PURPOSE
To avoid misuse of welding electrode
To provide welders with good condition electrode in order to get sound weld
RESPONSIBILITY
TPCS QC MONITOR
SUBCONS QC MANAGER Audit / SUPERVISION
CONTROL OF STORAGE
ONLY AUTHORIZED QC INSPECTOR & WELDING FOREMAN REGISTERED WITH SUBCONS QC DEPARTMENT SHALL AUTHORIZED TO SIGN THE WELDING REQUEST SLIP WELDING MATERIAL CONTROLLER SHALL NOT ISSUE ANY WELDING ELECTRODES/ FILLERS TO WELDER WITHOUT ANY APPROVED WELDING REQUEST SLIP. ALL RECORDS OF THE REQUESTING & ISSUING OF WELDING ELECTRODES / FILLERS SHALL BE FILLED AND MAINTAINED
WELDING ELECTRODE SHALL ONLY BE ISSUED TO WELDER WITH A WORKING QUIVER (FOR STORAGE & WARMING) EACH ISSUE SHALL BE LIMITED TO 3 KG PER EACH QUIVER. ONE QUIVER IS ALLOWED TO CONTAIN ONLY ONE TYPE OF ELECTRODE
MATERIAL CONTROLLER SHALL CHECK THE WELDING MATERIAL REQUEST FORMS FOR QUANTITY & TYPE OF WELDING MATERIAL BEFORE ISSUING ELECTRODE THAT HAVE BEEN RE-DRIED SHALL BE ISSUED FIRST
WELDING FOREMAN SHALL ENSURE ALL QUIVER & UNUSED ELECTRODE / FILLER RODS TO BE RETURNED TO THE WELDING MATERIAL STORAGE AREA AT THE END OF THE DAY
WELDING MATERIAL CONTROLLER SHALL SEPARATE UNUSED ELECTRODE FOR RE-DRIED OR DISPOSAL AS REQUIRED ELECTRODE SHALL NOT BE RE-DRIED MORE THAN ONCE. AFTER THE SECOND RE-DRIED, THE LEFT OVER WILL BE DISPOSED
Welder no / Name Type of electrode / size Type of filler rod / size Drawing no/Line no
/ / /
Item
Date
Electrode
Electrode
Electrode
Baking Time
Re-baking Time
Baking /
Material Controller
Brand
Batch No
Size
Start
End
Start
End
Temperature
Name/Sign
Item
Welder No
Electrode Type
Size
Qty Issue
Time Return
Issued By Name/Sign