SAP Multi resource Scheduling helps you to find suitable resources and assign
them to demands. Demands are units of work from various areas, such as the
following: Service orders from SAP CRM. Service orders and notifications from
Plant Maintenance (PM) and Customer Service (CS)
2.Planned orders are results of running MRP. Shortages of materials that are set to
internal procurement will create planned orders, which can be converted into
production orders. Production orders are “hard copies”; they cannot be adjusted
by an MRP run anymore.
3.Planned Costs also gets updated in the production order via component price
and routing activity price.
4.You can run an availability check on production orders which determines any
missing components in the order so that you can bring that missing component
for the order execution at shop floor.
5.You can print the production order for shop floor which indicates the list of
components to be consumed and what kind of operations to be performed in
sequence at the work center.
6.After you have physically produced the material, you can declare the production
through order confirmation which updates the activities cost such as machine
running price, labor price on the order.
8.You can also post goods receipt of the material automatically during order
confirmation. Goods receipt would increase the inventory of the material, and it
is carried out with movement type 101 in SAP.
9.After Order Confirmation, all the cost such as the cost of components and
activity cost will be debited on the order, and once you post goods receipt, costs
will be credited on the order.
Production Order creation is required to produce the material and consume the
components which are used
The release of order signifies that the order is ready to be executed at the shop
floor. You can do an automatic release of order also during creation mode by
using relevant production scheduling profile in the material master with auto
release indicator set.
Enter the material code for which production order needs to be created.
Click to release the order. The following message will appear in the bottom
left corner: .
Click to check material availability. The system will show the message
regarding the availability of components.
Note: You can also decide not to release the order if there are missing parts found
in availability checks.Click button to save, the following message will show in
the bottom left corner: .
Question no 1:- create a order production for the FG material power cushion part
no 40004490 LH AND (RH)40004491 and do posting after close the DPR.
2. click create production coo1 and enter the material part no on next screen put
the required quantity we want after click on material availability if system shows
materials are available click on green flag and release the order if material part
missing showing first check the shortage material and see in stock overview if sfg
material is missing rise the SFG material first after
3.take down SAP order number and enter in reservation list order no
and take down the sheet by print and submit to store for posting