Professional Documents
Culture Documents
PB1
PB1
PB1
TAKE PRECEDENCE.
7. ALL CONCRETE WORKS IN
ACCORDANCE WITH IS 456:2000
(REVISION 2016).
6000
8. CONTRACTOR TO VERIFY DIMENSIONS
WITH ARCHITECTURAL DRAWINGS
BEFORE EXECUTION.
9. SBC CONSIDERED 12 T/M2 AT 3.0M
DEPTH, HOWEVER SOIL CONDITION TO
PB1 PB1
BE VERIFIED BEFORE EXECUTION.
H
PB1
PB1
PB1
ISLAND TOP EDGE
6000
PB1 PB1
G
PB1
PB1
PB1
6000
18600 14700 4000
PB1
PB1
PB1
Y
PB1
PB1
ISLAND
3000
SLOP
6300
PB1 PB1 PB1 PB1 PB1 PB1
X E X
3000
42300
PB1 PB1 Y PB1
D
PB1
PB1
PB1
6000
REV. DESCRIPTION DRN CHK DATE
PB1 PB1
ISLAND TOP EDGE
C
PB1
PB1
PB1
CLIENT
6000
PROJECT NAME
Design, Supply, Installation, testing commissioning of
Multifaced Spectacle
PB1 PB1 (Musical Fountain and Water Screen) Five Year O & M
B Period including two years DLP at Vinayak Sagar
PB1
PB1
PB1
Tirupati
9th Floor,
Infinity Tower C
DLF Cyber City,
6000
DLF Phase II
Gurgaon 122002
Haryana, India
T: +91 124 2816000
F: +91 124 2816008
www.aecom.com
ACM-TSC-VS-MF-DWG-ST-2002 R 0