principal Consultant that is revenue generating and can be included in
utilization. For this first enter the XX-Consulting Project Jobs Job Group and define the
following in the Job Flexfield window:

Field Value
Job Code XX1
Job Name PRINCIPAL CONSULTANT
Define the following Extra Job Information:

Field Value
Category Name Revenue Generating
Billable Yes
Include in Utilization Yes
Project Job Level 50
Project Job Code (freeform entry) XXPRCON
Schedulable Yes
Tip: Navigate to the Job window as follows:
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job >
Description

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 34
Solution - Create a Job
Create the Job
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Job window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Work Structures: Job >
Description
ƒ (B) New

3. Enter the following in the Job window:

Field Value
Job Group XX-Consulting Project Jobs
4. Position your cursor in the Name field
5. Open the Job Flexfield window (CTRL + L)

Field Value
Job Code XX1
Job Name PRINCIPAL CONSULTANT
6. (B) OK in the Job Flexfield window
7. Enter today’s date as the Start Date
8. (I) Save

Define Extra Information for the Job


9. (B) Extra Information
10. Select Job Category in the top region
11. Position your cursor in the Details field. This opens the Extra Job Information flexfield

Field Value
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 35
Category Name Revenue Generating
Billable Yes
Include in Utilization Yes
Project Job Level 50
Project Job Code (freeform entry) XXPRCON
Schedulable Yes

12. (B) OK
13. (I) Save
14. (B) OK in the Forms dialog box
15. Close the Extra Job Information and the Job windows.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 36
Practice - Define a Competence
Overview
In this practice, you will define a competence and specify the levels for the competence.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks

Define a Competence
Define a competence measuring the ability to give public presentations with the following
information:

Field Value
Scope Local (select option button)
Name XX-Ability to Give Public Presentations
Description XX-Ability to Give Public Presentations
Alias XXPUB PRES ABILITY
Cluster Normal Competence
Further Information Leave Blank
Choose “Levels” as the method you will employ to evaluate the competence.
Define the evaluation information as follows:

Field Value
Primary Evaluation Method Observation
Renewal Period 2.
Units Year
Certification Required No
Behavioral Indicator Leave Blank

Finally define the levels of the competence on a scale of 1 to 5:

Levels Name
1 Poor
2 Below Average

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 37
3 Average
4 Above Average
5 Outstanding

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 38
Solution - Define a Competence
Define a Competence
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Competencies window
ƒ (N) Setup: Resources and Organizations: HR Foundation: Career Management >
Competencies
3. (B) New

Field Value
Scope Local (select option button)
Name XX-Ability to Give Public Presentations
Description XX-Ability to Give Public Presentations
Alias XXPUB PRES ABILITY
Cluster Normal Competence
Further Information Leave Blank
4. (T) Valid Date and Proficiency

Field Value
Valid Dates: From Today’s Date
Valid Dates: To Leave Blank
Proficiency Levels (select option button)
5. Define the evaluation information

Field Value
Primary Evaluation Method Observation
Renewal Period 2.
Units Year
Certification Required No
Behavioral Indicator Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 39
6. (I) Save

Specify Levels for the Competence


7. (B) Levels
8. Define the levels for the rating scale. You must SAVE after entering each level. Optionally,
include Behavioral Indicator information for each level.

Levels Name
1 Poor
2 Below Average
3 Average
4 Above Average
5 Outstanding
9. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 40
10. Close the Levels and Competencies windows.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 41
Practice - Enter an Employee
Overview
In this practice, you will enter a new employee

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define an employee with basic information as follows:

Field Value
Last XXStudent
First Enter your first name
Title Select a title
Gender Select a gender
Action Create Employment
Person Types Employee ((B) OK to accept)
Social Security XX1-23-5555
Enter Personal information and Office Details as follows:

Field Value
Birth Date 01-JAN-1970
Latest Start Date Today’s Date
Email XXstudent@vision.com
Mail To Home
Enter the following Address details:

Field Value
Address Line 1 203 N. LaSalle Street
City Chicago
State IL
Zip Code 60600
County Cook
Country United States
Define the competence profile of the employee with the following information:
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 42
Competence Proficiency Level Date From Source of Proficiency
Rating
XX-Ability to Give Public 4 - Above Today’s Date Previous Experience
Presentations Average
Functional.Management 5 - Expert Today’s Date Reference Indication
Skills
Define the employee’s HRMS assignment:

Field Value
Organization Services-Central
Job CON600.Consultant
Position CON686.PRINCIPAL
CONSULTANT
Payroll Vision Monthly
Location S1 - Chicago
Status Active Assignment
Supervisor Name Marlin, Ms. Amy
Supervisor Number 34

Define the Statutory Information:

Field Value
Government Reporting Entity Vision Corporation

Finally, in the Project Information tab, define the Billing Title for the employee:

Field Value
Billing Title Project Consultant

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 43
Solution - Enter an Employee
Enter Basic Employee Information
1. Responsibility = Human Resources, Vision Enterprises
2. Navigate to the People window
ƒ (N) People > Enter and Maintain
3. (B) New

Field Value
Last XXStudent
First Enter your first name
Title Select a title
Gender Select a gender
Action Create Employment
Person Types Employee ((B) OK to accept)
Social Security XX2-23-5555
4. (T) Personal

Field Value
Birth Date 01-JAN-1970
Latest Start Date Today’s Date
5. (T) Office Details

Field Value
Email XXstudent@vision.com
Mail To Home
6. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 44
7. (B) Address
8. Position your cursor in the Address field. This will open the Address window.

Field Value
Address Line 1 203 N. LaSalle Street
City Chicago
State IL
Zip Code 60198
County Cook
Country United States
9. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 45
10. Close the Address window

Record Competencies
11. (B) Others
12. Select Competence Profile from the list

13. (B) OK
14. Enter the competence information for the employee:

Competence Proficiency Level Date From Source of Proficiency


Rating
XX-Ability to Give Public 4 - Above Today’s Date Previous Experience
Presentations Average

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 46
Functional.Management 5 - Expert Today’s Date Reference Indication
Skills
15. (I) Save

16. Close the Competence Profile window

Define the Employee’s HRMS Assignment


17. (B) Assignment

Field Value
Organization Services-Central
18. (B) Correction
19. (B) Cancel in the People Group Flexfield
20. Enter the job and position information
Field Value
Job CON600.Consultant
Position CON686.Principal Consultant
21. (B) Yes in the Decision dialog box
22. Enter the remaining basic assignment information

Field Value
Payroll Vision Monthly
Location S1 - Chicago
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 47
Status Active Assignment
Assignment Accept Default Value
Number
23. (T) Supervisor

Field Value
Name Marlin, Ms. Amy
Number 34
24. (T) Statutory Information
25. Place your cursor in the long white field. This will open the GREs and Other Data window.

Field Value
Government Reporting Entity Vision Corporation

26. (B) OK in the GREs and Other Data window


27. (T) Project Information
To see additional tabs, click on the tab list icon

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 48
Field Value
Billing Title Project Consultant
28. (I) Save

29. Close the Assignment and People windows.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 49
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 50
Project and Organization Security

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 51
Practice - Define Organization Authority
Overview
In this practice, you will define organization authority for a resource.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define Organization Authority for the following resource:
− Anthony, Elaine XX
Note: Elaine Anthony is available for the numbers 00-16. If your XX number is greater than
16, consult with your instructor.
Use the details in the following table to define the Organization Authority for your resource:

Field Value
Hierarchy Global
Version 1
Start Organization Services-Central
Project Authority Yes
Resource Authority No
Primary Contact No
Forecast Authority Yes
Forecast -- Primary No
Contact
Utilization Authority Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 52
Solution - Define Organization Authority
Define Organization Authority
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Resource window
ƒ (N) Setup: Resources and Organizations > Organization Authority
3. Find the organization authority assigned to a resource
− Resource Name = Anthony, Elaine XX
Note: Elaine Anthony is available for the numbers 00-16, if your XX number is greater than
16, consult with your instructor.
4. (B) Find Organizations
Note: Elaine Anthony has no organization authority at this time.
5. (B) Add Organizations

Field Value
Hierarchy Global
Version 1
Start Organization Services-Central
Project Authority Yes
Resource Authority No
Primary Contact No
Utilization Authority Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 53
6. (B) OK
7. (I) Save

8. Close the Resource window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 54
Roles

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 55
Practice - Define a Project Role
Overview
In this practice, you will define a project role.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Using the Projects, Vision Services (USA) responsibility, define basic role information as
follows:

Field Value
Name XX-Implementation
Consultant
Description Implementation Consultant
Effective Date From Today’s Date
Effective Date To Leave Blank
Enforce role-based security Yes
Menu Project Manager Role
Menu
Tip: (N) Setup: Projects > Roles
Assign controls to the role using the single right-arrow button:
− Allow as Project Member
− Allow Scheduling
− Allow Labor Cost Query
Assign a role list to the role using the single-right arrow button:
− Construction
Define Job information for the role as follows:

Field Value
Default Job Group XX-Consulting Project Jobs
Default Job name XX1.PRINCIPAL
CONSULTANT
Project Resource Job Global
Group
Minimum Job Level 27
Maximum Job Level 47

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 56
Define the following competencies for the role:

Name Description Proficiency Level Mandatory?


