Use the tender number and description as the subjecton the email.
Quotations are hereby invited for the installation of Television White Space (TVWS) base stations and
accruing upgrade, and maintenance services to same.
1. QUOTATION REQUIREMENTS
i. XY Nos x Surveys
ii. XY Nos x Installation of TVWS base stations, Wi-Fi Networks & associated passive equipment.
The required goods must meet the specifications provided in Annexures A and B.
All quotations must be accompanied by detailed specifications of the product offered.
3 Submission:
The bids must be submitted on your singed company’s letterhead and cover thefollowing:
The Bidding entity
Company Corporate Registration Certificate
Tender/Bid Number,
Proof of Bid Fee Payment
Closing date,
TIN Reference and Tax Clearance Certificate
Customers References and Proof of Experience (at least three-3 verifiable references)
Supporting letters from above stated references
4. EVALUATION CRITERIA
4.1 Selection of suppliers will be based on the 80/20 preference point system.
4.2 Indicate relevant professional qualifications with verifiable and applicable certificates.
4.3 No order will be issued, or no contract will be signed without a valid Nigerian Communications Commission
Registration Certificate.
4.4 No deviation from the above specification is permitted.
3 ELIMINATION CRITERIA
Proposals will be eliminated under the following conditions:
Submission after the deadline.
Proposals submitted at incorrect location or email address (Bids must besubmitted electronically
at tenders@airband.ng).
Failure to submit at least three (3) reference letters with contact details for projectsof a similar
nature not older than five (5) years.
If bidder did not complete “Compliance Checklists” in Annexure A and B.
If the bidder fails to provide proof of compliance with relevant sections in 2.6 and 2.7 above
4 PRICING QUOTATION
4.1 Price needs to be provided in Naira (excl. VAT), with details on priceelements that are subject to
escalation and exchange rate fluctuations clearly indicated.
4.2 Price should include additional cost elements such as freight, insurance untilacceptance, duty where
applicable, etc.
4.3 Payment will be according to the Airband Payment Terms and Conditions
5. OTHER TERMS AND CONDITIONS
5.1 The supplier shall under no circumstances offer, promise, or make any gift, payment, loan, reward,
inducement, benefit or other advantage, which may be construed as beingmade to solicit any favour,
to any Airband employee or its representatives. Such an act shall constitute a material breach of the
Agreement and the Airband shall be entitled to terminate the Agreement forthwith, without prejudice
to any of its rights.
5.2 A validity period of 90 days will apply to all quotations except where indicated differentlyonthe quote.
5.3 No goods and/or services should be delivered to the Airband without an official Airband Purchase order.
Airband purchase order number must be quoted on the invoice. Invoices without Airband purchase
order numbers and duly approved and signed off Job Completion Certificates will be returned to
supplier.
5.4 Prospective suppliers must provide at least three (3) reference letters with contact details for projects
of a similar nature not older than five (5) years in addition to a reference letter from the prospective
supplier’s bankers.
5.5 In an attempt to reduce administration, while ensuring that the Airband mitigates against any
construction risk, ten (10%) percent retention will be deducted on all invoices for work completed and
approved for payment. When all outstanding defects have been fixed and or resolved. The retention
monies will be released three (3) months, after final project completion subject to no further defects
being identified.
SCOPE OF SERVICES
1. Site Survey
Purpose: Identify all potential issues and ensure that the installation is done correctly. A thorough site survey will ensure
optimal performance and prevent any potential issues that could arise during the installation and operation of the TVWS
base station.
It is important to note that the scope of work may vary depending on the specific requirements of the project and the
regulatory environment in which the base station is being installed. All client’s requirements and objectives for the
TVWS base station are to be captured to determine the entirety of the scope of the deployment.
C. RF Analysis:
RF analysis to determine the available spectrum and optimal frequencies and channels in the location for use for
the base station considering A and B above.
D. Site Planning:
Preparing a detailed site plan including the proposed location of all equipment on the site such as antennas, cables,
power supplies with all existing assets on the site captured. This also includes taking measurements, creating the
drawings, and selecting appropriate installation remedies and recommendations.
F. Documentation:
Provide a comprehensive report that include:
i. Site plan drawings,
ii. Equipment list, placements, and dimensions on site,
iii. RF Analysis Results,
iv. Safety, health, and environmental assessments.
4. Documentation
A. The installation team should prepare comprehensive documentation of the installation including diagrams and test
results the as-built document which should either be in conformity with the approved site survey plan or with
minimal adjustments not exceeding five (5%) percent of which these must have been previously approved as
variations by requisite approving parties. The documentation should be submitted as part of the site completion
report to the Operations and Maintenance (Support) team for site acceptance process to be done.
5. Maintenance & Support
The installation team may be responsible for on-going maintenance and support of the base station including routine
maintenance, outage rectifications, equipment upgrades and troubleshooting of any issues that may arise in the site of
the deployed systems end to end.
7. Project Management
Managing and co-ordination of the site-specific projects from start to finish including co-ordination with externa
stakeholders, scheduling, and reporting progress to the Airband team.
ANNEXURE A
Compliance Checklist – XYNos x TVWS and Wi-Fi Networks Installation
Failure to complete, sign and submit this Compliance Checklist along with your quotation, will result in your
quotation being excluded from the evaluation process.Please mark Comply or Do Not Comply with a clear “X”.
3 x Abuja
1 x Jos
1 x Lokoja
1 x Makurdi
1 x Lafia
1 x Okene
29 x square brackets
wall-mount (550 mm).
600 m x Outdoor UV
Shieled CAT 6 Ethernet
Cable
Signature (for
Compliance
Checklist)
Print Name
Date
Company Name
Failure to complete, sign and submit this Compliance Checklist along with yourquotation, will result in
your quotation being excluded from the evaluation process. Please mark Comply or Do Not Comply
with a clear “X”.
5 Treated Method