No:-SEI/QA/F-03
Shift M/C No. Date IN OUT Operator name Operator code Part name Part Number Operation Name Next operation Customer
Time:-
INSPECTION STANDARD First five pcs.reading Rejection / Rework Details
Status
Sample Inspection (OK/NG)
DIM. NO. Parameters Specfication Insp.method
Size Feq.
Recording 1 2 3 4 5 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. U/S O/S
Note: Rasied QPCR If Any defects :- (A) IF PART REJECTED ≥10% OF PROD./2 HOURS. , (B) IF PART REJECTED ≥5% NOS 101~1000 NOS./SHIFT PROD.. , (C) IF PART REJECTED ≥2% MORE THAN 1000 NOS./SHIFT PROD.(D) ABNORMAL SETTING REJECTION ≥ 15 PCS
REMARKS:-
Note: All Dimmensions are in mm Legends DVC -Digital veriner, MM-Micrometer, PP -Profile Projector, RHT-Rockwell Hardness Tester, DMM -Digital Micrometer, RT-Roughness Tester, TRG- Thread Ring Gauge
DOC.No:-SEI/QA/F-03
Shift M/C No. Date IN OUT Operator name Operator code Part name Part Number Operation Name Next operation Customer
Time:-
INSPECTION STANDARD First five pcs.reading Rejection / Rework Details
Status
Sample Inspection (OK/NG)
DIM. NO. Parameters Specfication Insp.method
Size Feq.
Recording 1 2 3 4 5 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. U/S O/S
Note: Rasied QPCR If Any defects :- (A) IF PART REJECTED ≥10% OF PROD./2 HOURS. , (B) IF PART REJECTED ≥5% NOS 101~1000 NOS./SHIFT PROD.. , (C) IF PART REJECTED ≥2% MORE THAN 1000 NOS./SHIFT PROD.(D) ABNORMAL SETTING REJECTION ≥ 15 PCS
REMARKS:-
Note: All Dimmensions are in mm Legends DVC -Digital veriner, MM-Micrometer, PP -Profile Projector, RHT-Rockwell Hardness Tester, DMM -Digital Micrometer, RT-Roughness Tester, TRG- Thread Ring Gauge