Language.English Defaults 3 Yes
Core.Presentation Skills Defaults 2 No
Project Defaults 4 No
Management.Experience
Select the User Status Level option button and define the following statuses:

User Status Menu


Pending Close Team Member Role Menu
Closed Team Member Role Menu

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 57
Solution - Define a Project Role
Define a Project Role
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Roles window
ƒ (N) Setup: Projects > Roles

Field Value
Name XX-Implementation
Consultant
Description Implemenation Consultant
Effective Date From Today’s Date
Effective Date To Leave Blank
Enforce role-based security Yes
Menu Project Manager Role
Menu
3. (I) Save
4. (T) Controls
ƒ Assign controls to the role using the single right-arrow button:
− Allow as Project Member
− Allow Scheduling
− Allow Labor Cost Query

5. (I) Save
6. (T) Role Lists
ƒ Assign a role list to the role using the single-right arrow button:
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 58
− Construction
7. (I) Save

8. (T) Jobs

Field Value
Default Job Group XX-Consulting Project Jobs
Default Job name XX1.PRINCIPAL
CONSULTANT
Project Resource Job Global
Group
Default Minimum Job Level 27
Default Maximum Job 47
Level
9. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 59
10. (T) Competencies

Name Description Proficiency Mandatory?


Level
Language.English Accept Default Value 3 Yes
Core.Presentation Skills Accept Default Value 2 No
Project Accept Default Value 4 No
Management.Experience

11. (I) Save


Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 60
12. (T) Project Status
13. Select the User Status Level option button
14. Define the status information

User Status Menu


Pending Close Team Member Role Menu
Closed Team Member Role Menu

For team members with this role on a project, when the project has a user status of
Pending Close or Closed, their access on the project will be determined by the Team
Member Role Menu. When the project has any other status, their access will be controlled
by Project Manager Role Menu.
15. (I) Save
16. Close the Roles window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 61
Practice - Assign a Project Role
Overview
In this practice, you will assign a new project team member the project role you created in the
previous practice.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Using Project SU, Vision Services (USA) responsibility, search for and find the Cost Plus
project. From the Shortcuts list, select Add Team Members and enter Emily Heather as your
team member. You will assign to her the role XX-Project Director that you created earlier:

Field Value
Person Heather, Ms. Emily
Role XX-Implementation Consultant
Start Date Today’s Date
End Date Any date beyond today
Scheduled Member Yes
Finally, review Emily Heather’s information from the Team Members page.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 62
Solution - Assign a Project Role
Assign a Project Role
1. Responsibility = Project SU, Vision Services (USA)
2. Navigate to the Project List page
ƒ (N) Projects: Delivery > Project List
3. (H) Cost Plus
4. Select Add Team Members from the Shortcuts list

5. (B) Go
6. Enter a new team member

Field Value
Person Heather, Ms. Emily
Role XX-Implementation Consultant
Start Date Today’s Date
End Date Any date beyond today
Scheduled Member Yes

7. (B) Apply.
8. Review the team members on the project
• Select the All Members option
• (B) Go

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 63
9. (H) Heather, Ms. Emily
ƒ Review Emily Heather’s information

10. (H) Home.


Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 64
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 65
Practice - Define and Apply a Team Template to a Project
Overview
In this practice, you will first define and apply a team template.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a team template for project management roles with the following information:

Field Value
Template Name T, XX Management Team
Description Team Template for Project Management Roles
Effective Date From Today's Date
Effective Date To Leave Blank
Calendar East Standard
Work Type Commercial Customer-billable
Role List Administration
Team Start Date Today's Date
Add a requirement of a project manager:

Field Value
Role Project Manager (search and select from list
of values)
Team Role Project Manager
Start Date Today's Date
End Date 1 Year from Today
Schedule Status Open
Staffing Priority Critical
Subteam Leave Blank
Work Type Commercial Customer-billable
Country Canada (search and select)
State/Region Leave Blank
City Leave Blank
Minimum Job Level 25
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 66
Maximum Job Level 40
Calendar East Standard
Description Leave Blank
Additional Staffing Leave Blank
Information
Number of Copies 1
Define the following competence requirements for this role:

Alias Name Local Mandatory Exclude


Proficiency
Level
Eng Language.English 4 Yes No
WRITCOM Core.Written Communication 3 No No
present Core.Presentation Skills 3 No No
ORALCOMM Core.Oral Communication 3 No No
PM - Project Management.Experience 3 Yes No
Experience
BRD Functional.Business 4 Yes No
Requirements Definition
Finally, search for and find the Cost Plus project. From the Resources tab, select Apply Team
Template and apply the T, XX Management Team template to this project. View the workflow
notification on the Project Home page. On the Resources tab, you will see that the Project
Manager role has been added to the project.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 67
Solution - Define and Apply a Team Template to a Project
Define the Basic Team Template Information
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Define Team Templates page
ƒ (N) Projects: Setup > Team Templates

3. (B) Create Template


4. Define the basic team template information

Field Value
Template Name T, XX Management Team
Description Team Template for Project Management Roles
Effective Date From Today's Date
Effective Date To Leave Blank
Calendar East Standard
Work Type Commercial Customer-billable
Role List Administration
Team Start Date Today's Date
• Leave the Subteams section blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 68
• (B) Save and Add Requirement

Add a Requirement
5. Define the basic information for the first requirement

Field Value
Role Project Manager (search and select from list
of values)
Team Role Project Manager
Start Date Today's Date
End Date 1 Year from Today
Schedule Status Open
Staffing Priority Critical
Subteam Leave Blank
Work Type Commercial Customer-billable
Country Canada (search and select)
State/Region Leave Blank
City Leave Blank
Minimum Job Level 25

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 69
Maximum Job Level 40
Calendar East Standard
Description Leave Blank
Additional Staffing Leave Blank
Information
Number of Copies 1

Define competence requirements


6. (T) Competencies
7. Verify and update the competence information

Alias Name Local Mandatory Exclude


Proficiency
Level
Eng Language.English 4 Yes No
WRITCOM Core.Written Communication 3 No No
present Core.Presentation Skills 3 No No
ORALCOMM Core.Oral Communication 3 No No
PM - Project Management.Experience 3 Yes No
Experience

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 70
BRD Functional.Business 4 Yes No
Requirements Definition

Note: At a time, you can view 10 rows in the Competencies tab. If you have more than ten rows,
use the Next and Previous hyperlinks to view the rows.
8. Select Return to Team Template Details from the list in the Apply and field
ƒ (B) Go

ƒ (B) Save
9. (H) Home

Open the Project


10. Navigate to the Search Projects page
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 71
ƒ (N) Projects: Delivery > Project List
ƒ (H) Cost Plus

Applying a team template


11. (T) Resources
12. Navigate to the Apply Team Templates page
ƒ Select Apply Team Template from the Actions field
ƒ (B) Go

13. Select the team template created, T, XX Management Team


14. (B) Apply
15. (B) OK on the Confirmation page

16. Navigate to the Project homepage to view the workflow notification


ƒ (T) Project
ƒ Note: You may need to refresh this page to view the notification.

