Job General Information Well Information Job Technical Information
Information
WL Work-Order Number 23-03-39 Well Name AZNS-52-WO1 Service CBIL-GR-CCL Lead Engineer E. Cheraghsahar
Mobilization Date 8/Mar/23 Hole Size 9.625 IN & 7IN Assistant Engineer
Location Azadegan Depth (TD) 4140 m Conveyance WL Trainee Engineer
Client South Azadegan Casing Size 7 in Crew Chief M. Ghaderi
Rig Name TDDC-301 Casing Shoe Depth 4128 m Unit/Truck Number Truck 9901
Field Name South Azadegan Logging Interval 4125 m - 50 m
NA
Rig Contact Number N/A Y Max Deviation Vertical Workshop/Offshore Box No.
M. Tahvili
High Profile Job? E ✘
✘ ✘
Unit/Truck Q check valid? Cable Torture test passed?
Rig Up Equipment have valid MPI? ✘ Depth, Tension, Winch Panel System Checked and Operational? ✘ checked
BOP has Pressure test and MPI? only MPI Acquisition Software checked and ✘
✘
Operational?
✘
PCE Pressure test valid? ✘ Cable head Serviced, Checked and Operational?
All Lifts have valid MPI certificates ✘ Back-Up for Downhole Tools and Surface Equipment Available? ✘ There is no back up panel
Cable Head Q-Check , Weak Point valid? Main and Backup Equipment have valid Calibrations for the job? ✘
✘
✘ ✘
Fishing Equipment have valid MPI? Standby in Ahvaz Main and BU equipment checked in the toolstring and fully Operational (FIT3)?
Enough Auxilary Equipment has been checked, Taken and Approprite for the desired Size
Any third party Equipment involved? ✘
(Gemco-Standoff-Centralizers-Decentralizers )
✘
Required Cross overs/ Adaptors have valid certificates? TLC Equipment Properly checked in the Toolstring and Operational?
✘
✘
Journey Plan discussed with QHSE?
✘
Crew Chief has enough experience to HAZMAT filled properly and Dosimeter, Hazmat keys taken?
do the job? ✘ ✘
✘
Winch man is winch certified? (Perferably 2 Winchman) ✘
✘
2- Back up CBIL sonde has not been run before. 3. Reviewed past failures, LFI and best practises relevant to the Operation? ✘
After Job
Job KPIs Yes / No Engineer Comment FSM Comment Job Closure Yes / No / NA Engineer Comment FSM Comment
46 Hrs
✘
Job is done according to logging program? FIT1,FIT2 and FIT 3 completed? (With post job handover to the Owner)
procedures?
✘
Client was satisfied with Data?
WireLine
COMPANY TDDC
WELL AZNS-52
Engineer E. Cheraghsahar
Job Highlights
Interval was long and managed to record it.
Rig TDDC-301
Location AHVAZ
Service CBIL-GR-CCL
8-Mar-23 13:00
8-Mar-23 16:30
9-Mar-23 7:30
9-Mar-23 8:30
9-Mar-23 10:30
9-Mar-23 14:00
9-Mar-23 18:00
9-Mar-23 21:00
9-Mar-23 23:00
10-Mar-23 2:30
10-Mar-23 6:30
10-Mar-23 9:30
11-Mar-23 3:45
11-Mar-23 5:30
11-Mar-23 12:00
-02)-TTRm(10295100)-CCL(12-05-07)-Tele(3514-10041337)-GR(1329-091306)-ORIT(4401-
10150818)_CBIL(1671MB-10150030).
xj-13-05-02)-TTRm(10295100)-CCL(12-05-07)-Tele(3514-10184846)-GR(1329-091306)-ORIT(4401-
188543)_CBIL(1671MB-10150030),
13-05-02)-TTRm(10295100)-CCL(12-05-07)-Tele(3514-10184846)-GR(1329-091306)-ORIT(4401-
10150818)_CBIL(1671MB-188534).
Run2: 4 H
Run3: 20 Hrs.
s
of Runs: Every set of service RIH.
e: Please consider every Loss time even if it is not raised by client.
rity: According to severity classification, L<10K$ , 10K<S<100K$ , 100K<M<1M$, M>1 M$
8 Main Acqusition System
15 Main Laptop :
Run No. 3
8-Mar-23 16:30
9-Mar-23 7:30
9-Mar-23 8:30
9-Mar-23 10:30
9-Mar-23 14:00
9-Mar-23 18:00
9-Mar-23 21:00
9-Mar-23 23:00
10-Mar-23 2:30
10-Mar-23 6:30
10-Mar-23 9:30
11-Mar-23 3:45
11-Mar-23 5:30
11-Mar-23 12:00
6)-ORIT(4401-
9-091306)-ORIT(4401-
091306)-ORIT(4401-
Run2: 4 Hrs,
3: 20 Hrs.
1M$, M>1 M$
BHDC Acquisition panel
HP Work station
DATE 3/12/2023