Company - Profile
1
21-09-2019
Company - Profile
Our Products:
Generic Formulations, including Tablets,
Capsules, Injectables, and Topical
creams, is the largest part of our business
portfolio.
making products across the
major therapeutic areas of gastrointestinal
ailments, cardiovascular disease, pain
management, oncology, anti-infective,
pediatrics and dermatology.
30
countries
10 API Manufacturing
Facilities 14 Formulations Manufacturing
Facilities 09 Global R&D
Centres 01 Integrated Biologics
Centers
2
21-09-2019
Environment
&
Community
Quality Availability
Safety
Engineering
People
Excellence
Continuous
Productivity
Improvement
Environment
&
Community
Quality Availability
Safety
Engineering
People
Excellence
Continuous
Productivity
Improvement
3
21-09-2019
43500000 30%
41605395 7772
4
21-09-2019
Thermal Energy consumption (Million Kcal) Specific consumption (Million kcal/Million units)
46756
9.7
35064 35060
8.1 19%
6.5 24%
Dr.
Jubilant
Reddy’s Infosys
Baseline
Baseline Sun Tata
Parameters -2012-13 Lupin ITC
-2009-10 pharma Targets for Motors
Target
Target FY19
for 2020
for 2020
Reduce Per capita
Reduction in Specific Water
40% 12% NA NA consumption by 2% NA Water Neutral
Consumption over FY18
Reduce Per capita
Reduction in Specific Energy
40% 12% NA NA consumption by 2% NA Carbon neutral
Consumption over FY18
Committed
55% electricity
for 100%
Increase in renewable energy share 25% - NA NA requirement shall be
RE without
Green Energy
met through RE
target date
5
21-09-2019
Zero Landfill and 40% coprocessing Interim Target 81% 91% 87.3%
6
21-09-2019
Savings / Annum
S.No Project Description
(RS - Millions)
1 Upgraded Air Handling Unit Existing Conventional blower by EC Blowers 12.91
8 Optimized utility pumps operation based on current duty point requirement 3.28
7
21-09-2019
Savings / annum
S.No Project Description
(RS - millions)
1 Upgraded existing Compressed air distribution system to Ring Main System 1.00
Effectively reduced the power consumption by installing centrifugal
2 compressor 9.60
in place of 8 no's screw compressors
Upgraded existing Compressed air drying/de-humidification system by
3 6.40
installing zero purge loss Dryer in place of purge loss desiccant dryer.
4 Existing Aged chiller replaced with energy efficient chiller 6.00
Upgraded Air Handling Unit Existing Conventional blower by EC Blowers
5 4.50
phase-II
6 Introduced eco plugs in AC units to reduce power consumption by 15% 1.00
8
21-09-2019
Eliminated individual stand alone de-humidifiers & reduced power consumption of HVAC ( Catering to low RH area) by25%
9
21-09-2019
1, HVAC cooling efficiency improved by installing Artic Master And achieved 20% saving on energy consumption
2,Condenser Tube cleaning system installation in Heat Pump to maintain condenser approach temperature and achieved
5% energy saving
This project involves innovative technology, excellent potential of energy
savings without effecting the chilling plant normal operation, eliminating
chiller down time due to off line descaling activity and the system helps to
maintained chilling plant efficiency at higher side. (1 o C rise in condenser
approach increases the chiller power consumption by 2 -4%. As chillers run
the energy wasted due to the rise in condenser approach was high
Tangible Benefits
1. Reduction of electrical energy consumption in plant
Condenser Tube cleaning system FY-2019
Total power Total Saving in Carbon Emission
Sl No
Saved(KWH) INR Reduction(Tons)
1 215384.6 1.4 Million 174
2. Eliminated Heat Pump de-scaling activity
3. Eliminated use of de-scaling chemicals
4. Heat Pump efficiency improved
5. Auto mode operation
Intangible Benefits
1. Carbon Emission Reduction
10
21-09-2019
3, Upgraded air handling unit existing Conventional blower by EC blowers and achieved 35 to 40% energy saving
We added 15 MW solar power plant in FY 19 and the renewable solar power component
shall reach to 15% of overall consumption. Total PowerConsumption
(KWh)
11
21-09-2019
% OF RENEWABLE ENERGY
ENERGY IN TERA JOULES(TJ)
5000 100%
4500 90%
4000 80%
3500 70%
3000 60%
2500 50%
2000 38% 40% 40%
1500 14% 30%
1000 12% 12% 14% 12% 20%
8% 8%
500 10%
0 0%
FY-14 FY-15 FY-16 FY-17 FY-18 FY- FY- FY- FY-
19(Est) 20(Est) 21(Est) 22(Est)
12
21-09-2019
GHG Inventorisation
Scope 1 Emission Scope 2 emission KgCO2/Millions
12000 50,000 of product
10160 48,298 14000
12503
10000 48,000 12075 11838
12000
8330 8280 10262
8000 46,000 10000
44,000 8000
6000
41,853 6000
42,000 41,493
4000
4000
40,000 2000
2000
38,000 0
0 2015- 2016- 2017- 2018-
Scope 2 Scope 2 Scope 2
Scope 1 Scope 1 Scope 1 16 17 18 19
emission in emission in emission in
emission in MT emission in MT emission in MT MT CO2 MT CO2 MT CO2 KgCO2/Millions
12503 12075 11838 10262
CO2( FY17) CO2 (FY18) CO2 (FY19) (FY17) (FY18) (FY19) of product
13
21-09-2019
5400 5400
5400
2016-17 5000 5000 5000
2017-18
2018-19
Waste Sent to
Waste Sent to
Fly ash cement/Brick Boiler Soot
Waste Recycled Waste Recycled cement/Brick
Generated (KG) industries Generated (KG)
industries industry
industry
2016-17 17000 17000 17000
2016-17 0 0 0
2017-18 5000 5000 5000
2017-18 11537125 11537125 11537125
2018-19 5400 5400 5400
2018-19 10267610 10267610 10267610 2016-17 2017-18 2018-19
Fly ash sending to brick industries utilisation Boiler soot sending to cement industries
utilisation
14
21-09-2019
15
21-09-2019
Energy Manager
Top Management
Engineering Head
Guide for implementation & review all Top-down
Guide & review all bottom-up initiatives
initiatives Lean & Six Sigma Projects
Energy PACE Projects
Manager Engineering
16
21-09-2019
17
21-09-2019
% Investment on Turnover
18
21-09-2019
End of Line automation and AGV implementation • Prevent the Risk of product Mix up
A complete automation solution at the end-of-line packing has• Automatic Air, Sea Shipment & slip sheet pallet programmed in palletizers -
been commissioned at our manufacturing facility. • Can handle all bottle and blister packing formats and sizes. Flexibility is built in to handle future packing
The packing solution includes requirements
1. an automated case packer, • Regulatory and Competitive advantages. Online digitized labels - generation and application
2. robotic palletizer and • Prevented installation of ~250 Meters of Mechanical conveyors with implementation of AGVs.
3. auto-guided vehicles. • Highly innovative technologies implemented for safe operations
This facility provides a seamless integration for the material • 90% of the packing & ware house operations will be simplified and automated without any changes in
transfer of the finished goods and the warehouse the Business Process.
19
21-09-2019
20