17. Navigate to the Scheduled People page to view the team roles applied to the project
ƒ (T) Resources
ƒ Note that Project Manager has been added as a Team Role.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 72
18. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 73
Practice - Use Organization Roles
Overview
In this practice, you will first define an organization role. Next, you will add an organization to a
project and assign it the role you just defined.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Use the Projects SU, Vision Services (USA) responsibility, navigate to the Organization Roles
page and add an organization role with the following information:

Field Value
Role Class Partner
Role Name XX-Auditor
Effective From Today’s Date
Effective To Leave Blank
Description Independent Auditors for a Project
Search for the Cost Plus project and open it. Select the Organizations hyperlink in the Other
Project Setup section and, add an organization with the following details:

Field Value
Organization Cap Financials
Role XX-Auditor

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 74
Solution - Use Organization Roles
Define an Organization Role
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Organization Roles page
ƒ (N) Projects: Setup > Organization Roles
3. (B) Add Organization Role

Field Value
Role Class Partner
Role Name XX-Auditor
Effective From Today’s Date
Effective To Leave Blank
Description Independent Auditors for a Project

4. (B) Apply
5. (H) Home

Assign an Organization Role


6. Navigate to the Project List page
ƒ (N) Projects: Delivery > Project List
7. (H) Cost Plus
8. (T) Project > (ST) Setup
9. (H) Organizations in the Other Project Setup section

10. (B) Add Organization

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 75
Field Value
Organization Cap Financials
Role XX-Auditor

11. (B) Continue


12. (H) Return to Organizations

13. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 76
Page Layouts

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 77
Practice - Define and Preview a Page Layout
Overview
In this practice, you will define and preview a new Task Overview page layout.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
With the Projects SU, Vision Services (USA) responsibility, navigate to the Page Layouts page.
Select Task Overview from the list in the Create Page field and Select Page Layouts from the
Setup Method field. Define the basic team member home page layout information:

Field Value
Type (View Only) Task Overview
Name XX Task Overview Page Layout
Description XX Task Overview Page Layout
Effective From Today's Date
Effective To Leave Blank
Define the following sections:

Sections
Current Schedule
Progress History
Progress
Preview the page layout and finally apply it.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 78
Solution - Define and Preview a Page Layout
Define a Page Layout
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Page Layouts page
ƒ (N) Projects: Setup > Page Layouts
3. Select Task Overview from the list in the Create Page field
4. Select Page Layouts from the list in the Setup Method field

5. (B) Go
6. Define the basic team member home page layout information

Field Value
Type (View Only) Task Overview
Name XX Task Overview Page Layout
Description XX Task Overview Page Layout
Effective From Today's Date
Effective To Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 79
7. Define the sections
ƒ (B) Select Sections
ƒ Select the available sections
ƒ (H) Move

Sections
Current Schedule
Progress History
Progress

ƒ (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 80
Preview the Task Overview Page Layout
8. (B) Save and Preview
9. Review the page layout.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 81
10. (H) Return to Create Page Layout
11. (B) Apply
12. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 82
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 83
Project and Task Fundamentals

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 84
Practice - Define a Classification
Overview
In this practice, you will define a classification and its class codes.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a media sector class category to classify media projects with the following information:

Field Value
Class Category XX-Media Sector
Description Used to classify media projects
Mandatory No
AutoAccounting No
Allow One Code Only Yes
Allow Percent Entry No
Total Percent Equal 100 No
For All Project Types No
Include in Project Yes
Intelligence
Effective Dates – From Today’s Date
Effective Dates – To Leave Blank
For this classification, enter the following class codes:

Name Description Effective Dates – From


Television Television Today’s Date
Radio Radio Today’s Date
Internet Internet Today’s Date
Print Print Today’s Date

Then associate this class category with two project types – Time and Materials, and Cost Plus:

Project Type (Operating Unit) Description Mandatory


Time and Materials (Vision Services) Accept Default No

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 85
Value
Cost Plus (Vision Services) Accept Default No
Value

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 86
Solution - Define a Classification
Define a Classification
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Class Categories and Codes window
ƒ (N) Setup: Projects > Classifications

Field Value
Class Category XX-Media Sector
Description Used to classify media projects
Mandatory No
AutoAccounting No
Allow One Code Only Yes
Allow Percent Entry No
Total Percent Equal 100 No
For All Project Types No
Include in Project Yes
Intelligence
Effective Dates – From Today’s Date
Effective Dates – To Leave Blank
3. (I) Save
4. (T) Class Codes
5. Enter the class codes for the classification:

Name Description Effective Dates – From


Television Television Today’s Date
Radio Radio Today’s Date
Internet Internet Today’s Date
Print Print Today’s Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 87
6. (T) Project Types
To see the operating unit for each project type; you must widen the list of values. Class
categories and codes are shared across operating units.

Project Type (Operating Unit) Description Mandatory


Time and Materials (Vision Services) Accept Default No
Value
Cost Plus (Vision Services) Accept Default No
Value

7. (B) OK
8. (I) Save
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 88
9. Close the Class Categories and Codes window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 89
Practice - Define a Probability List
Overview
In this practice, you will define a probability list.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a general probability list for contract projects with the following probability values:

Percentage Description Effective Date From


0 On Hold / Canceled / Lost / Deleted Today’s Date
25 Prospect / Customer Presentations Today’s Date
Underway
50 Short Listed / Strong Chance of Winning Today’s Date
75 Discussions / Q and A Went Very Well Today’s Date
100 Contract Processed Today’s Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 90
Solution - Define a Probability List
Define a Probability List
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Probability Lists window
ƒ (N) Setup: Projects > Probability Lists

Field Value
Name XX-General Contract
Description General Probability List for Contract Projects
Effective Date From Today’s Date
Effective Date To Leave Blank
3. (I) Save
4. Define the probability values

Percentage Description Effective Date From


0 On Hold / Canceled / Lost / Deleted Today’s Date
25 Prospect / Customer Presentations Today’s Date
Underway
50 Shortlisted / Strong Chance of Winning Today’s Date
75 Discussions / Q&A Went Very Well Today’s Date
100 Contract Processed Today’s Date
5. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 91
6. Close the Probability Lists window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 92
Practice - Define a Phase
Overview
In this practice, you will define a phase.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a status type of “phase” with the following information:

Field Value
Status Type Phase
Status XX-Build
System Status General
Description Physical compilation of designed structures
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 93
Solution - Define a Phase
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Statuses window
ƒ (N) Setup: System > Statuses
3. (T) General

Field Value
Status Type Phase
Status XX-Build
System Status General
Description Physical compilation of designed structures
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
4. (I) Save

5. Close the Statuses window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 94
Practice - Define a Lifecycle
Overview
In this practice, you will define a basic lifecycle for construction projects.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a lifecycle for construction projects with the following basic information:

Field Value
Name XX Construction Lifecycle
Short Name XX Construction Lifecycle
Description Basic, high level phases for the lifecycle of a Construction project
Enable for Projects Yes
Enable for Items Yes
Enter the following phases for the lifecycle:

Sequence Phase Short Name Name Description


Number
1 Concept Concept Concept Accept Default Value
2 Design Design Design Accept Default Value
3 Regulatory Regulatory Regulatory Accept Default Value
4 XX-Build XX-Build XX-Build Accept Default Value
5 Demobilization Demobilization Demobilization Accept Default Value

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 95
Solution - Define a Lifecycle
Define a Lifecycle
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Lifecycles page
ƒ (N) Projects: Setup > Lifecycles
3. (B) Create Lifecycle

Field Value
Name XX Construction Lifecycle
Short Name XX Construction Lifecycle
Description Basic, high level phases for the lifecycle of a Construction project
Enable for Projects Yes
Enable for Items Yes

4. Enter the lifecycle phases

Sequence Phase Short Name Name Description


Number
1 Concept Concept Concept Accept Default Value
2 Design Design Design Accept Default Value
3 Regulatory Regulatory Regulatory Accept Default Value
4 XX-Build XX-Build XX-Build Accept Default Value
5 Demobilization Demobilization Demobilization Accept Default Value

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 96
5. (B) Apply
6. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 97
Practice - Define a Project Status
Overview
In this practice, you will define a project status that does not allow invoice generation.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a project status of type Project and status XX-Billing Hold that allows charges and
revenue, but not invoice generation and workflows. To do this, modify the default status controls
to disallow invoice generation. Then enter any two next allowable statuses – Approved and
Pending Close.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 98
Solution - Define a Project Status
Define a Project Status
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Statuses window
ƒ (N) Setup: System > Statuses
3. (T) General

Field Value
Status Type Project
Status XX-Billing Hold
System Status Approved
Description Allows charges and revenue, but
no invoice generation; no workflow
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No

4. (I) Save

Modify Status Controls


5. In the Status Controls Region, modify the default controls to disallow invoice generation:

Action Allow

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 99
Generate Invoice No (clear the check box)
6. (I) Save

