Professional Documents
Culture Documents
GENERAL NOTES
6. REINFORCEMENT DETAILING IS
CONFORMING TO IS 13920: 1993
S2 8. CONCRETE M 20
C
RL5
11'
S2 3 FUTURE FLOOR
B RL3
11'
2 FIRST FLOOR
6' 3" x 3' 9" B1 RL2
A
11'
1 GROUND FLOOR
PL RL1
GL GL
RL0
KEY - LEVEL
PROJECT
1 2 3 4 5 6 DEV, EXTENSION
ARCHITECTURAL CONSULTANT
SCHEDULE OF SLABS
S NO SLAB SLAB R/F ALONG R/F ALONG DIST. R/F ALONG EXTRA R/F ALONG EXTRA R/F ALONG ASSOCIATES
H. NO: 3-7, NAGARAM, KEESARA,
THICK SHORTER SPAN LONGER SPAN LONGER SPAN SHORTER SPAN LONGER SPAN MEDCHAL, T.S, 500083
1 S2 4" #10mm@4"c/c #10mm@4"c/c - #10mm@8"c/c #10mm@8" c/c DEALT DATE REVISION
06-05-2019
SCALE JOB NO DRAWING NO
1:1 4
L RIGHT
0.3L SECONDARY BEAM SUPPORT
SUPPORT
LEFT
RIGHT
SUPPORT
0.20L
Ld+10Ø
0.15L 0.20L
R/F ALONG SHORT DIRECTION BENT- UP
MAIN BEAM
HANGER BOTTOM BARS
R/F ALONG LONG DIRECTION LEFT
TYPE BAR SUPPORT