- Engine temperature > 80 °C for Turbo boost calibration
- Gearbox temperature between 50 °C and 60 °C for gearbox calibration (select all the solenoid valves to ensure they are at correct temperature) - Tractor must be placed on a flat area without obstacle - Put the handbrake on - Put the two shift levers in neutral position - Stop all the lights - Stop the engine 14. Press slowly the clutch pedal, wait the complete illumination of the DCC. Start the engine and before 20 seconds 15. Press and hold 4 5 for 5 seconds (Fig.5) 16. "CAL1" will be appear on the lower display (Fig. 6) 17. Select by press 4 the turbo boost calibration "tb14" and "tb20" or the transmission calibration "trnc" Note : Automatic exit of calibration occurs if : - gearbox temperature is too cold, it displayed on the lower sceen "trAn COld" or error code 21. - engine speed is out of range, it displayed on the lower screen "Spd FAIL" or error code 22, 23, 24.
Transmission calibration "trnc" (Fig. 5)
Note : Before starting the transmission calibration, connect the calibration speed sensor (red single wire) to PTO wire (brown single wire, near the TC connector E). This operation is done by removing the TC shield. 18. Select "trnc" (see operations 14 to 17) 19. Set the engine speed at 1300 rpm. 20. Press 5 then "St0" is displayed (Fig. 7) in the lower screen and in middle screen"trAn" and "CAL" are flashing alternately 21. First put the armrest lever in forward position and after words the steering column lever in forward position. Note : For tractor fitted with shift lever NAO type (single lever NAO type 8170/8180), put it in forward position.