METHOD STATEMENT FOR

TSE TANK DN1OOO VALVE


REMOVAL & INSTALLATION

Contents
1 Introduction 2
1.1 Purpose 2
1.2 Scope 2
1.3 References 2
1.4 Definitions 2
2 Materials 3
3 Personal Protective Equipment 3
4 Safe Working Environment 3
5 Procedure 3
5.1 Identification of TSE1 Holding tank DN1000 Butterfly valve 3
5.2 Removal of DN1000 Butterfly valve 4
5.3 Reinstallation of DN1000 Butterfly valve 4
5.4 Environmental Conditions 4
6 Waste Management 4
7 Inspection and Testing 5

Prepared By Reviewed By Approved By

Name Tanveer Ahmed Christopher Tanveer Ahmed


Eloyaebage

Designation Mechanical Engineer HSE Officer Mechanical engineer

Signature

Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6

Method Statement for inlet screen servicing 1/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION

Date

1 Introduction
1.1 Purpose
This Method Statement describes the activities to be followed for removal of TSE holding tank
DN1000 Butterfly valve at DS STP.

1.2 Scope
This Method Statement applies to the following activities
1. Inspection of DN1000 butterfly valve
2. Removal of DN1000 Butterfly valve by crane & related O ring and gasket etc.
3. Re-installation of New DN1000 Butterfly valve by crane.
4. DN1000 Butterfly valve observation after installation during operation

1.3 References
● Manufacturers O&M Manual. Manufacturer DN1000 Butterfly valve
● PWA approved mechanical equipment service centres.

1.4 Definitions
DS STW - Doha South Sewage Treatment Works
MS - Method Statement
RA - Risk Assessment.
H2S - Hydrogen Sulphide gas evolved from incoming sewage.
PTW - Permit to work.
OCU - Odour Control Unit.

1.5 Responsibilities and Authorities


Designation Responsibilities and Authorities

Site In-charge Review and approve the documentation and assist subcontractors at
site.

Coordination activity with PWA site engineers and plant operator.

Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6

Method Statement for inlet screen servicing 2/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION

Ensure the method statement is followed.

Site Engineer Ensure that safe removal and installation of DN1000 Butterfly valve
Inspect DN1000 Butterfly valve after installation and ensure it is refaxed
properly at site.
Review after service documents.
Obtain permits and isolations from plant operator METITO.
QA/QC Officer Ensure that the Quality Assurance aspect of the procedure is adhered
to.
Safety Ensure that the HSE aspect of the procedure is adhered to.
Supervisor/Officer

2 Materials
The following materials shall be used

1. Mechanical Hand tools


2. Miscellaneous consumables like plastic sheets, adhesive tapes, sand paper, cleaning clothes
Dewatering submersible pump, chain block, Boom truck etc..

3 Personal Protective Equipment


Protective clothing, helmet, safety glasses, safety shoes, hand gloves, face shield, H2S gas
detectors, tripod etc.

4 Safe Working Environment


Ensure that Electrical and Mechanical permits are obtained and isolation is carried out effectively
by METITO on UF, TTP, FE9 Chamber penstock etc.

5 Procedure
Identify the DN1000 Butterfly valve which is to be removed and repaired and follow the
procedure as under.

Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6

Method Statement for inlet screen servicing 3/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION

5.1 Identification of DN1000 Butterfly valve


● After the method statement and risk assessment is approved, Liaise with the plant operator
M/s. METITO to identify the DN1000 Butterfly valve which is to be removed, repaired and
reinstall
● Obtain necessary permits to work and carry out electrical and mechanical isolations for DN1000
Butterfly valve at TSE1 holding tank. Ensure the proper isolations of TTP, UF, FE9 Chamber
penstock prior to remove the valve.
● Inspect the DN1000 Butterfly valve Clear the area of any obstacle for removal and during the
Reinstallation of New butterfly valve.
● Clean and drain the excessive water of the pipe to avoid any biological hazard.
● Ensure no open manholes are left at site and the area is barricaded properly as other contractors
are working at site at the inlet works.

5.2 Removal of DN1000 Butterfly valve


Arrange the proper tools for removal of DN1000 Butterfly valve like Nuts and Bolts and associated
Gaskets and Actuator connection and link etc.

Upon isolation of the UF Feed pumps and associated Inlet and outlet valve, Dismantle the coupling from
UF feed line, check the condition of the Gasket for any defect, damage and improper installation etc.
Repair or replace the Gasket by new one.

Lift all the dismantled motors and gearboxes from top level at inlet works and lower to ground level for
transportation to workshop.

Barricade the complete chamber area so that no personnel shall enter the area once the coupling is
removed repaired and the opening exposed.

5.3 Reinstallation of DN1000 Butterfly valve


Upon rectification of the water leakage throughout the coupling Reinstall it by proper tightening of the
Allen bolts both the sides equally.
Remove all the tools and debris from that area.
De-isolate the UF feed pumps and inlet and outlet valve, close the permits and take the feed pumps in
operation.
Keep the Pumps in operation and observe the feed pipe line coupling for any water leakage for seven
days.

Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6

Method Statement for inlet screen servicing 4/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION

5.4 Environmental Conditions


The area carries a H2S gas hazard inside the UF feed pipe line valve chamber . Proper H2S monitoring
to be done all the time.

There is also sewage water truck unloading area with high stack where the H2S can released into air,
there are chances that there will be H2S content at sewage water truck unloading area and septage
screens

The present operator arranges delivery of chemicals like Sodium Hydroxide, Sodium hypochlorite and
Ferric chloride in bulk tankers for use in the treatment process. Release of gases during delivery of
these chemicals remains a hazard.

6 Waste Management
Any debris that is generated during installation or removal of UF feed lineTEEKAY Coupling to be
removed and disposed of effectively.

All metallic waste to be delivered to PWA as scrap.

7 Inspection and Testing


Upon installation of UF feed pipe line TEEKAY coupling and upon starting all the UF feed pumps
ensure that there is no leakage found during the operation.

Workshop report to be provided as part of service carried out.

Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6

Method Statement for inlet screen servicing 5/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021