You are on page 1of 1

85 AS/NZS 1554.

1:2014

PROCEDURE QUALIFICATION RECORD


Material spec/grade to
Fabricator PQR No.
Process Date qualified
Welding Standard Welded by
Edge preparation Page
Weldability group No. Revision Date
Specimen thickness Qualified position
Preheat temperature PWHT
Inter-run temperature Hold
Type and check method Other
Run sequence Joint details
Prequal joint No.
To Table
Root gap G mm
Root face F r mm
Incl. angle  °
Backing
Specification—Root Remainder Flux
Classification—Root Remainder
Shielding gas Flow rate
Copyrighted material licensed by SAI Global UNIVERSITY OF MELBOURNE LIBRARY. Accessed on 2020-02-28.

Purge gas Flow rate


Weld run details Welding parameters
No. Side Position  mm Trade name Amperage Voltage Current Speed Heat
and mm/min input
polarity kJ/mm

Technique Stringer/weave
Initial cleaning Electrical stick-out
Reproduction,distribution,storage or use on a network is prohibited.

Inter-run clean Backgouge method


Nozzle size Backgouge check
Test results
Test type Visual Macro Tensile Bend Charpy-V Hardness Other
Test by
Report No.
Result
Notes/revisions

Witnessed by Approved by

COPYRIGHT