NOTES:

1. EARTHING CONNECTIONS SHALL BE


ADJUSTED AS PER SITE CONDITION.
2. MAIN EARTHING CONNECTION SHOULD
BE CONNECTED TO EXISTING EARTHING
BAR/ROD OR BUILDING STEEL STRUCTURE.
3. MATERIAL LIST:

TO INVERTER
TO GROUND
BONDING
(GROUNDING ROD)
1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.1.11 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.2.10

REFERENCE FILES:
1. WGLS-LEG-SRA_TR_001
2. SOLAREDGE SE5000H DATA SHEET

2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10
8000

CONDUIT LAYOUT
SCALE: NTS
PRC NO. PRC VALIDITY DATE

PTR NO. PTR DATE ISSUED

PROFESSIONAL ELECTRICAL ENGINEER PTR PLACE ISSUED TIN NO.

END CLAMP/ DATE

MID CLAMP BUILDING OWNER PLACE

MOUNTING RAIL
1 FOR CONSTRUCTION K. BAYOT 03.12.2019
GROUNDING LUG A FOR INFORMATION K. BAYOT 02.07.2019

REV: DESCRIPTION: BY: DATE:

MOUNTING RAIL STATUS:


FOR CONSTRUCTION

GROUNDING CABLE
GROUNDING CABLE 1 x 1C - 5.5mm2 DIOCESE OF LEGAZPI
ST. RAPHAEL THE ARCHANGEL PARISH - CONVENT 1
LEGAZPI CITY, ALBAY, 4500
1 x 1C - 5.5mm2 PHILIPPINES

MOUNTING RAIL RAIL SPLICE

WeGen ENERGY PHILIPPINES


UNIT 2802D/2803A WEST TOWER, PSE CENTER
NEC 690.45(A) REQUIRES THAT EQUIPMENT GROUNDING CONDUCTORS EXCHANGE RD., ORTIGAS CENTER
PASIG CITY, PHILIPPINES 1605
FOR PV SOURCE AND OUTPUT CIRCUITS BE SIZED IN ACCORDANCE
WITH NEC TABLE 250.122, WHICH ALLOWS FOR A SMALLER GAUGE
GROUND WIRE, SUCH AS A # 10 (6mm2) OR #12 AWG (4mm2), TO BE PROJECT:
11.97kWp PV PROJECT
USED IN THIS PORTION OF THE PV SYSTEM. THIS EQUIPMENT-GROUNDING LEGAZPI - ST. RAPHAEL THE ARCHANGEL
REQUIREMENT IS ONLY NEAR THE PV SOURCE (MODULE STRING)AND PV PARISH - CONVENT 1
OUTPUT CIRCUITSAND PV OUTPUT CIRCUITS (DC COMBINER TO INVERTER). TITLE:

PV GROUNDING LAYOUT
SCALE AT A3: DATE: DRAWN: CHECKED:

TYPICAL GROUNDING CONNECTIONS N/A


PROJ. CODE:
02.07.2019
DRAWING NO:
K. BAYOT RMC
SHEET:
1
SCALE: NTS LEG LEG-SRA-EE-GRD-001-1 REV:
1