1 Introduction 2
1.1 Purpose 2
1.2 Scope 2
1.3 References 2
1.4 Definitions 2
2 Materials 3
3 Personal Protective Equipment 3
4 Safe Working Environment 3
5 Procedure 3
5.1 Identification of TSE1 Holding tank DN1000 Butterfly valve 3
5.2 Removal of DN1000 Butterfly valve 4
5.3 Reinstallation of DN1000 Butterfly valve 4
5.4 Environmental Conditions 4
6 Waste Management 4
7 Inspection and Testing 5
Signature
Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6
Method Statement for inlet screen servicing 1/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION
Date
1 Introduction
1.1 Purpose
This Method Statement describes the activities to be followed for removal of TSE holding tank
DN1000 Butterfly valve at DS STP.
1.2 Scope
This Method Statement applies to the following activities
1. Inspection of DN1000 butterfly valve
2. Removal of DN1000 Butterfly valve by crane & related O ring and gasket etc.
3. Re-installation of New DN1000 Butterfly valve by crane.
4. DN1000 Butterfly valve observation after installation during operation
1.3 References
● Manufacturers O&M Manual. Manufacturer DN1000 Butterfly valve
● PWA approved mechanical equipment service centres.
1.4 Definitions
DS STW - Doha South Sewage Treatment Works
MS - Method Statement
RA - Risk Assessment.
H2S - Hydrogen Sulphide gas evolved from incoming sewage.
PTW - Permit to work.
OCU - Odour Control Unit.
Site In-charge Review and approve the documentation and assist subcontractors at
site.
Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6
Method Statement for inlet screen servicing 2/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION
Site Engineer Ensure that safe removal and installation of DN1000 Butterfly valve
Inspect DN1000 Butterfly valve after installation and ensure it is refaxed
properly at site.
Review after service documents.
Obtain permits and isolations from plant operator METITO.
QA/QC Officer Ensure that the Quality Assurance aspect of the procedure is adhered
to.
Safety Ensure that the HSE aspect of the procedure is adhered to.
Supervisor/Officer
2 Materials
The following materials shall be used
5 Procedure
Identify the DN1000 Butterfly valve which is to be removed and repaired and follow the
procedure as under.
Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6
Method Statement for inlet screen servicing 3/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION
Upon isolation of the UF Feed pumps and associated Inlet and outlet valve, Dismantle the coupling from
UF feed line, check the condition of the Gasket for any defect, damage and improper installation etc.
Repair or replace the Gasket by new one.
Lift all the dismantled motors and gearboxes from top level at inlet works and lower to ground level for
transportation to workshop.
Barricade the complete chamber area so that no personnel shall enter the area once the coupling is
removed repaired and the opening exposed.
Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6
Method Statement for inlet screen servicing 4/5 Version No: 1.0
207-VW-DOH-006
Issue Date : 02 March 2021
METHOD STATEMENT FOR
TSE TANK DN1OOO VALVE
REMOVAL & INSTALLATION
There is also sewage water truck unloading area with high stack where the H2S can released into air,
there are chances that there will be H2S content at sewage water truck unloading area and septage
screens
The present operator arranges delivery of chemicals like Sodium Hydroxide, Sodium hypochlorite and
Ferric chloride in bulk tankers for use in the treatment process. Release of gases during delivery of
these chemicals remains a hazard.
6 Waste Management
Any debris that is generated during installation or removal of UF feed lineTEEKAY Coupling to be
removed and disposed of effectively.
Contract: Doha South STW and Industrial Area STW Operations and Maintenance Contract Contract No: C2009/6
Method Statement for inlet screen servicing 5/5 Version No: 1.0