FOOTING SCHEDULE COLUMNS SCHEDULE

GENERAL NOTES :-
FOOTING SIZE REINFORCEMENT DETAILS 1. THIS DRAWING IS TO BE READ IN
SL.No. FOOTING NUMBER No.of FOOTING SL.No. COLUMN NUMBER COLUMN SIZE No.of COLUMNS REINFORCEMENT DETAILS
LxBxD TOP & BOTTOM STEEL CONJUNCTION WITH ALL OTHER
DRAWINGS AND SPECIFICATIONS
1. F1 1700 x1700 x 350 52 T12 @ 100 mm C/C (BOTHWAY) 1. C1 300 x 300 50 4-T16 Bars & T10@ 150 C/C Ties
WITHIN THE PACKAGE.
2. DO NOT SCALE OFF THIS
2. C2 300 x 300 2 8-T16 Bars & T10@ 150 C/C Ties DRAWING-WRITTEN DIMENSIONS ARE
ALL COLUMNS ARE CENTERED IN FOOTING TO BE TAKEN ONLY.
3. THIS DRAWING MUST NOT BE COPIED
IN WHOLE OR PART WITHOUT PRIOR
1 2 3 4 5 6 7 8 9 10 WRITTEN CONSENT FROM TSCCL /
AECOM.
6250 6250 6250 4500 4500 5000 5000 5000 3700
4. SHOP DRAWINGS TO BE APPROVED BY

- Additional / new 5a 6a 7a 8a
5.
TSCCL BEFORE EXECUTION ON SITE.
MOCKUP SHOULD BE PREPARED FOR
APPROVAL BY CLIENT'S (TSCCL) PRIOR
3858 3858 3858 3858 4069
Footings & columns C1 C1 C1
6.
TO EXECUTION.
IN CASE OF DISCREPANCY BETWEEN
52 I BOQ AND DRAWINGS, DRAWINGS WILL
F1 F1 50 F1 TAKE PRECEDENCE.
7. ALL CONCRETE WORKS IN

3561
ACCORDANCE WITH IS 456:2000
(REVISION 2016).

4300

6000
8. CONTRACTOR TO VERIFY DIMENSIONS
C1
52 H' WITH ARCHITECTURAL DRAWINGS
F1 50 BEFORE EXECUTION.

2439
9. SBC CONSIDERED 12 T/M2 AT 3.0M
DEPTH, HOWEVER SOIL CONDITION TO
C1 C1 C1
BE VERIFIED BEFORE EXECUTION.
H

1122
F1 F1 F1 C1
G''
ISLAND TOP EDGE

52
F1 50

3561
4300

6000
C1
IV C1
F1
52 G'

1317
F1 50
C1 C1 C1
G

5500
F1 F1 F1

2244
C1
55 F'

4300

6000
F1 38
C1
III

3756
F1

C1 2800 C1 C1 C2 2000 C1
F
5500

F1 F1 F1 Y F1 F1

3000
4550 4550 4550 2800 3300 3300

4300
C1 C1 C1 C1 C1 C1 C1 C1
X E X
ISLAND

4300
F1 F1 F1 F1 F1 F1 F1 F1 3300

3000
5500

C1 C1 C1 Y C2 2000 C1
D
F1 F1 F1 F1 F1

3756
C1
II

4300

6000
F1
C1
C' R1 Revised as per new scheme layout GGK VRC 8-10-2021
F1

2244
REV. DESCRIPTION DRN CHK DATE
5500

C1 C1 C1
ISLAND TOP EDGE

1317
F1 F1 F1
C1
CLIENT
C1 B''
I F1 TIRUPATI SMART CITY
4300 CORPORATION LIMITED

6000
F1

3561
C1 PROJECT NAME
B'

1122
Civil Works for Proposed Musical Fountain and Water
C1 C1 C1 F1 Screen at Vinayak Sagar Lake under implementation of
B Smart City Mission in Tirupati
F1 F1 F1

2439
9th Floor,
C1 Infinity Tower C
A' DLF Cyber City,
4300

6000
DLF Phase II
F1 Gurgaon 122002
Haryana, India

3561
T: +91 124 2816000
F: +91 124 2816008
www.aecom.com

C1 C1 C1 SHEET TITLE
A
F1 F1 F1 FOOTING AND COLUMN
LAYOUT PLAN

SCALE DATE RELEASED FOR


NTS 08-10-2021
NORTH

LAYOUT PLAN FOR COLUMN & FOOTINGS


DRAWN. BY : GGK FOR TENDER
CHKD. BY : CVR REVIEW
APPD. BY : - BT SIZE A2 GFC
STATUS
AS BUILT

DRAWING NUMBER REV

ACM-TSC-VS-MF-GFC-DWG-ST-2001 R 1