COLUMN SCHEDULE
U P TO HARD STRATA
FOOTINGS M20 50
COLUMNS M20 40
BEAMS M20 25
COLUMN COLUMN COLUMN COLUMN PEDESTAL
AS PER SITE
OR
TIES PEDESTAL SLAB M20 20
(D)2' MIN
S.No. NO'S REINFORCEMENT REINF,ALONG -B
GROUP SIZE(AxC) SECTION SIZE(ExF) WALLS M20 20
D
Y12-6Nos P.C.C 1:4:8
CORRECTNESS OF THE SAME BEFORE EXECUTION OF THE WORK. THE FOUNDATION
SHALL BE PLACED ON FIRM SOIL FREE OF ANY EXPANSIVE SOIL.
1 C1 9 15"X18"
6"
9"X12" TIESY8@8"c/c 8. COVER SPECIFIED SHALL BE PROVIDED TO ALL TYPES OF REINFORCEMENT
SECTION X-X USING DULY CURED WIRED COVER BLOCKS MADE OF SAME GRADE OF CONCRETE
AS THAT OF THE R.C.C MEMBER.
9. SPACER BAR OF 25mm DIA OR DIA OF LARGEST BAR USED AT THE SECTION
Y12-8Nos 3" B 3" SHALL BE PROVIDED AT 1500c/c IN BEAMS WHEREVER TWO OR
3"
MORE LAYERS REINFORCEMENT IS PROVIDED.
2 C2 9"X15" 3 TIESY8@8"c/c 15"X21"
10. FOOTINGS AND COLUMNS ARE DESIGNED FOR G+2 FLOORS ONLY.
2-SETS AS PER ARCHITECTURAL DRAWINGS.
PEDESTAL
Y16- 4Nos + X E
X
REINF ALONG -B
3 C3 9"X15" 4 Y12-4Nos 15"X21"
N
C
COLUMN
F
L
TIESY8@8"c/c
2-SETS
A
REINF ALONG -L
3"
ARCHITECT:
M
DRAWING TITLE :
COLUMN AND FOOTING DETAILS
SCALE DRAWN BY NK
DATE 03-03-2016 DESIGNED BYEK