Professional Documents
Culture Documents
Argon
ESAB OK TIG Plate and Impact Tested at PL WPQT
2 Sampson Christian 080 14-Jul-10 X60 ML2 API 1104 PLT-013 PIPE BW 4 6,00 (99.99% GTAW A 5.28 (ER80S-Ni)
ROD 13.23
— 5G 12 lit / min GTAW 2.4mm PLVT-003
Pipe -60ºC 003
mixture)
Argon
ESAB OK TIG Plate and Impact Tested at PL WPQT
3 Shoun Mohammed 179 14-Jul-10 X60 ML2 API 1104 PLT-014 PIPE BW 4 6,00 (99.99% GTAW A 5.28 (ER80S-Ni)
ROD 13.23
— 5G 12 lit / min GTAW 2.4mm PLVT-003
Pipe -60ºC 003
mixture)
OERLIKON 3.2mm /
A5.5 (E 7010-P1 / Plate and Impact Tested at PL WPQT
4 Alfred Amutadi 271 9-Aug-10 X60 ML3 API 1104 PLT-017 PIPE BW 10 15.88 N/A SMAW A5.5 E 8018-G)
(FLEXAL 70 / 5G N/A SMAW 3.2 & PLVT-004
VERTICOR 80) Pipe -20ºC / -40ºC 004
4,0mm
OERLIKON 3.2mm /
A5.5 (E 7010-P1 / Plate and Impact Tested at PL WPQT
5 Sanjay Kumar Yadav 269 9-Aug-10 X60 ML3 API 1104 PLT-017 PIPE BW 10 15.88 N/A SMAW A5.5 E 8018-G)
(FLEXAL 70 / 5G N/A SMAW 3.2 & PLVT-004
VERTICOR 80) Pipe -20ºC / -40ºC 004
4,0mm
Argon
ESAB OK TIG Plate and Impact Tested at PL WPQT
6 Wilcox Edmond Labo 268 17-Aug-10 CS ML1 API 1104 PLT-023 PIPE BW 1 4.55 (99.99% GTAW A 5.28 (ER80S-Ni)
ROD 13.23
5G 12 lit / min GTAW 2.4mm PLVT-009
Pipe -60ºC 007
mixture)
Page 1 of 9
OML 58 Phase 1 Project
Page 2 of 9
OML 58 Phase 1 Project
Page 3 of 9
OML 58 Phase 1 Project
Page 4 of 9
Anthony
68 130 ST-036 18-Apr-10 CSBST 1 AWS D1.1 TP-308 CS PLATE
Nwaboakata
STR WQT-
N/A N/A WQTR-069 PHC
002
27-Apr-11 26-Apr-12
27-Apr-11 26-Apr-12