Set Next Allowable Statuses


7. In the Next Allowable Statuses Region, select the Status option button and enter the next
allowable statuses:

Next Allowable Statuses


Approved
Pending Close
8. (I) Save

9. Close the Statuses window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 100
Practice - Define a Cycle
Overview
In this practice, you will define a cycle.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a billing cycle of 30 days. In other words, define a cycle that will bill every 30 days.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 101
Solution - Define a Cycle
Define a Cycle
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Cycles window
ƒ (N) Setup: System > Cycles
3. (I) New

Field Value
Name XX-Billing cycle days : 30
Type Billing cycle days
4. Position your cursor in the Value field

Field Value
Cycle Days 30

5. (B) OK
6. Finish entering the cycle information

Field Value
Effective Date From Today’s Date
Effective Date To Leave Blank
Description (at bottom of Bill every 30 days
window)
7. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 102
8. Close the Cycles window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 103
Practice - Create a Resource List
Overview
In this practice, you will create a resource list and assign a resource group to it.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a Resource List with the following information:

Field Value
Resource List XX-Employee Resource List
Description Employee Resource List
Job Group Vision Corporation
Group Resources By Expenditure Category
Effective Date – From Today’s date
Effective Date – To Leave blank
For this resource list, define the following resource group:

Group Alias Control Levels Order Enabled


Employee Employee None 1 Yes

Then associate the Employee resource group with the following resources:

Resource Type Resource Alias Control Levels Order Enabled


Employee Marlin, Ms. Amy Marlin, Ms. Amy None 1 Yes
Employee Jason, Mr. Robert Jason, Mr. Robert None 2 Yes
Employee Gray, Mr. Donald R. Gray, Mr. Donald R. None 3 Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 104
Solutions - Create a Resource List
Define a Resource List
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Resource Lists window
ƒ (N) Setup: Budgets > Resource Lists

Field Value
Resource List XX-Employee Resource List
Description Employee Resource List
Job Group Vision Corporation
Group Resources By Expenditure Category
Effective Dates – From Today’s date
Effective Dates – To Leave blank

3. Position your cursor in the Group field.


4. Enter the following details for the resource group:

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 105
Group Alias Control Levels Order Enabled
Employee Employee None 1 Yes

5. Position your cursor in the Resource Type field.


6. Enter the following resource details for the Employee resource group:

Resource Type Resource Alias Control Levels Order Enabled


Employee Marlin, Ms. Amy Marlin, Ms. Amy None 1 Yes
Employee Jason, Mr. Robert Jason, Mr. Robert None 2 Yes
Employee Gray, Mr. Donald R. Gray, Mr. Donald R. None 3 Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 106
7. (I) Save
8. Close the Resource Lists window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 107
Practice - Define a Work Type
Overview
In this practice, you will define a non-billable work type for training activities.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a non-billable work type for training activities with a transfer price amount type of Cost
Transfer. On the Utilization tab, enter the following:

Field Value
Unassigned Flag No
Training Flag Yes
Reduces Capacity Yes
Resource – Utilization Category Internal
Resource – Weighting Percentage 0
Organization – Utilization Category Internal
Organization – Weighting 0
Percentage

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 108
Solution - Define a Work Type
Define a Work Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Work Types window
ƒ (N) Setup: Utilization > Work Types
3. (T) Description, Dates

Field Value
Name XXTraining - non-billable
Billable/Capitalizable No
Transfer Price Amount Type Cost Transfer
Description Non-billable time in training
Effective Date From Today’s Date
Effective Date To Leave Blank

4. (T) Utilization

Field Value
Unassigned Flag No
Training Flag Yes
Reduces Capacity Yes
Resource – Utilization Category Internal
Resource – Weighting Percentage 0
Organization – Utilization Category Internal
Organization – Weighting 0
Percentage
5. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 109
6. Close the Work Types window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 110
Practice - Define a Task Status
Overview
In this practice, you will define a task status.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a task status with the following information:

Field Value
Status Type Task
Status XX-Delayed
System Status Not Started
Description Task is delayed
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
In the Status Controls Region, update the default control setting so as not to include it in
progress rollup. Finally, select All in the Next Allowable Statuses region.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 111
Solution - Define a Task Status
Define a Task Status
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Statuses window
ƒ (N) Setup: System > Statuses
3. (T) General

Field Value
Status Type Task
Status XX-Delayed
System Status Not Started
Description Task is delayed
Effective Date – From Today’s Date
Effective Date – To Leave Blank
Starting Status No
4. (I) Save

Update Status Control


5. In the Status Controls Region, update the default control setting

Action Allow
Include in Progress Rollup No (disable the check box)

Set Next Allowable Statuses


6. In the Next Allowable Statuses Region, select the All option button
7. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 112
8. Close the Statuses window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 113
Practice - Define a Service Type
Overview
In this practice, you will define a service type.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a service type with the following information:

Field Value
Code XXSURVEY
Meaning XX-Ratings Survey
Description Media Ratings Surveys
Tag Leave Blank
Effective Date From Today’s Date
Effective Date To Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 114
Solution - Define a Service Type
Define a Service Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Service Type Lookups window
ƒ (N) Setup: Projects > Service Types
3. Position your cursor in the first Code field
4. (I) New

Field Value
Code XXSURVEY
Meaning XX-Ratings Survey
Description Media Ratings Surveys
Tag Leave Blank
Effective Date From Today’s Date
Effective Date To Leave Blank

5. (I) Save
6. Close the Service Types Lookups window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 115
Practice - Define a Task Type
Overview
In this practice, you will define a task type.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a task type for tasks related to sales proposal preparation activities:

Field Value
Name XX-Preparation
Description Tasks related to sales proposal preparation
activities
Effective From Today’s Date
Effective To Leave Blank
Initial Task Status Not Started
Workflow Item Type Leave Blank
Workflow Process Leave Blank
Lead Days Leave Blank
Progress Entry Required Yes
Initial Progress Status On Track
Additional Information Page Layout Leave Blank
Enable Work Quantity No
Enable Percent Complete Collection Yes
Physical Percent Complete Derivation Cost
Method
Enable Actuals and ETC Collection Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 116
Solution - Define a Task Type
Define a Task Type
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Task Types page
ƒ (N) Projects: Setup > Task Types
3. (B) Create Task Type
4. Enter the task type information

Field Value
Name XX-Preparation
Description Tasks related to sales proposal preparation
activities
Effective From Today’s Date
Effective To Leave Blank
Initial Task Status Not Started
Workflow Item Type Leave Blank
Workflow Process Leave Blank
Lead Days Leave Blank
Progress Entry Required Yes
Initial Progress Status On Track
Additional Information Page Layout Leave Blank
Enable Work Quantity No
Enable Percent Complete Collection Yes
Physical Percent Complete Derivation Cost
Method
Enable Actuals and ETC Collection Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 117
5. (B) Apply
6. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 118
Practice - Define a Project Type
Overview
In this practice, you will define a project type for indirect projects.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a project type to track project costs for sales proposals:

Field Value
Operating Unit Accept Default Value
Name XX-Sales Proposal
Class Indirect
Description Used to track project costs for sales proposals
Effective Date From Today’s Date
Effective Date To Leave Blank
Define the following details:

Field Value
Service Type Business Development
Role List Leave Blank
Work Type Internal-Overhead
Probability List XX-General Contract
Administrative No
Unassigned Time No
Intercompany Billing No
Organization Planning No

The accounting department charges project burden costs to account for overheads and tracks
total burdened accounting.

Field Value
Burdened Yes
Schedule Internal Costing

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 119
Burden Cost on Same Expenditure Yes
Item
Account for Burden Cost Components No
Enable Accounting for Total Burdened Yes
Cost
The department also uses a cost budget for all the resources, defined at the project level by GL
period:

Field Value
Allow Cost Budget Entry Yes
Cost Budget – Entry Method Project by GL Period
Cost Budget – Resource List Expenditure Category
Allow Revenue Budget Entry No
Status Reporting – Resource List Expenditure Category
The budget approval process follows a workflow notification process. Similarly, initiate a
workflow process for any changes in project status.

Field Value
Starting Project Status Unapproved
Use Workflow for Project Status Yes
changes
Use Workflow for Budget Status Yes
changes
Finally define project classifications to group your projects according to categories of your
choice.

