Professional Documents
Culture Documents
Manufacturing Facilities
June 2023
Brief on Gainwell
Brief on Mechanized UG Mining in India
Make in India – Gainwell Engineering
Our journey is dedicated to build a new India
Resourcing India’s For the last 78 years, Gainwell Group have been committed to the
development of India and neighboring countries along with the growth of
Rise Responsibly our Customers, as the authorized distributor of Caterpillar Equipment
since and Solutions
Since its inception, has helped customers build a better India, operating
1944
in sectors intrinsic to India’s socioeconomic transformation. With values
in action and excellence in execution for over seven decades, we have
built a strong foundation for future growth by evolving ahead of the curve
— turning dreams into reality at breakneck speed. In the process, we are
witnessing a paradigm shift — from an organisation engaged in linear
thinking to an institution that thrives on collective thinking and a shared
purpose of existence
Gainwell group history
1944 1955 1974-78 2003 2013
Tractors India incorporated. Tractors India Limited Distributorship for Initiates first Maintenance Acquisition of Bucyrus
Representative for goes public Caterpillar extends to and Repair Contract (MARC) business from Caterpillar
Caterpillar, USA in Northern Nepal, Sikkim, Bhutan and in India with Tata Steel (South
and Eastern India Myanmar Eastern Block)
Live SAFETY
Vision
Globally recognized, technology driven
manufacturing leader
Deliver superior QUALITY
Coal India has planned to ramp up its underground coal production by four-fold to 100 MT by 2030 from the
current 25.5 MT. Around 70% of the country’s coal reserves are conducive for underground mining
The plan is to introduce 50 sets of Continuous Miner by 2025 with peak production potential of 25 MTPA
The aim is to make underground production sizably supplement the open cast output. At current rate, mineable
coal reserves at existing open cast will slowly start lowering
Coal India is also planning to introduce 10 units of Highwall Miner with a projected production potential of 5
MTPA
One of the major reasons why coal production from underground mines in India has not grown at the expected
pace due to over dependency on imported equipment and lack of indigenous manufacturing
Gainwell can actually bridge the gap between demand and supply of indigenous underground mining equipment
by investing in India and make these machines to support the requirement of India and also for global market
Brief on Gainwell
Brief on Mechanized UG Mining in India
Make in India – Gainwell Engineering
Rich legacy of underground mechanized equipment
DBT was established in Lunen, Germany in 1880 during the start of coal
mining expansion in Germany. One of the respected names in
underground coal mining industry, DBT was present at all coal mining
market globally
During 2006, major American manufacturer for Surface Mining
Equipment, Bucyrus acquired DBT to expand into underground mining
market. The UG product line included Longwall and Room & Pillar
Products
In 2011, Caterpillar acquired Bucyrus to expand their product offering in
Resource Industries. This was the biggest acquisition in the history of
Caterpillar at US$ 8.8 Billion
In 2016, Caterpillar decided to close down the Room & Pillar business
due to contraction of coal mining in developed economies
Gainwell Engineering inheriting this rich legacy
Gainwell has seen indigenization opportunity of mechanized UG mining equipment, will be the key
enabler to enhance UG coal production supporting sustainability goal of the nation
Gainwell signed IP License with Caterpillar in September 2017 for manufacturing of Highwall Miner as
a pilot project to kick start the manufacturing UG mining equipment. Till now we have rolled out four
units of Made in India Highwall Miner
With the encouraging success, we signed the IP License with Caterpillar to manufacture full range of
UG Room & Pillar Equipment including Longwall Support Equipment in December 2021
As a part of this arrangement, Gainwell has exclusive license to manufacture the products and supply
to global markets and render product support services to both new and existing active population of
Caterpillar Machines. All the existing Caterpillar Patents and IPs are assigned to Gainwell Group
We are aligned with government’s vision : “Make in India”
Gainwell to end India’s dependence on imported equipment for underground mining
Government emphasised to decrease its reliance on imported heavy equipment to boost domestic production and reduce
down time due to non-availability of spares
Planned to phase out import over the period of next 5 to 6 years by encouraging and developing domestic equipment
manufacturers
Gainwell at the forefront of the evolution of the mining sector by bringing in comprehensive and technologically advanced
product line for domestic and global market
We got 35 acres of land at Panagarh, West Bengal, investing INR 5 billion, state-of-the-art facility to manufacture UG mining
equipment, first phase operational by April 2023
Indigenous Ecosystem : We are committed to scale up indigenization to 80% and above in next 3 years
Committed to Atmanirbharta vision in coal sector and contribute to the growth of country’s economy
Product Range