EL 860.00 M C
L OF SYM
EL 860.00 M
TBL TBL

TECHNICAL DETAILS
S.No.
1 NO OF VENTS 4 NOS
1 COMMON SET (3 ELEMENTS - 1
EL 857.00 M EL 857.00 M TOP, 1 BOTTOM & 1 MIDDLE
FRL FRL 2 NO OF GATE ELEMENTS INTERCHANGEABLE
ELEMENTS) FOR ALL 5 VENTS

3 TYPE OF GATE VERTICAL LIFT FIXED WHEEL TYPE


4 CLEAR VENT WIDTH 5600 MM
5 CLEAR VENT HEIGHT 7100 MM
6 SILL LEVEL EL 810.28 M
7 FRL EL 857.00 M
THE SEALING OF THIS GATE SHALL
8 LOCATION OF SEALS BE UPSTREAM SIDE RESPECTIVE
TO GENERATION MODE

OPERATING (LIFTING & LOWERING)


9 OPERATION WILL BE DONE UNDER BALANCED
TRACK TRACK
HEAD CONDITION
1 No. COMMON GANTRY FOR
10 OPERATED BY
ALL 5 VENTS

EL 817.38 M
TOP SILL LVL
EL 817.38 M
TOP SILL LVL CONCRETE 1st STAGE M25 GRADE

CONCRETE 2nd STAGE M30 GRADE

GENERATION SIDE

PUMPING SIDE
FOR DPR PURPOSE ONLY

Revn. Description Size Signature

Client
GREENKO KA01 IREP PVT. LTD
EL 810.28 M EL 810.28 M
SILL LVL SILL LVL Project
SAUNDATTI PUMPED STORAGE PROJECT

Title
INTAKE STRUCTURE
SECTION A-A
GENERAL ARRANGEMENT OF MAINTENANCE GATE
Consultants

aarvee associates
architects engineers & consultants pvt ltd.

NOTE:- ALL DIMENSIONS ARE IN MM LEVELS IN METERS.