Category Description Mandatory


Industry Sector Accept Default Yes
Reporting Classification Accept Default No
XX-Media Sector Accept Default No

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 120
Solution - Define a Project Type
Define a Project Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Project Types window
ƒ (N) Setup: Projects > Project Types

Field Value
Operating Unit Accept Default Value
Name XX-Sales Proposal
Class Indirect
Description Used to track project costs for sales proposals
Effective Date From Today’s Date
Effective Date To Leave Blank
3. (T) Details

Field Value
Service Type Business Development
Role List Leave Blank
Work Type Internal-Overhead
Probability List XX-General Contract
Administrative No
Unassigned Time No
Intercompany Billing No
Organization Planning No
Contingent Worker Enabled No

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 121
4. (T) Costing Information

Field Value
Burdened Yes
Schedule Internal Costing
Allow Schedule Override No
Burden Cost on Same Expenditure Yes
Item
Account for Burden Cost Components No
Enable Accounting for Total Burdened Yes
Cost

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 122
5. (T) Budget Option

Field Value
Allow Cost Budget Entry Yes
Cost Budget – Entry Method Project by GL Period
Cost Budget – Resource List Expenditure Category
Allow Revenue Budget Entry No
Status Reporting – Resource List Expenditure Category

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 123
6. (T) Project Status, Workflow

Field Value
Starting Project Status Unapproved
Use Workflow for Project Status Yes
changes
Use Workflow for Budget Status Yes
changes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 124
7. (T) Classifications

Category Description Mandatory


Industry Sector Accept Default Yes
Reporting Classification Accept Default No
XX-Media Sector Accept Default No
8. (I) Save

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 125
9. Close the Project Types window.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 126
Practice - Define a Project Template
Overview
In this practice, you will define a project template for sales proposal projects.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a project template for sales proposal projects with the following information:

Field Value
Operating Unit Vision Services (view-only)
Name T, XX Sales Proposal
Long Name T, XX Sales Proposal Template
Number T, XX Sales Proposal
Organization Services-East
Description Template for Sales Proposal
Projects
Project Type XX-Sales Proposal
Access Level Enterprise
Effective From Today’s Date
Effective To Leave Blank
Define the following Setup information:
• Enable the Structures project option
• Disable ‘Billing Accounts’ and ‘Item Associations’
• Update the Classification information with the following:

Category Code %
Reporting Classification Other Initiatives Leave Blank
• Update Team Member information by adding a new team member:

Field Value
Person Gray, Mr. Donald R
Role Project Staffing Owner
Start Date Today’s Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 127
End Date Leave Blank
Finally, define Quick Entry settings such as the following:

Order Field Name Specification Prompt Required


10 Project Number Project Number Yes
20 Project Name Project Name Yes
30 Key Member Project Manager Project Manager Yes
40 Classification Industry Sector Industry Sector Yes
50 Classification XX-Media Sector XX-Media Sector No
60 Project Start Date Project Start Date Yes
70 Project Finish Project Finish Yes
Date Date

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 128
Solution - Define a Project Template
Define the Basic Template Information
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Project Templates page
ƒ (N) Projects: Setup > Project Templates
3. (B) Create Template
4. Define the template information

Field Value
Operating Unit Vision Services (view-only)
Name T, XX Sales Proposal
Long Name T, XX Sales Proposal Template
Number T, XX Sales Proposal
Organization Services-East
Description Template for Sales Proposal
Projects
Project Type XX-Sales Proposal
Access Level Enterprise
Effective From Today’s Date
Effective To Leave Blank

5. (B) Continue

Define the Setup Options


6. (H) Expand All in the Setup Options section
7. Enable the following project options (select the Enable check box next to the option):
− Structures

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 129
8. Disable the following project options (clear the Enable check box next to the option):
− Billing Accounts
− Item Associations

9. Update the Classification information


ƒ (I) Update (pencil) in the Classifications row
ƒ Enter the Classification information

Category Code %
Reporting Classification Other Initiatives Leave Blank
ƒ (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 130
10. Update the Team Member information
ƒ (I) Update (pencil) in the Team Members row
ƒ (B) Add Team Members
ƒ Enter the Team Member information

Field Value
Person Gray, Mr. Donald R
Role Project Staffing Owner
Start Date Today’s Date
End Date Leave Blank

ƒ (B) Apply
ƒ (H) Return to Project Template Setup
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 131
Define Quick Entry
11. Enter the Quick Entry settings

Order Field Name Specification Prompt Required


10 Project Number Project Number Yes
20 Project Name Project Name Yes
30 Key Member Project Manager Project Manager Yes
40 Classification Industry Sector Industry Sector Yes
50 Classification XX-Media Sector XX-Media Sector No
60 Project Start Date Project Start Date Yes
70 Project Finish Project Finish Yes
Date Date

12. (B) Apply


13. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 132
Practice - Create a Project from a Project Template
Overview
In this practice, you will create a project using the project template you defined in the previous
practice.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a sales proposal project using the T, XX Sales Proposal project template created in the
previous practice. Enter the following project details:

Field Value
Source Template T, XX Sales Proposal (View-Only)
Project Number XX Sales Proposal
Project Name XX Sales Proposal
Project Manager Marlin, Ms. Amy
Industry Sector Telecommunications – Projects
primarily engaged in the
Telecommunications sector
XX-Media Sector Internet - Internet
Project Start Date Today’s Date
Project Finish Date Enter a Date Six Months from Today
From the Project Overview subtab, verify that two team members are listed. Change the Status
of the project to Approved and enter the following information on the Setup page:

Field Value
Description Internet content sales proposal
Priority High
City Coraopolis
State PA
Review the additional information (in the Other Project Setup region) to ensure that both the
workplan and financial structures are enabled and shared.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 133
Solution - Create a Project from a Project Template
Create a Project from a Project Template
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Create Project: Select Source page
ƒ (N) Projects: Project Delivery > Create Project
3. Select the source
− Create Project from Template
− T, XX Sales Proposal

4. (B) Continue
5. Enter the Project Details

Field Value
Source Template T, XX Sales Proposal (View-Only)
Project Number XX Sales Proposal
Project Name XX Sales Proposal
Project Manager Marlin, Ms. Amy
Industry Sector Telecommunications – Projects
primarily engaged in the
Telecommunications sector
XX-Media Sector Internet - Internet
Project Start Date Today’s Date
Project Finish Date Enter a Date Six Months from Today

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 134
6. (B) Finish

Review the Project Information


7. (ST) Overview
You should see two team members listed.

8. (ST) Setup
9. Modify the setup information
ƒ Change Status to Approved
ƒ (B) Change Status
ƒ Select Approved from the To field

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 135
ƒ (B) Apply
ƒ Enter the following information on the Project Setup page:

Field Value
Description Internet content sales proposal
Priority High
City Coraopolis
State PA

10. (B) Save


11. (H) Additional Information in the Other Project Setup section

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 136
12. Review the information on the Additional Information page

13. (B) Cancel


14. (H) Structures in the Other Project Setup region

Field Value
Enable Financial Structure Yes
Enable Workplan Structure Yes
Workplan and Financial Structure Shared Structures
Sharing

15. (B) Apply


16. (B) Save
17. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 137
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 138
Resource Planning and Reporting

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 139
Practice - Create a Planning Resource List
Overview
In this practice, you will define a new resource list for use with construction projects.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a planning resource list with the following information:

Name XXConstruction
Effective From Today's Date
Effective To Leave blank
Description XXConstruction Planning Resource List
Job Group Vision Corporation
Enabled for Workplan Yes
Centrally Controlled Yes
Add a Financial Category planning resource format, with the People resource class. Similarly,
add the Financial Category resource format from the Financial Elements resource class.
Add multiple planning resources:
ƒ Select People from the list in the Resource Class field. Then select Financial
Category in the Resource Format field and add the following financial categories:
− Project Administration
− Project Management
− Staffing
ƒ Select Financial Elements from the list in the Resource Class field. Then select
Financial Category in the Resource Format field and add the following categories:
− Architect Fees
− Building Works
− Electrical Works
− Equipment
− Fees

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 140
Solution - Create a Planning Resource List
Create a Planning Resource List
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Planning Resource Lists page
ƒ (N) Projects: Setup > Planning Resource Lists

