INPUT DATA:
PIPELINE 14-in Operation 14-in Hydrotest 14-in Installation
PIPE DATA : CONTENT PL PL PL
Pipeline Outside Diameter (mm) 355.6 355.6 355.6
Pipeline Wall Thickness (mm) 11.30 14.30 14.30
Product Specific Gravity ( - ) 1.030 1.030 0.000
Thickness (mm) 0.0 0.0 0.0
Internal Corrosion Coating
Density (kg/m 3 ) 0.0 0.0 0.0
Thickness (mm) 4.75 4.75 4.75
External Corrosion Coating
Density (kg/m 3 ) 1400.0 1400.0 1400.0
Thickness (mm) 30.0 30.0 30.0
Concrete Coating
Density (kg/m 3 ) 3165.0 3165.0 3165.0
Corrosion (mm) 275.0 275.0 275.0
Coating Cutback
Concrete (mm) 350.0 350.0 350.0
Field Joint Material Density (kg/m 3 ) 1925.0 1925.0 1925.0
Pipe external surface type: Concrete=1, Steel=2 1 1 1
SOIL DATA:
Undrained Distributed Soil Shear Strength of Clay C (N/m 2 ) 0 0 0
(1)
Sand Internal Friction Parameter Degree 26.7 26.7 26.7
Compactness of Sand: Loose Sand =1, Dense Sand =2 1 1 1
3
Submerged Density Of Soil from Terzaghi's Tables Gamma (N/m ) 8622.99 8622.99 8622.99
Nc 23.419 23.419 23.419
Nq 13 13 13
Ng 14 14 14
Lateral Soil Friction Factor 0.7 0.7 0.7
Assumed Lateral Soil Displacement 25 25 25
Assumed Longitudinal Soil Displacement 25 25 25
OUTPUT RESULTS:
Total Pipe Outside Diameter (mm) 425.10 425.10 425.10
Pipeline Submerged (N/m) 1598.91 1806.93 958.61
Pipeline Specific Gravity ( - ) 2.12 2.27 1.67
Bearing Width b (mm) 151.26 160.07 119.06
Alfa 1 1 1
Longitudinal Friction Factor 0.5 0.5 0.5