You are on page 1of 14

SPECIFICATION FOR PIPING THERMAL

INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 1 of 7

CLIENT : PT. BUKIT MAKMUR RESOURCES


CONSULTANT : PT. SIKO TECHNO
PROJECT NAME : DED EXPANSION NICKEL HEAP LEACH 5,000 T/Y
LOCATION : KABAENA ISLAND, SOUTH- EAST SULAWESI, INDONESIA
CONTRACT NO. : BMR/PRC/2022/VI/048/SKLR

A 24/08/2022 IFA AG VAN YYT


PREPARED BY CHECKED BY REVIEWED BY APPROVED BY

PT. BUKIT MAKMUR


Rev DATE DESCRIPTION PT. SIKO TECHNO RESOURCES
SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 2 of 7

REVISION SHEET

REV DATE DESCRIPTION


SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 3 of 7

TABLE OF CONTENT

SCOPE .......................................................................................................................................................... 4
REFERENCE ................................................................................................................................................ 4
2.1 Codes ...................................................................................................................................................... 4
2.2 Standard and Specification ...................................................................................................................... 4
2.3 General .................................................................................................................................................... 4
2.4 Line Numbering ....................................................................................................................................... 5
GENERAL REQUIREMENT.......................................................................................................................... 5
MATERIAL .................................................................................................................................................... 5
4.1 General .................................................................................................................................................... 5
4.2 Handling and Storage of Material ............................................................................................................ 5
4.3 Manufacture Handling Data ..................................................................................................................... 5
4.4 General Material Insulation ...................................................................................................................... 5
4.5 Fastening Material ................................................................................................................................... 5
APLICATION REQUIREMENTS ................................................................................................................... 6
5.1 General .................................................................................................................................................... 6
5.2 Insulation Thickness ................................................................................................................................ 6
5.3 Installation in Straight Pipe ...................................................................................................................... 6
5.4 Installation in Elbow ................................................................................................................................. 6
5.5 Installation Adjacent to Flange ................................................................................................................ 6
5.6 Installation of Monitoring Windows .......................................................................................................... 7
FIGURE RECOMMENDATION ..................................................................................................................... 7
SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 4 of 7

SCOPE

The purpose of this specification is for providing guidelines during field application works of
insulation to be executed for project DED EXPANSION NICKEL HEAP LEACH 5.000 T/Y.
The CONTRACTOR shall ensure that all equipment and services supplied meet the requirements
of this specification, and the codes, standards and specifications nominated herein, and shall be
applies to the following project :

Client : PT. Bukit Makmur Resources


Consultant : PT. Siko Techno
Project Name : DED Expansion Nickel Heap Leach 5,000 T/Y
Location : Kabaena Island, South East Sulawesi, Indonesia
Contract No : BMR/PRC/2022/VI/048/SKLR

REFERENCE

The latest edition of following publications shall be considered as an integral part of this
specification. If there are any conflicts between these codes and other related documents,
the more stringent requirement shall govern.

2.1 Codes

Applicable code for this project accordance with ASME B31.3 Process Piping.

2.2 Standard and Specification

ASME American Society of Mechanical Engineer


JIS Japanese Industrial Standard
ASTM American Society for Testing and Materials
NFPA National Fire Protection Association
ISO International Organization for Standardization
BS British Standard

2.3 General

a. Process & Instrument Diagram (P&ID)


The Piping shall be design as per P&ID and PFD
b. Piping Design
The metric system for dimensioning shall be adopted throughout this project. Pipe sizes
shall however be expressed in inches. And all design requirements must comply with this
document.
SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 5 of 7

2.4 Line Numbering

The pipe line numbering system shall be formatted as per stated on P&ID.

GENERAL REQUIREMENT

Piping shall be insulated for the purposes of conserving heat, maintenance of process temperature,
condensate prevention and personnel protection.
Contractor has to provide shop drawings detailing all typical and specialized methods for fabricating
and installing all insulation, jackets and weatherproofing for all items requiring insulation.

MATERIAL

4.1 General

All materials are to be new.


Alternative materials and application methods may be used only with prior written approval
of the BMR.

4.2 Handling and Storage of Material

The handling of all material shall be undertaken safely and in such a manner as to ensure that
no damage is incurred.

4.3 Manufacture Handling Data

Contractor shall be keep all completeness document of manufacturer, and all materials must
be protected from damage that could occur.

4.4 Material Insulation

The material used for thermal insulation is generally such lose mineral wool, calcium silicate,
perlite, etc. Calcium Silicate is preferred for easily during installation. However, other material
application may be used corresponding approval by BMR.

4.5 Fastening Material

a. Wire
Fastening insulation wire shall be 16 gauge, 1.6mm diameter galvanized steel for fastening
insulation.
b. Band
The banding material shall be stainless steel or galvanized steel. Where size of the two
material type is 12 mm wide, 0.5 mm thick.
c. Cladding
Cladding shall be stainless steel without corrugation, with the minimum thickness 0.4 mm.
SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 6 of 7

d. Sealing compound
A high temperature sealant shall be used for sealing joint.
e. Pop Rivets and Screw
If used, pop rivets shall be aluminium or galvanized steel with both shaft and rivet heads
made of same material. Minimum size is 4 mm diameter by 8 mm long. Screws shall be
stainless steel pan head or hex head slotted self-tapping sheet meta screws not less than
10 gauge by 19 mm.

APLICATION REQUIREMENTS

5.1 General

Any piping which is normally cold shall be painted accordance with Doc No. BMR-QAC-PRC-
ST-0002 Painting Procedures.
The insulating materials shall be protected against rain and water, during and after application.
All surfaces to be insulated shall be cleaned of all dirt, oil, grease and other foreign matters.

5.2 Insulation Thickness

Insulation shall be applied with thickness 50mm on each along of pipe.

5.3 Installation in Straight Pipe

Insulation shall be applied to clean, dry, bare or painted.


For multiple layers installation, inner insulation shall be secured with wire. Following for
provision :
 Pipe size up to 12” : Wire
 Pipe size 12” over : Band

5.4 Installation in Elbow

Insulation shall be installed to fit the curvature of elbow/ bends.


Following shall be applied :
a. For the pipe size up to 2”, insulation shall be cut with 45° angles and installed so call “Right
angle installation”.
b. For the pipe size over 2”, insulation shall be multiple mitered cut and secured with wire.

5.5 Installation Adjacent to Flange

Insulation adjacent to flanges shall be installed in a manner to permit removal of flange bolting
without damage to the insulation. The insulation shall be stopped short of the flanges by a
distance equal to the stud or bolt length plus 25mm on each side of the flange.
SPECIFICATION FOR PIPING THERMAL
INSULATION

Document No. Rev. : A


DED EXPANSION NICKEL HEAP
Page:
BMR-PIP-SPE-ST-0003 LEACH 5,000 T/Y
Page 7 of 7

Valves and special fittings insulation, shall be corresponding with approval written by BMR.
Whether need or not for installation

5.6 Installation of Monitoring Windows

Where wall thickness measurement points are located under insulation cladding, a 50 mm dia.
hole with a 100 mm dia. screwed on aluminium cover shall be made in the insulation. The ID
number shall be marked next to the cover.
Monitoring window shall be in four point on pipe circle at every 6 meters.
Note : Provision of monitoring window corresponding with approval written by BMR. Whether
need or not for installation.

FIGURE RECOMMENDATION

Following, figure recommendation may be used for thermal insulation work.


FIGURE-5
FIGURE-6
FIGURE-7