3. (B) Create
4. Enter the header information for the new planning resource list

Name XXConstruction
Effective From Today's Date
Effective To Leave blank
Description XXConstruction Planning Resource List
Job Group Vision Corporation
Enabled for Workplan Yes
Centrally Controlled Yes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 141
5. Add planning resource formats:
ƒ (ST) Planning Resource Formats
ƒ (B) Add Resource Formats
ƒ Add the Financial Category resource format from the People resource class:
ƒ Select People from the list in the Resource Class field
ƒ (B) Go
ƒ Select Financial Category
ƒ (I) Move

ƒ (B) Apply and Add More


ƒ Add the Financial Category resource format from the Financial Elements resource class:
ƒ Select Financial Elements from the list in the Resource Class field
ƒ (B) Go
ƒ Select Financial Category
ƒ (I) Move

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 142
ƒ (B) Apply

Note: Oracle Projects automatically includes the following resource formats:


People, Equipment, Material Items, and Financial Elements.
6. Add planning resources
ƒ (ST) Planning Resources
ƒ (B) Add Multiple Planning Resources
ƒ Add financial categories from the People resource class
ƒ Select People from the list in the Resource Class field
ƒ Select Financial Category from the list in the Resource Format field
ƒ Add the following financial categories in the Financial Category column:
− Project Administration
− Project Management
− Staffing

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 143
• (B) Apply and Add More
ƒ Add financial elements from the Financial Category resource class
ƒ Select Financial Elements from the list in the Resource Class field
ƒ Select Financial Category from the list in the Resource Format field
ƒ Add the following financial categories in the Financial Category column:
− Architects Fees
− Building Works
− Electrical Works
− Equipment
− Fees

ƒ (B) Apply
Note: Oracle Projects automatically includes the following planning resources:
People, Equipment, Material Items, and Financial Elements.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 144
7. (B) Apply
8. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 145
Practice - Define a Resource Breakdown Structure
Overview
In this practice, you will define a three level resource breakdown structure for construction
projects..

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a resource breakdown structure with the following information:

Version Name XXConstruction


Description XXConstruction Resource Breakdown
Structure
Effective From Today's Date
Effective To Leave blank
Use for Allocations Yes
Create a version and enter the following version information:

Version Name XXConstruction Version 1


Effective From Today's Date
Description XXConstruction Resource Breakdown
Structure
Job Group Leave Blank
Build the second level of the hierarchy under Outline Number 0 with the following child
elements:

Order Resource Type Resource


1 Expenditure Category Staffing
2 Expenditure Category Fees
3 Expenditure Category Works
4 Expenditure Category Equipment
Build the third level of the hierarchy under Outline Number 1 with the following child elements:

Order Resource Type Resource


1 Expenditure Type Project Administration
2 Expenditure Type Project Management
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 146
Build the third level of the hierarchy under Outline Number 2 with the following child elements:

Order Resource Type Resource


1 Expenditure Type Architects Fees
2 Expenditure Type Solicitors Fees
3 Expenditure Type Surveyors Fees
Build the third level of the hierarchy under Outline Number 3 with the following child elements:

Order Resource Type Resource


1 Expenditure Type Building Works
2 Expenditure Type Electrical Works
3 Expenditure Type Landscaping
4 Expenditure Type Roofing Works
Build the third level of the hierarchy under Outline Number 4 with the following child elements:

Order Resource Type Resource


1 Expenditure Type Heavy Plant
2 Expenditure Type Vehicles
3 Expenditure Type Major Equipment
Review the entire resource breakdown structure and Apply and Freeze it.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 147
Solution - Define a Resource Breakdown Structure
Define a Resource Breakdown Structure
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Resource Breakdown Structures page
ƒ (N) Projects: Setup > Resource Breakdown Structures
3. (B) Add Another Row
4. Enter the header information for the new resource breakdown structure

Version Name XXConstruction


Description XXConstruction Resource Breakdown
Structure
Effective From Today's Date
Effective To Leave blank
Use for Allocations Yes

5. (B) Save
6. (I) Versions for your new resource breakdown structure

7. (I) Update
8. Enter the version information

Version Name XXConstruction Version 1


Effective From Today's Date
Description XXConstruction Resource Breakdown
Structure
Job Group Leave Blank
9. Select Apply and Continue Updating from the list in the Actions field
10. (B) Go

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 148
11. Build the second level of the hierarchy
ƒ Select Outline Number 0
ƒ (B) Update Child Elements

Order Resource Type Resource


1 Expenditure Category Staffing
2 Expenditure Category Fees
3 Expenditure Category Works
4 Expenditure Category Equipment
Note: You must select the resources from the list of values.

ƒ (B) Apply
12. Build the third level of the hierarchy under Outline Number 1
ƒ Select Outline Number 1
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 149
ƒ (B) Update Child Elements

Order Resource Type Resource


1 Expenditure Type Project Administration
2 Expenditure Type Project Management
ƒ (B) Apply

13. Build the third level of the hierarchy under Outline Number 2
ƒ (H) 0
ƒ Select Outline Number 2
ƒ (B) Update Child Elements

Order Resource Type Resource


1 Expenditure Type Architects Fees
2 Expenditure Type Solicitors Fees
3 Expenditure Type Surveyors Fees
ƒ (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 150
14. Build the third level of the hierarchy under Outline Number 3
ƒ (H) 0
ƒ Select Outline Number 3
ƒ (B) Update Child Elements

Order Resource Type Resource


1 Expenditure Type Building Works
2 Expenditure Type Electrical Works
3 Expenditure Type Landscaping
4 Expenditure Type Roofing Works
ƒ (B) Apply

15. Build the third level of the hierarchy under Outline Number 4
ƒ (H) 0
ƒ Select Outline Number 4
ƒ (B) Update Child Elements

Order Resource Type Resource


1 Expenditure Type Heavy Plant
2 Expenditure Type Vehicles
3 Expenditure Type Major Equipment
ƒ (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 151
16. Review the resource breakdown structure
ƒ (H) 0
ƒ (H) Expand All

17. Select Apply and Freeze from the list in the Actions field
ƒ (B) Go

18. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 152
Practice - Associate a Resource Breakdown Structure with a Project
Overview
In this practice, you will associate a resource breakdown structure with a project and review the
resource breakdown structure.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Find the XX Sales Proposal project you created in an earlier practice. Select the Resource
Breakdown Structures hyperlink from the Other Project Setup region. There, select and apply
your XXConstruction resource breakdown structure. Finally review the resource breakdown
structure and all its elements.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 153
Solution - Associate a Resource Breakdown Structure with a Project
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to Search Projects page
ƒ (N) Projects: Delivery > Search Projects
ƒ (B) Advanced Search
3. Find the XX Sales Proposal project you created in an earlier demonstration
ƒ Select Search results where each may contain any value entered
ƒ Enter the search criteria in the Project Name fields
− Project Name = is XX Sales Proposal
ƒ (B) Go

Associate a Resource Breakdown Structure with a Project


4. (H) XX Sales Proposal
5. (T) Project
6. (ST) Setup
• Scroll down to the Other Project Setup region

7. (H) Resource Breakdown Structures


8. Select your XXConstruction resource breakdown structure from the list of values in the
Name field

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 154
9. (B) Apply

Review the Resource Breakdown Structure


10. (H) Resource Breakdown Structures

11. (H) XXConstruction Version 1


12. (H) Expand All

13. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 155
Overview of Project Structures

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 156
Practice - Define a Project with Non-Shared Structure with No
Mapping
Overview
In this practice, you will create a new project and update the structure settings so that the
project has non-shared structures with no mapping.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Create a project from the Service Center Template with the following details:

Field Value
Project Number XXNONSHARED
Project Name XX Non-Shared Structures
Project Manager Marlin, Ms. Amy
Project Start Date Today's Date
Project Finish Date Two Years from Today
Verify the following structure settings:

Field Value
Structures
Financial Structure Yes
Workplan Structure Yes
Deliverables Yes
Workplan and Financial Structure Non-Shared: No Mapping
Sharing
Program Reporting
Setup project as a program Yes
Allow Linked Projects to belong to Yes
Multiple Programs
Navigate to the Workplan tab and review the workplan structure. Your project has no tasks on
the workplan structure at this time.
Similarly review the financial structure. Your project already has a financial structure that you
copied from the template when creating the project.
Select Update Financial Breakdown Structure from the list in the Actions field and review the
list in the Actions field. Note how the option to map Map Workplan to Financial Tasks is not on

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 157
the list. The workplan and financial structures are non-shared and you will not map workplan to
financial tasks.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 158
Solution - Define a Project with Non-Shared Structures with No
Mapping
Create a Project
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Create Project: Select Source page
ƒ (N) Projects: Delivery > Create Project
3. Select the source
ƒ Select the Create Project from Template option button
ƒ Search for and select Cost Plus Template from the list

Oracle Projects copies the structure information from the template to the new project.
ƒ (B) Continue
4. Complete the fields on the Create Project: Details page

Field Value
Project Number XXNONSHARED
Project Name XX Non-Shared Structures
Project Manager Marlin, Ms. Amy
Customer Name Hilman and Associates
Project Start Date Today's Date
Project Finish Date Two Years from Today
Organization Vision Corporation

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 159
5. (B) Finish

Update the Structure Settings


6. Navigate to the Structures page
ƒ (T) Project
ƒ (ST) Setup
ƒ Scroll down to the Other Project Setup region

ƒ (H) Structures
7. Verify the structure settings

Field Value
Structures
Financial Structure Yes
Workplan Structure Yes
Deliverables Yes
Workplan and Financial Structure Non-Shared: No Mapping
Sharing
Program Reporting
Setup project as a program Yes
Allow Linked Projects to belong to Yes
Multiple Programs

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 160
8. (B) Apply
9. (B) Yes in the Warning message

Review the Workplan Structure


Your project has no tasks on the workplan structure at this time.
10. (T) Workplan
11. Review the workplan

Review the Financial Structure


Your project already has a financial structure that you copied from the template when creating
the project.
12. (T) Financial
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 161
13. (ST) Tasks
14. (H) Expand All

Note how the tasks in the financial structure are not the same as the tasks in the workplan
structure.
15. Select Update Financial Breakdown Structure from the list in the Actions field
16. (B) Go
17. Review the list in the Actions field

Note how the option to map Map Workplan to Financial Tasks is not on the list. The
workplan and financial structures are non-shared and you will not map workplan to financial
tasks.
18. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 162
Financial Structures

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 163
Practice - Update a Financial Breakdown Structure
Overview
In this practice, you will add tasks to a financial structure for a project you created in a previous
exercise. You will also update task details and copy tasks to create new tasks.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Find the XX Non-Shared Structures project and open it. Update the Financial Breakdown
Structure for this project. Create a new set of tasks:

Outline Task Task Name Transaction Transaction Task


Level Number Start Finish Manager
0 4.0 Printer Today's Leave Blank Lasher, Ms.
Support Date Tina Louise
1 4.1 Maintenance Today's Leave Blank Lasher, Ms.
Date Tina Louise
2 4.1.1 Parts Today's Leave Blank Lasher, Ms.
Replacement Date Tina Louise
Review the updated financial breakdown structure. Update details for Task 1.0 with the following
information:

Task Number 4.0


Task Name Laptop Support
Organization Services East
Task Manager Lasher, Ms. Tina Louise
Description Maintain and repair laptop computers for
the organization
Update the setup information as follows:

Transaction Start Date Today's Date


Transaction Finish Two Years from Today
Work Type Internal-Overhead
Service Type Support
Customer Work Site Leave Blank
ETC Source Average of Actuals
Billable No

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 164
Receive Inter-Project No
Invoices
Copy task 4.0 and its subtasks to create a new set of tasks for server support. Define the
following copy information:

Copy Selected Task and all Subtasks


Paste Selection As a Peer Task
Prefix 5.0
Review the new tasks. Again update the task numbers and task names for the new tasks:

Outline Task Task Name


Level Number
0 3.0 Server Support
1 3.1 Maintenance
2 3.1.1 Upgrades
Apply and Update Financial Breakdown Structure and review the results of the update.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 165
Solution - Update a Financial Breakdown Structure
Find Your Project
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to Search Projects page
ƒ (N) Projects: Delivery > Search Projects
ƒ (B) Advanced Search
3. Find the XX Non-Shared Structures project you created in an earlier demonstration
ƒ Select Search results where each may contain any value entered
ƒ Enter the search criteria in the project name fields
− Project Name = is XX Non-Shared Structures
ƒ (B) Go
4. (H) XX Non-Shared Structures

Update the Financial Breakdown Structure


5. (T) Financial
6. (ST) Tasks
7. Select Update Financial Breakdown Structure from the list in the Actions field
8. (B) Go
9. (H) Expand All

10. Create a new set of tasks


ƒ Select Task 3
ƒ (B) Create Tasks
ƒ Enter the task information

Outline Task Task Name Transaction Transaction Task


Level Number Start Finish Manager
0 4.0 Equipment Today's Leave Blank Lasher, Ms.
Support Date Tina Louise
1 4.1 Maintenance Today's Leave Blank Lasher, Ms.
Date Tina Louise
2 4.1.1 Parts Today's Leave Blank Lasher, Ms.
Replacement Date Tina Louise

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 166
ƒ (B) Apply
ƒ (I) Expand All
ƒ Review the updated financial breakdown structure

Update Task Details


11. (I) Update for Task 4.0
12. Select the General tab on the Task Details page
13. Update the general information as needed

Task Number 4.0


Task Name Equipment Support
Organization Services-East
Task Manager Lasher, Ms. Tina Louise

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 167
Description Maintain and repair laptop computers for
the organization

14. Select the Setup tab on the Task Details page


15. Update the setup information as needed

Transaction Start Date Today's Date


Transaction Finish Two Years from Today
Work Type Internal-Overhead
Service Type Support
Customer Work Site Leave Blank
ETC Source Average of Actuals
Billable No
Receive Inter-Project No
Invoices

16. (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 168
Copy Tasks
Copy task 4.0 and its subtasks to create a new set of tasks for server support. Note: You may
need to expand all the tasks if they have been collapsed.
17. Select Task 4.0
18. (B) Copy
19. Define the copy information

Copy Selected Task and all Subtasks


Paste Selection As a Peer Task
Prefix 5.0
ƒ (H) Expand All
ƒ Select Task 2.0 in the Placement region

ƒ (B) Apply
20. (H) Expand All
21. Review the new tasks
22. Select Update Tasks from the list in the Actions field
23. (B) Go
24. Update the task numbers and task names for the new tasks

Outline Task Task Name


Level Number
3 3.0 Server Support
3.1 3.1 Maintenance
3.1.1 3.1.1 Upgrades
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 169
25. Select Apply and Update Financial Breakdown Structure from the list in the Actions field
26. (B) Go
27. Review the results of the update
• (H) Expand All

28. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 170
Practice - View Financial Tasks
Overview
In this practice, you will create create a personalized view for financial tasks.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Search for the XX Non-Shared Structures project that you created in a previous practice. View
the financial tasks on this project – in the Hierarchy display as well as in the List display.
Personalize and create a view with the following information:

View Name XX Task View


Number of Rows Displayed 10 Rows
Set as Default No
Description XX Personalized Task View
Select the following columns and arrange them in the order listed:
− Task Number
− Task Name
− Task Manager
− Task Status
− Work Type
− Chargeable
− Billable

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 171
Solution - View Financial Tasks
Find Your Project
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to Search Projects page
ƒ (N) Projects: Delivery > Search Projects
ƒ (B) Advanced Search
3. Find the XX Non-Shared Structures project you created in an earlier demonstration
ƒ Select ‘Show table data when all conditions are met’ option
ƒ Enter the search criteria in the project name fields
− Project Name = is XX Non-Shared Structures
ƒ (B) Go
4. (H) XX Non-Shared Structures

View the Financial Tasks


5. (T) Financial
6. (ST) Tasks

• Note that this is a display of tasks in hierarchy format


7. Use the List view
ƒ For Display, select the List option button
ƒ (B) Go
ƒ Review the tasks in list format

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 172
Personalize a View
8. (B) Personalize
9. (B) Create View
10. Enter the view information

View Name XX Task View


Number of Rows Displayed 10 Rows
Set as Default No
Description XX Personalized Task View

11. (H) Remove All in the Columns Shown and Column Order region
12. Select the following columns and arrange them in the order listed:
− Task Number
− Task Name
− Task Manager
− Task Status
− Work Type
− Chargeable
− Billable

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 173
13. (B) Apply and View Results
14. Review the results

15. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 174
Organization Forecasting

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 175
Utilization

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 176
Appendix A: Integration with Oracle Sales

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 177
Appendix B: Integration with Oracle Product Lifecycle Management

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 178
Appendix C: Integration with Oracle Internal Controls Manager

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 179
Appendix D: User-Defined Attributes

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 180
Practice - Define a Value Set
Overview
In this practice, you will define a new value set to provide values to track the status of building
permits.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define an Attribute Value Set with the following details:

Field Value
Value Set Name Permit_XX
Description XX Permit Status Value Set
Data Type Char
Maximum Size 15
Validation Type Independent
Display Type Poplist
Enter two values in the value set:

Value Description Enabled Sequence


Not_Req Not Required Yes 10
In_Process In Process Yes 20

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 181
Solution - Define a Value Set
Define a Value Set
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Maintain Value Sets page
ƒ (N) Projects: Setup > Attribute Value Sets
3. (B) Create
4. Enter the value set information

Field Value
Value Set Name Permit_XX
Description XX Permit Status Value Set
Data Type Char
Maximum Size 15
Validation Type Independent
Display Type Poplist

5. (B) Apply and Continue


6. Enter the first value

Field Value
Value Not_Req
Description Not Required
Enabled Yes
Sequence 10
Start Date Leave Blank
End Date Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 182
7. (B) Add Another
8. Enter the second value

Field Value
Value In_Process
Description In Process
Enabled Yes
Sequence 20
Start Date Leave Blank
End Date Leave Blank

9. (B) Apply

10. (H) Home


Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 183
Practice - Define Attribute Groups
Overview
In this practice, you will define an attribute group with two attributes.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Define a single row attribute group with the following information:

Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Description XX Building Permit Status
Behavior Single-Row
Add an attribute with the following details:

Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Sequence 10
Tip Select the Building Permit Status
Data Type Char
Column C_EXT_ATTR1
Enabled Yes
Required No
Display As Text Field
Indexed No
Value Set Name Permit_XX
Default Value In_Process

Add another attribute with the following details:

Field Value
Internal Name FileXX

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 184
Display Name Permit Archived
Sequence 20
Tip Enable check box once building permit
is archived
Data Type Char
Column C_EXT_ATTR2
Enabled Yes
Required No
Display As Checkbox
Indexed No
Default Value Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 185
Solution - Define Attribute Groups
Define a Single Row Attribute Group
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Search: Attribute Groups page
ƒ (N) Projects: Setup > Attribute Groups
3. (B) Create
4. Enter the attribute group information

Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Description XX Building Permit Status
Behavior Single-Row
Number of columns in the page Accept the default value
layout
If you select Multi-Row behavior, the system will display the attributes in the group as
column headers in a row. If you do not enable Multi-Row, the attributes will appear as
separate fields.
5. (B) Apply and Add Attributes

Field Value
Internal Name PermitXX
Display Name XX Building Permit Status
Sequence 10
Tip Select the Building Permit Status
Data Type Char
Column C_EXT_ATTR1
Enabled Yes
Required No
Display As Text Field
Indexed No
Value Set Name Permit_XX
Default Value In_Process
If you enter information in the Tip field, it will show in blue on the page as a description or a
suggestion.
Indexed, if enabled, will show all data entered and in the order entered. Enabling the
Indexed check box will also enable you to do searches on the values in the indexed

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 186
attributes using the Alternate Project Search page. You must have Multi-Row Enabled to
use this function.

6. (B) Apply and Add Another

Field Value
Internal Name FileXX
Display Name Permit Archived
Sequence 20
Tip Enable check box once building permit
is archived
Data Type Char
Column C_EXT_ATTR2
Enabled Yes
Required No
Display As Checkbox
Indexed No
Default Value Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 187
7. (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 188
8. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 189
Practice - Define Attribute Context
Overview
In this practice, you will associate the attribute group you defined in the previous practice with
the Construction project type. You will also add a page region to the attribute context for the
Construction project type.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Add an attribute context that has the following details:

Field Value
Context Type Project Type
Value Construction
Then, with the Construction project type attribute group selected, add the following attribute
group:
− XX Building Permit Status
ƒ Select Project as the data level
Add an action to the XX Building Permit Status attribute group

Field Value
Object Name PROJECTS
Classification Construction
Attribute Group XX Building Permit Status
Sequence 10
Action Name XX Building Permit Information
Description XX Building Permit Information
Function Generate Item Description
Security Privilege Leave Blank
Execution Method User Action
Display Style Link
Prompt Application Projects
Prompt Message Name Building Permit Information
Visible Yes
Dynamic Prompt Function Leave Blank

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 190
Dynamic Visibility Function Leave Blank
To create a page region, query the context

Field Value
Context Type Project Type
Value Construction
Select the Page Regions icon for the Construction project type and define the following
information:

Field Value
Display Name XX Building Information
Description XX Building Information
Data Level Project
Internal Name XXBuilding_Info
Sequence Enter your XX number -- only use
numbers (e.g. use 77)

Sequence Display Name


10 XX Building Permit Status

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 191
Solution - Define Attribute Context
Define Attribute Context
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Search: Attribute Contexts page
ƒ (N) Projects: Setup > Attribute Contexts
3. (B) Add Context

4. Enter the context information

Field Value
Context Type Project Type
Name Construction
Note: If you have previously associated attributes with this project type, it will not appear on
the list of values on the Add Attribute Context page. Instead, return to the Attribute Contexts
page, select Project Type from the list in the Context Type Field, enter Construction in the
empty field, and select the Go button. You then select the Attribute Groups icon to add
additional attribute groups. Proceed to step 5.

5. (B) Continue
6. Search for your attribute group that has a display name of XX Building Permit Status.
7. (B) Go

7. Select the check box against your attribute group of XX Building Permit Status.
ƒ (B) Apply

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 192
8. Search for the construction context of type Project Type that you just added to your attribute
group.

9. Click on the Details Icon for Attribute Groups.

10. Add an action to the XX Building Permit Status attribute group


ƒ Select the Update Actions icon for your XX Building Permit Status attribute group

ƒ (B) Create Action

Field Value
Object Name PROJECTS (view only)
Classification Construction (view only)
Attribute Group XX Building Permit Status (view only)
Sequence 10
Action Name XX Building Permit Information
Description XX Building Permit Information
Function Generate Item Description
Security Privilege Leave Blank
Execution Method User Action

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 193
Display Style Link
Prompt Application Projects
Prompt Message Name XX Building Permit Information
Visible Yes
Dynamic Prompt Function Leave Blank
Dynamic Visibility Function Leave Blank

ƒ (B) Apply
ƒ (H) Attribute Contexts

Create a Page Region


7. Query the context

Field Value
Context Type Project Type
Value Construction
ƒ (B) Go
8. Select the Page Regions icon for the Construction project type

9. (B) Create Page

Field Value

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 194
Display Name XX Building Information
Internal Name XXBuilding_Info
Description XX Building Information
Business Entity Project
Sequence Enter your XX number (77)

10. (B) Apply


11. (H) XX Building Information
12. (B) Add Another Row

Sequence Display Name


10 XX Building Permit Status

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 195
13. (B) Apply
14. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 196
Practice - Enter Data for User-Defined Attributes
Overview
In this practice, you enter values on the Software Systems project for the attribute group that
you defined in the previous practices.

Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training
or test instance at your site on which to complete this practice.

Tasks
Query for and open the Software Systems project. Open the XX Building Information page
from the Other Project Setup region.
Select a status of Not_Req for the XX Building Permit Status field and enable the Permit
Archived check box

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 197
Solution - Enter Data for User-Defined Attributes
Enter Data for User-Defined Attributes
1. Responsibility = Projects SU, Vision Services (USA)
2. Navigate to the Search Projects page
ƒ (N) Projects: Delivery > Search Projects
ƒ (B) Advanced Search
3. Query the Software Systems project
• Select the Show table data when all conditions are met

Field Value
Project Name is Software Systems
ƒ (B) Go

ƒ (H) Software Systems


4. (T) Project
5. (ST) Setup

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 198
6. (H) XX Building Information (in the Other Project Setup region)
7. Select a status of Not_Req for the XX Building Permit Status field.

Note that the default status is In_Process. You set this as the default status when you
defined the attribute group.
8. Enable the Permit Archived check box

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 199
9. (B) Apply
10. (H) Home

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 200
Summary of R12.x Project Foundation Fundamentals

This lesson does not have any practices.

Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 201
Copyright © 2012, Oracle and/or its affiliates. All rights reserved.

R12.x Oracle Project Foundation Fundamentals Supplemental Student Practices


Chapter 1 - Page 202

You might also like